BLD-Final | 6/16/2016 | 6/16/2016 | 6/16/2016 | P | PASS |
Phil Shearer
|
|
|
Bill// please call 20 minutes ahead Phone #: ###-####
|
DOC - Permit Finaled | 6/16/2016 | 6/16/2016 | 6/16/2016 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 6/7/2016 | 6/7/2016 | 6/7/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Other | 5/9/2016 | 5/10/2016 | 5/10/2016 | A | CANC |
Tony Young
|
|
|
Bill-gutters & drainage Phone #: ###-####,, wanted public works
|
BLD-Energy code compliance | 3/22/2016 | 3/23/2016 | 3/23/2016 | A | PASS |
Tony Young
|
|
|
would like call ahead; Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 3/14/2016 | 3/15/2016 | 3/15/2016 | P | PASS |
Tony Young
|
|
|
Walt Phone #: ###-####
|
BLD-Other | 3/11/2016 | 3/14/2016 | 3/14/2016 | P | PART |
Tony Young
|
|
|
Bob// sheet rock on fire soffit Phone #: ###-####,, soffits,, work in progress,, ok
|
Plan Modification Accepted | | | 3/10/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 3/10/2016 | | 3/10/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 2/24/2016 | 2/24/2016 | 2/24/2016 | P | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####,, exterior ok to cover
|
BLD-Foundation | 1/14/2016 | 1/15/2016 | 1/15/2016 | A | PASS |
Tony Young
|
|
|
Robert Phone #: ###-####
|
BLD-Footing | 1/12/2016 | 1/13/2016 | 1/13/2016 | A | PART |
Mike Jordan
|
|
|
Dave Phone #: ###-####. Footings ok, noted to contractor no concrete allowed until public approval has been obtained.
|
PubWorks Subgrade Approval | 1/13/2016 | 1/13/2016 | 1/13/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 12/28/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/28/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 12/24/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 11/10/2015 | 11/10/2015 | 12/24/2015 | | DONE |
Brian McGowan
|
|
|
due 11/26 L2 (hillside) ePlan
1st review complete, failed. Erosion and grading need updates; found needed top of wall and footing called out.
Contacted Trey Hoff 11-30-15 about Engineering stamp. He is finishing modifications to plan and will resubmit by the end of the week. 11-30-15 BJM
|
Routing - PLAN CHECK | 12/24/2015 | | 12/24/2015 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 12/24/2015 | | 12/24/2015 | | PASS |
Javier Guzman
|
|
|
Brian M did review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/24/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/24/2015 | | DONE |
Christina Prado
|
|
|
RP Expired
|
Routing - MECHANICAL | 12/23/2015 | | 12/23/2015 | | PASS |
Troy James
|
|
|
revised manual j
|
Routing PW Grading-Hillside | 11/24/2015 | | 11/24/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - Erosion and Sediment | 11/20/2015 | | 11/20/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
WUI Zone A; Permit for the construction of a new 2870 sq. ft., two story (first story 1937 sq. ft., second story 933 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 350 sq. ft. of covered patio/porch, 224 sq. ft. upper deck and a 719 sq. ft. attached garage
|
1st review completed | | | 11/18/2015 | | FAIL |
Brian McGowan
|
|
|
Foundation needed top of wall and footing elevations called out.
Erosion and Grading needed updating.
|
Routing - PLAN CHECK | 11/5/2015 | | 11/18/2015 | | FAIL |
Brian McGowan
|
|
|
Foundation needed top of wall and footing elevations called out.
Erosion and Grading needed updating.
|
Routing - MECHANICAL | 11/5/2015 | | 11/17/2015 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 11/5/2015 | | 11/10/2015 | | FAIL |
Jason C. Taylor
|
|
|
Geotech need updated. See changemarks in ePlan. JCT
|
Plan assigned to (LEG) Tisha | 11/5/2015 | | 11/10/2015 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - Erosion and Sediment | 11/5/2015 | | 11/9/2015 | | FAIL |
Evan Jenkins
|
|
|
ESC Site Map Required. Uploaded document is a Grading Plan. RP liscence has Expired. Need Valid RP for Permits
|
Routing - PUBLIC WORKS | 11/5/2015 | | 11/6/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - FIRE | 11/5/2015 | 11/5/2015 | 11/5/2015 | | PASS |
Scott Arellano
|
|
|
Plans were reviewed for fire department vehicle access and fire hydrant availability. No comments.
|
Routing - PLANNING | 11/5/2015 | | 11/5/2015 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 11/5/2015 | | 11/5/2015 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 11/5/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/5/2015 | | DONE |
|
|
|
|
Intake Approval | | | 11/4/2015 | | FAIL |
|
|
|
Foundation Plans need to be stamped and signed
Missing Footing/foundation sizes
|
Application received | | | 10/28/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 28 2015 7:44AM
|