BLD-Final | 4/28/2016 | 4/29/2016 | 4/29/2016 | P | PASS |
Phil Shearer
|
|
|
Larry Phone #: ###-####
|
DOC - Permit Finaled | 4/29/2016 | 4/29/2016 | 4/29/2016 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Energy code compliance | 2/23/2016 | 2/23/2016 | 2/23/2016 | P | PASS |
Phil Shearer
|
|
|
Larry Phone #: ###-####
|
BLD-Framing/Rough-in | 2/23/2016 | 2/23/2016 | 2/23/2016 | P | PASS |
Phil Shearer
|
|
|
Larry Phone #: ###-####
|
BLD-Framing/Rough-in | 2/19/2016 | 2/19/2016 | 2/19/2016 | P | NR |
Phil Shearer
|
|
|
Larry Phone #: ###-####
|
BLD-Framing/Rough-in | 2/16/2016 | 2/17/2016 | 2/17/2016 | A | PART |
Phil Shearer
|
|
|
Larry Phone #: ###-####. Strap beam to supporting studs over deck and floor to floor straps. OK to insulate.
|
Plan Modification Accepted | | | 2/2/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 2/2/2016 | | 2/2/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 12/17/2015 | 12/17/2015 | 12/17/2015 | P | PASS |
Jim Storey
|
|
|
Larry Phone #: ###-####
|
BLD-Footing | 12/7/2015 | 12/8/2015 | 12/8/2015 | P | PASS |
Phil Shearer
|
|
|
Larry Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/2/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/2/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 11/25/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 11/10/2015 | 11/10/2015 | 11/25/2015 | | DONE |
Brian McGowan
|
|
|
due 11/16 (LOMR) ePlan. 1st Review complete; Failed. Has second full Kitchen in Basement. 11-16-15
|
Routing - PLAN CHECK | 11/25/2015 | | 11/25/2015 | | PASS |
Javier Guzman
|
|
|
Brian M did review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/25/2015 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/25/2015 | | DONE |
|
|
|
all requirments met
|
Routing - PLAN CHECK | 11/24/2015 | | 11/24/2015 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLANNING | 11/19/2015 | | 11/19/2015 | | PASS |
Sue Cummings
|
|
|
No electrical outlet for a stove is allowed in the basement bedroom. The room has a separate entrance, a place to shower and a stove and sink. If ower wants a stove, approval for an ADU is required
|
1st review completed | | | 11/16/2015 | | FAIL |
Brian McGowan
|
|
|
Failed due to full Kitchen in Basement. Plans being resubmitted without second Kitchen.
|
Routing - PLAN CHECK | 11/2/2015 | | 11/16/2015 | | FAIL |
Brian McGowan
|
|
|
Failed due to full Kitchen in Basement. Plans will be resubmitted without second Kitchen
|
Plan assigned to (LEG) Tisha | 11/2/2015 | | 11/10/2015 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - MECHANICAL | 11/2/2015 | | 11/4/2015 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 11/2/2015 | | 11/3/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Flood Plain | 11/2/2015 | | 11/2/2015 | | PASS |
Jim Wyllie
|
|
|
Property is not in a floodplain as per Letter of Map Revision. Jim Wyllie / ###-####
|
Routing - Addressing | 11/2/2015 | | 11/2/2015 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 11/2/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/2/2015 | | DONE |
|
|
|
|
Application received | | | 10/27/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 27 2015 3:09PM
|
Routing - PLANNING | 11/2/2015 | | | | FAIL |
|
|
|
The property does not have apploval for an Accessory Dwelling Unit. Prior appproval required OR get rid of the kitchen
|