BLD-Final | 7/26/2016 | 7/27/2016 | 7/27/2016 | A | PASS |
Phil Shearer
|
|
|
Clint Phone #: ###-####
|
DOC - Permit Finaled | 7/27/2016 | 7/27/2016 | 7/27/2016 | P | PASS |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 7/27/2016 | 7/27/2016 | 7/27/2016 | P | PASS |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 7/27/2016 | 7/27/2016 | 7/27/2016 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Energy code compliance | 5/24/2016 | 5/25/2016 | 5/25/2016 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 5/25/2016 | 5/25/2016 | 5/25/2016 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 5/20/2016 | 5/23/2016 | 5/23/2016 | A | PART |
Phil Shearer
|
|
|
Truss bracing A6, Bottom cord nailing on 2PLY girder, Point load support for beam at the stairs, Fire blocking in the down stairs hall. OK to insulate
|
BLD-Wall Bracing | 4/26/2016 | 4/26/2016 | 4/26/2016 | P | PASS |
Phil Shearer
|
|
|
Dave Phone #: ###-####
|
BLD-Foundation | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | PASS |
Phil Shearer
|
|
|
request time 1:00 Phone #: ###-#### Inspection requested via web by tony L
|
BLD-Footing | 2/8/2016 | 2/8/2016 | 2/8/2016 | P | PART |
Mike Jordan
|
|
|
Request time 3:30 Phone #: ###-#### Inspection requested via web by tony L
|
Issue PAID IN FULL permit | | | 12/4/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/4/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 12/3/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 10/29/2015 | 10/29/2015 | 12/3/2015 | | DONE |
Brian McGowan
|
|
|
due 11/11 (floodplain?) LOMR as specified by JT. 1st Review Complete, Failed. 11-09-15 engineering, WUI Zone details ect.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/3/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/3/2015 | | DONE |
|
|
|
|
Telephone call | | | 12/3/2015 | | DONE |
|
|
|
called Leonard to let know permit is ready-left message
|
Routing - PLAN CHECK | 12/2/2015 | | 12/2/2015 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 12/2/2015 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 12/2/2015 | | 12/2/2015 | | PASS |
David Ferguson
|
|
|
|
Plan resubmittals received | | | 12/1/2015 | | DONE |
Christina Prado
|
|
|
Received two sets of revised tall wall & bwl calculations as well as two revised sets of plan sheets marked 2,3,4 & 6; Plans taen to BGM for further review
|
Plan resubmittals received | | | 11/19/2015 | | DONE |
|
|
|
resubmittals received 2 tall wall calcs and 2 sets of sheets 1-8-took to BRian McGowan
|
1st review completed | | | 11/9/2015 | | FAIL |
|
|
|
Tall wall engineering needed, WUI Zine "A" compliance or letter of defensible space needed, update plans to specify 2012 IRC required
|
Routing - PLAN CHECK | 11/5/2015 | | 11/9/2015 | | FAIL |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 10/29/2015 | | 11/5/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 10/29/2015 | | 10/29/2015 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 10/28/2015 | | 10/29/2015 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 10/29/2015 | | 10/29/2015 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Flood Plain | 10/29/2015 | | 10/29/2015 | | CANC |
Jason C. Taylor
|
|
|
LOMR - NO FLOODPLAIN REQUIREMENTS. JCT
|
Plan assigned to (LEG) Tisha | 10/28/2015 | | 10/29/2015 | | DEFR |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/28/2015 | | DONE |
|
|
|
|
Intake Approval | | | 10/28/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/28/2015 | | DONE |
|
|
|
|
Application received | | 10/28/2015 | | | |
|
|
|
|