DOC - Permit Finaled | | | 1/25/2017 | | DONE |
Christina Prado
|
|
|
As per BLD15-04346 final on 8/9/16
|
FIRE-Final Inspection | 7/22/2016 | 7/22/2016 | 7/22/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per Boise Fire Dept. a man gate will not be required at the new hanger building allowing access to the flight line due to additional fire hydrants near the flight line and vehicle access from a neigboring street and gate.
|
BLD-Aging Inspection | 6/3/2016 | 6/3/2016 | 6/3/2016 | | FAIL |
Jim Storey
|
|
|
|
BLD-Conference | 3/28/2016 | 3/29/2016 | 3/30/2016 | A | PART |
Bill VanDegrift
|
|
|
haven't tested stormdrain, waiting for dry weather
|
BLD-Foundation | 1/20/2016 | 1/21/2016 | 1/21/2016 | P | PASS |
Jim Storey
|
|
|
Matt Phone #: ###-####
|
BLD-Foundation | 1/14/2016 | 1/15/2016 | 1/15/2016 | A | PASS |
Jim Storey
|
|
|
Matt Phone #: ###-####
|
BLD-Foundation | 1/8/2016 | 1/12/2016 | 1/12/2016 | A | PASS |
Jim Storey
|
|
|
Change to AM on 1-12 per Matt Phone #: ###-####
|
BLD-Footing | 1/5/2016 | 1/5/2016 | 1/5/2016 | P | PASS |
Phil Shearer
|
|
|
Matt ###-#### Footings on gird lines 7, and A.
|
Issue PAID IN FULL permit | | | 12/11/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/11/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/9/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/9/2015 | | DONE |
Christina Prado
|
|
|
**ALL REQUIRMENTS MET 12-10-15 /CEV Need GC form & Revised certificate of value for issuance
|
Routing - PLAN CHECK | 12/4/2015 | | 12/9/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 12/4/2015 | | 12/9/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Solid Waste | 12/4/2015 | | 12/9/2015 | | PASS |
Peter J. McCullough
|
|
|
Approved in E-plan review. TLW
|
Routing PW Environmental | 12/4/2015 | | 12/9/2015 | | PASS |
Rick Christenson
|
|
|
Flammable Liquids Interceptor shown.
|
Routing PW Sewer Design | 12/4/2015 | | 12/9/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Plan assigned to (TLW) | 10/27/2015 | | 12/9/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 12/4/2015 | | 12/8/2015 | | PASS |
Daryl Spivey
|
|
|
the existing RCP stormdrain piping is being left in place and is being evaluated and inspected by the engineer as well as the connections of the two new 12" branch lines in accordance with ISPC appendix L.
|
Routing - PLANNING | 12/4/2015 | | 12/4/2015 | | PASS |
Cody Riddle
|
|
|
|
Routing - PUBLIC WORKS | 12/4/2015 | | 12/4/2015 | | PASS |
Rachael Beierle
|
|
|
|
Route to Impact Fee Review | 11/16/2015 | 11/19/2015 | 11/19/2015 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 11/16/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/27/2015 | | 11/16/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 10/27/2015 | | 11/16/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 10/27/2015 | | 11/13/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Environmental | 10/27/2015 | | 11/13/2015 | | FAIL |
Rick Christenson
|
|
|
Flammable Liquids Interceptor Required
|
Routing - PLUMBING | 10/27/2015 | | 11/4/2015 | | FAIL |
Daryl Spivey
|
|
|
unapproved material with in the building must be replaced. pvc with in the building must be min. of schedule 40.
|
Routing PW Sewer Design | 10/27/2015 | | 11/3/2015 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
90 degree connection required with sewer main. Contact Boise public works 48 hours prior to sewer tap to obtain tap permit and schedule inspection.
|
Routing PW Solid Waste | 10/27/2015 | | 10/29/2015 | | FAIL |
Peter J. McCullough
|
|
|
No trash enclosure identified on the site plan.
|
Routing - PLANNING | 10/27/2015 | | 10/28/2015 | | FAIL |
Cody Riddle
|
|
|
The entrance drive needs to intersection the public right-of-way at 90 degrees and a maximum of ten parking spaces are allowed without inclusion of a landscape planter.
|
Routing - FIRE | 10/27/2015 | 10/27/2015 | 10/27/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Pending Assignment by TLW | 10/27/2015 | | 10/27/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing PW Sewer Rating | 10/27/2015 | | 10/27/2015 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Street Lights | 10/27/2015 | | 10/27/2015 | | PASS |
Mike D Hedge
|
|
|
No new street lights required.
|
Routing - PLANNING Land Div | 10/27/2015 | | 10/27/2015 | | PASS |
Dave Abo
|
|
|
Parcel over 5 acres in size.
|
Routing - Addressing | 10/27/2015 | | 10/27/2015 | | PASS |
Emily Dixon
|
|
|
Address corrected to 4240 S Orchard St.
|
Routing - PUBLIC WORKS | 10/27/2015 | | 10/27/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 10/27/2015 | | 10/27/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Foundation permit for new aircraft hangar with support and office spaces.
|
Intake Approval | | | 10/26/2015 | | |
Tim L. Woodard
|
|
|
|
Application received | | | 10/22/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 22 2015 4:47PM
|