BLD-Final | 3/29/2016 | 3/29/2016 | 3/29/2016 | P | FAIL |
Mike Jordan
|
|
|
Damon Phone #: ###-####. Provide the city set of approved plans. Tempered glazing required on either side of doorway in hall to masterbedroom. Correction notice posted.
|
BLD-Final | 3/28/2016 | 3/29/2016 | 3/29/2016 | A | NH |
Mike Jordan
|
|
|
Damien Phone #: ###-####
|
BLD-Framing/Rough-in | 1/11/2016 | 1/12/2016 | 1/12/2016 | A | PART |
Mike Jordan
|
|
|
Daimon Phone #: ###-####. All repairs done. Pending mech. rough in inspection.
|
BLD-Framing/Rough-in | 12/29/2015 | 12/29/2015 | 12/29/2015 | P | FAIL |
Mike Jordan
|
|
|
would like call ahead; Bob Phone #: ###-####. Provide the additional LVL at back patio and provide reinspection for mech.
|
BLD-Energy code compliance | 12/4/2015 | 12/4/2015 | 12/4/2015 | P | FAIL |
Dave Hannah
|
|
|
Damon Phone #: ###-#### c/n on site
|
BLD-Framing/Rough-in | 11/30/2015 | 12/1/2015 | 12/2/2015 | P | NR |
Dave Hannah
|
|
|
Bob Phone #: ###-#### needs mec permit and rough in
|
BLD-Wall Bracing | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | DONE |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Wall Bracing | 11/9/2015 | 11/10/2015 | 11/10/2015 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
OVERRIDE | | | 11/9/2015 | | |
|
|
|
|
BLD-Foundation | 10/26/2015 | 10/27/2015 | 10/27/2015 | A | PASS |
Dave Hannah
|
|
|
Damien Phone #: ###-####
|
BLD-Footing | 10/23/2015 | 10/26/2015 | 10/26/2015 | A | PASS |
Dave Hannah
|
|
|
Damion-pour time 10:00 Phone #: ###-####
|
Routing Walk-In (BLD) | 10/23/2015 | 10/23/2015 | 10/23/2015 | A | PASS |
David Ferguson
|
|
|
|
Routing Walk-In (BLD) | 10/22/2015 | 10/22/2015 | 10/23/2015 | A | DONE |
Candy A. Nichols
|
|
|
|
Plan assigned to (BJM) | 10/22/2015 | 10/22/2015 | 10/23/2015 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/23/2015 | | 10/23/2015 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 10/23/2015 | | DONE |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 10/23/2015 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/23/2015 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/23/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Permit Ready to Issue | | | 10/23/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Routing Walk-In (Zoning) | 10/22/2015 | 10/22/2015 | 10/22/2015 | A | PASS |
Colleen T Carroll
|
|
|
|
1st review completed | | | 10/22/2015 | | FAIL |
Brian McGowan
|
|
|
Need foundation plan, wall bracing and beams/headers.
|
Routing - PLAN CHECK | 10/22/2015 | | 10/22/2015 | | FAIL |
Brian McGowan
|
|
|
Need foundation plan, wall bracing beams and headers
|
Application received | | 10/22/2015 | | | |
|
|
|
|