BLD-Final | 8/11/2016 | 8/12/2016 | 8/12/2016 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
DOC - Permit Finaled | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 5/20/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Phil Shearer
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 5/17/2016 | 5/17/2016 | 5/17/2016 | A | PASS |
Jim Storey
|
|
|
2nd floor ok
|
BLD-Framing/Rough-in | 3/4/2016 | 3/7/2016 | 3/7/2016 | A | PASS |
Jim Storey
|
|
|
Ken Phone #: ###-#### ok to cover lower level.
|
BLD-Framing/Rough-in | 2/26/2016 | 2/29/2016 | 2/29/2016 | A | FAIL |
Jim Storey
|
|
|
Mike Phone #: ###-#### need engineering for all holes in trusses
|
BLD-Wall Bracing | 2/12/2016 | 2/16/2016 | 2/16/2016 | A | PASS |
Phil Shearer
|
|
|
Mike Phone #: ###-####
|
BLD-Conference | 2/9/2016 | 2/10/2016 | 2/10/2016 | A | DONE |
Phil Shearer
|
|
|
Mike Phone #: ###-####
|
BLD-Foundation | 11/19/2015 | 11/20/2015 | 11/20/2015 | A | PASS |
Phil Shearer
|
|
|
Mike Phone #: ###-####
|
BLD-Footing | 11/13/2015 | 11/16/2015 | 11/16/2015 | A | PASS |
Phil Shearer
|
|
|
Mike Phone #: ###-####
|
OVERRIDE | | | 10/22/2015 | | |
|
|
|
|
OVERRIDE | | | 10/22/2015 | | |
|
|
|
|
Routing Walk-In (Zoning) | 10/22/2015 | 10/22/2015 | 10/22/2015 | P | PASS |
Josh Wilson
|
|
|
Ok per R-2.
|
Plan assigned to (BJM) | 10/22/2015 | 10/22/2015 | 10/22/2015 | | DEFR |
Tisha Gallop
|
|
|
|
Routing Walk-In (BLD) | 10/22/2015 | 10/22/2015 | 10/22/2015 | P | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 10/22/2015 | | 10/22/2015 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/22/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/22/2015 | | DONE |
|
|
|
|
1st review completed | | | 10/22/2015 | | FAIL |
Brian McGowan
|
|
|
Need foundation engineered since it was over 4' total height.
|
Routing - PLAN CHECK | 10/22/2015 | | 10/22/2015 | | FAIL |
Brian McGowan
|
|
|
Need additional information or engineered foundation wall since it was over 4' tall.
|
Issue PAID IN FULL permit | | | 10/22/2015 | | DONE |
|
|
|
|
Application received | | 10/22/2015 | | | |
|
|
|
|