First Notice | | 2/1/2016 | 2/11/2016 | | DONE |
|
|
|
Mailed 2-12-16
|
BLD-Final | 1/20/2016 | 1/22/2016 | 1/22/2016 | P | PASS |
Dave Hannah
|
|
|
Change time per Randy Phone #: ###-####
|
Permanent Occupancy | | | 1/22/2016 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/20/2016 | 1/21/2016 | 1/21/2016 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, commercial hood suppression system inspection complete with alarm interface to panel. Fire panel showed trouble for RTU3 at time of inspection, RTU3 supplies space farther down in building, not associated with this space. Life fire safety inspection passed/complete.
|
BLD-Framing/Rough-in | 12/10/2015 | 12/10/2015 | 12/10/2015 | P | PASS |
Dave Hannah
|
|
|
Randy Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/1/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/1/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 11/25/2015 | | |
|
|
|
|
Plan assigned to (JG) | 10/30/2015 | 10/30/2015 | 11/25/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 11/25 L3 Tin Roof Tacos
|
Routing - PLAN CHECK | 11/25/2015 | | 11/25/2015 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/25/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/25/2015 | | DONE |
|
|
|
**12-1-15 no RP needed-as per Evan J. no ESC permit requried for this job-ALL REQUIREMENTS MET CAN***Need RP, GC Form and Revised Cert of Value
|
Routing - PLAN CHECK | 10/30/2015 | | 11/20/2015 | | FAIL |
Javier Guzman
|
|
|
Need engineering
|
Routing - MECHANICAL | 11/20/2015 | | 11/20/2015 | | PASS |
Troy James
|
|
|
approved with redlines
|
1st review completed | | | 11/20/2015 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing Off Site - C.D.H | 10/30/2015 | | 11/19/2015 | | PASS |
Javier Guzman
|
|
|
signed of by Joe Antonucci of CDH in ePlan
|
Routing - MECHANICAL | 10/30/2015 | | 11/17/2015 | | FAIL |
Troy James
|
|
|
eplan, left message to mechanical engineer.
|
Routing PW Sewer Rating | 11/6/2015 | | 11/6/2015 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLUMBING | 10/30/2015 | | 11/5/2015 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - FIRE | 10/30/2015 | 10/30/2015 | 11/3/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - Design Review | 11/3/2015 | | 11/3/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing - Erosion and Sediment | 10/30/2015 | | 11/2/2015 | | PASS |
Evan Jenkins
|
|
|
Restaurant TI including new partitions, commercial kitchen with Type 1 hood, interior finishes, patio roof structure.
|
Routing PW Drainage | 10/30/2015 | | 10/30/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 10/30/2015 | | 10/30/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 10/30/2015 | | 10/30/2015 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 10/30/2015 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 10/27/2015 | | FAIL |
David Ferguson
|
|
|
open up your #502 checklist by clicking on the red exclamation point (!), you'll see my redlined comments indicating those documents that we still need. You indicated on the checklist that you had submitted them but for some reason they didn't come through so they'll have to be uploaded again. The big hurdle as I see it is your Planning approval as we can't accept your application without that.
|
Intake Approval | | | 10/26/2015 | | FAIL |
David Ferguson
|
|
|
The proper application to use for the scope of work described in your submittal documents is actually the #502 form for commercial additions. Please complete and upload this form as well as all of the documents that are indicated on the checklist. That would include items such as your District Health application, Zoning Certificate, Erosion and Sediment Control, fire flow letter, etc.
|
Application received | | | 10/23/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 23 2015 4:52PM
|