Permit Information
Permit NumberBLD15-03970
StatusFinaled
Name EIGHTH & MAIN CONDOMINIUM ASSOC.
Site Address 800 W MAIN ST Unit: 900
Project NameClenera
Customer Number 
ePlanReviewYes
Description
(CLENERA – 9TH STORY – SOUTHEAST CORNER) Fire sprinkler system used to comply with the high rise provisions of the building code. To create a 4,890 square foot office tenant space on the 9th story of an existing high rise building. Work is to include interior nonbearing walls, interior doors, interior windows, suspended acoustical ceilings, gypsum board soffits, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  3/15/2016 DONE
First Notice 2/28/20163/10/2016 DONE
mailed 3-11-16
Permanent Occupancy  2/18/2016 DONE
BLD-Final2/12/20162/16/20162/16/2016PPASS
DetailsDave Hannah
Larren Phone #: ###-####
FIRE-Final Inspection2/12/20162/16/20162/16/2016APASS
DetailsJim Page
Fire sprinklers complete (FIR15-00875 not attached to project related cases) fire alarms complete, fire extinguishers have current tags, orange cap on smoke detector located in the southeast section (smoke dampener detector) of tenant space needs to be removed before final building inspection. Final life fire safety inspection passed/complete.
BLD-Framing/Rough-in12/14/201512/18/201512/18/2015APASS
DetailsDave Hannah
9th floor; Dustin Phone #: ###-####
Issue PAID IN FULL permit  12/7/2015 DONE
Print Occupancy Form  12/7/2015 DONE
Plan assigned to (CJW)11/12/201511/12/201512/3/2015 PASS
DetailsCarl Westfall
(1st done) CLENERA (Dec 2 - 15 days) Level 3 TI - ePlanReview
Routing - PLAN CHECK11/12/2015 12/3/2015 PASS
DetailsCarl Westfall
Drawings approved
1st review completed  12/3/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/3/2015 DONE
Permit Ready to Issue  12/3/2015 DONE
Needs; GC Form & Revised Cert of Value/// requirements met KRS
Routing - PLUMBING11/12/2015 11/19/2015 PASS
DetailsBill VanDegrift
Routing - Addressing11/12/2015 11/18/2015 PASS
DetailsLaura Hunter
Routing - FIRE11/12/201511/12/201511/17/2015 PASS
DetailsScott Arellano
Comments attached to case.
Routing - MECHANICAL11/12/2015 11/17/2015 PASS
DetailsTroy James
Intake Approval  11/12/2015 PASS
DetailsJason Blais
Prescreen approved by Carl Madsen and plan review fees paid.
Pending Assignment by JCB11/12/2015 11/12/2015 DONE
DetailsJason Blais
Routing - PUBLIC WORKS11/12/2015 11/12/2015 PASS
DetailsRachael Beierle
Application received  10/27/2015 DONE
Application submitted via PDS Online on Oct 27 2015 1:41PM