BLD-Final | 7/14/2016 | 7/14/2016 | 7/14/2016 | P | PASS |
Jim Sly
|
|
|
Rod Phone #: ###-####
|
DOC - Permit Finaled | 7/14/2016 | 7/14/2016 | 7/14/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Foundation | 6/17/2016 | 6/17/2016 | 6/17/2016 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Footing | 6/16/2016 | 6/16/2016 | 6/17/2016 | P | CANC |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Foundation | 6/15/2016 | 6/15/2016 | 6/16/2016 | P | PASS |
Dave Hannah
|
|
|
Ben Phone #: ###-####
|
PubWorks Subgrade Approval | 6/15/2016 | 6/15/2016 | 6/15/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
(F) Reprint permit | | | 5/10/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/10/2016 | | DONE |
|
|
|
Plan Mod
|
Plan assigned to (DAF) | 4/8/2016 | 4/8/2016 | 4/12/2016 | | DONE |
David Ferguson
|
|
|
due 4/14
|
Routing Walk-In (Zoning) | 4/7/2016 | 4/7/2016 | 4/12/2016 | A | PASS |
Celine Acord
|
|
|
|
Case Summary (BLD) | | | 4/12/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2016 | | DONE |
|
|
|
Plan Mod approved
|
Permit Ready to Issue | | | 4/12/2016 | | DONE |
|
|
|
PLEAE DO NOT RE ISSUE
|
Inspection Record Card- Bld | | | 4/12/2016 | | DONE |
|
|
|
|
Telephone call | | | 4/12/2016 | | DONE |
|
|
|
called Ben and Evelyn to let know permit is ready-as per Dve F no fees due-left messge on both phones
|
Routing - PLAN CHECK | 4/8/2016 | | 4/12/2016 | | PASS |
David Ferguson
|
|
|
|
Routing - FIRE | | 4/8/2016 | 4/11/2016 | | PASS |
Ron Johnson
|
|
|
FD Approves building concrete and steel deck within setback.
|
Plan Modification Accepted | | | 4/8/2016 | | DONE |
|
|
|
plan mod-adding a deck to plans-submitted 3 sheets of #2-called Dave F-he said route to P&Z, PW & bldg
|
Routing - PLANNING | 4/8/2016 | | 4/8/2016 | | PASS |
Celine Acord
|
|
|
Approved, per Fire's approval for building materials re: WUI setback
|
Routing PW Grading-Hillside | 4/8/2016 | | 4/8/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Plan Modification Accepted | | | 4/7/2016 | | DONE |
|
|
|
modification; adding a deck to the permit
|
BLD-Energy code compliance | 2/10/2016 | 2/11/2016 | 2/11/2016 | P | PASS |
Jim Sly
|
|
|
Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 2/5/2016 | 2/8/2016 | 2/8/2016 | P | PASS |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
Fees Due Hold | 12/5/2015 | | 12/7/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/25/2015 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 11/24/2015 | 11/24/2015 | 11/24/2015 | P | PASS |
David Ferguson
|
|
|
|
Routing Walk-In (BLD) | 11/24/2015 | 11/24/2015 | 11/24/2015 | P | PASS |
David Ferguson
|
|
|
|
Plan assigned to (DAF) | 11/24/2015 | 11/24/2015 | 11/24/2015 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 11/24/2015 | | 11/24/2015 | | PASS |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 11/24/2015 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 11/24/2015 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/24/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/24/2015 | | DONE |
|
|
|
all requirments met
|
Application received | | | 10/30/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 30 2015 4:04PM
|
1st review completed | | | 10/30/2015 | | FAIL |
David Ferguson
|
|
|
|