BLD-Foundation | 12/3/2015 | 12/3/2015 | 12/3/2015 | P | PASS |
Jim Sly
|
|
|
Adam Phone #: ###-####
|
BLD-Footing | 11/23/2015 | 11/23/2015 | 11/23/2015 | P | PART |
Jim Sly
|
|
|
pour 2pm; Adam Phone #: ###-#### WIP........
|
OVERRIDE | | | 11/2/2015 | | |
|
|
|
|
Routing Walk-In (Zoning) | 11/2/2015 | 11/2/2015 | 11/2/2015 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 11/2/2015 | 11/2/2015 | 11/2/2015 | A | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 11/2/2015 | | 11/2/2015 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 11/2/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/2/2015 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 11/2/2015 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 10/22/2015 | 10/22/2015 | 10/22/2015 | A | FAIL |
Tisha Gallop
|
|
|
need engineering for retaining walls, cut for new double door in basement wall, engineering if use plexiglass type roof covering. show flashing for hatch and make sure egress window in basement (not including this new opening)
|
1st review completed | | | 10/22/2015 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 10/22/2015 | | | |
|
|
|
|