Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD15-03931
StatusFinaled
Name CUSTOM STEEL STRUCTURES
Site Address 1416 W BOISE AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
Scope of work is remove existing 1 car garage and construct a new 650 sq ft garage addition, with a bedroom and bathroom above. Also remodel the kitchen in the existing home which includes partial removal of wall separating the kitchen from the living room. Garage is unconditioned and the living space above the garage does not include a kitchen. Electrical, plumbing and HVAC permits will be obtained separately. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/6/20165/6/20165/6/2016PPASS
DetailsJim Storey
would like call ahead; Kurt Phone #: ###-####
DOC - Permit Finaled5/6/20165/6/20165/6/2016PPASS
DetailsJim Storey
BLD-Final5/5/20165/5/20165/5/2016PFAIL
DetailsMike Jordan
Curt Phone #: ###-####-if possible would like early PM. Provide code compliant hand rail and CO detectors.
BLD-Energy code compliance3/14/20163/14/20163/14/2016PPASS
DetailsJim Storey
Curtis Phone #: ###-####
BLD-Framing/Rough-in3/9/20163/10/20163/10/2016APASS
DetailsJim Storey
Kurt Phone #: ###-#### need hvac insp for vent fan and dyrer vent
BLD-Wall Bracing2/19/20162/22/20162/23/2016PPASS
DetailsJim Storey
Kurt Phone #: ###-####
BLD-Footing12/10/201512/11/201512/11/2015APASS
DetailsDave Hannah
Chris Phone #: ###-####
BLD-Footing12/10/201512/10/201512/10/2015PCANC
DetailsMike Jordan
Chris Phone #: ###-####
Routing Walk-In (Zoning)10/26/201510/26/201510/26/2015PDONE
DetailsSue Cummings
Routing Walk-In (BLD)10/26/201510/26/201510/26/2015PPASS
DetailsDavid Ferguson
Plan assigned to (DAF)10/26/201510/26/201510/26/2015 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK10/26/2015 10/26/2015 PASS
DetailsDavid Ferguson
1st review completed  10/26/2015 DONE
DetailsDavid Ferguson
Case Summary (BLD)  10/26/2015 DONE
DetailsDavid Ferguson
Case Summary (BLD)  10/26/2015 DONE
DetailsDavid Ferguson
Inspection Record Card- Bld  10/26/2015 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  10/26/2015 DONE
DetailsDavid Ferguson
Permit Ready to Issue  10/26/2015 DONE
all requirments met
Issue PAID IN FULL permit  10/26/2015 DONE
Application received 10/26/2015