Letter of compliance/Occupancy | | | 3/13/2018 | | DONE |
|
|
|
|
Second Notice | | 9/29/2017 | 9/27/2017 | | DONE |
|
|
|
This permit finaled on the web by derek cooper
|
First Notice | 8/24/2017 | 8/24/2017 | 9/19/2017 | | DONE |
Candy A. Nichols
|
|
|
sent in mail 9-20-17
|
BLD-Aging Inspection | 8/24/2017 | 8/24/2017 | 8/24/2017 | | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | PASS |
Jim Storey
|
|
|
zonning complet
|
Zoning Approval | 8/24/2017 | 8/24/2017 | 8/24/2017 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 4/12/2017 | 4/12/2017 | 4/12/2017 | P | PASS |
Jim Storey
|
|
|
Derek Phone #: ###-####
|
Zoning Approval Temp | 4/11/2017 | 4/11/2017 | 4/11/2017 | | DONE |
Andrea Tuning
|
|
|
Bond placed for awnings
|
BLD-Aging Inspection | 3/17/2017 | 3/17/2017 | 3/22/2017 | | DEFR |
Jim Storey
|
|
|
temp pending zoning
|
BLD-Final | 1/18/2017 | 1/18/2017 | 1/18/2017 | P | PEND |
Jim Sly
|
|
|
Duane Phone #: ###-#### Spoke with Duane on phone. A - Architectct to remove awnings from scope of work and City approve. B- install awnings and obtain Zoning final. C- Bond for awnings?
|
Zoning Approval Temp | 11/4/2016 | 11/4/2016 | 11/4/2016 | | PASS |
Josh Wilson
|
|
|
Ok 90-day temp for awnings install.
|
FIRE-Final Inspection | 11/3/2016 | 11/3/2016 | 11/3/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Ceiling Grid Inspection | 10/26/2016 | 10/26/2016 | 10/26/2016 | P | PASS |
Jim Storey
|
|
|
Dwayne Phone #: ###-####
|
BLD-Framing/Rough-in | 9/29/2016 | 9/29/2016 | 9/29/2016 | P | PASS |
Mike Jordan
|
|
|
Duane Phone #: ###-####. Verified nuts on holdown and roof access hangars.
|
BLD-Framing/Rough-in | 9/23/2016 | 9/26/2016 | 9/26/2016 | A | PART |
Jim Storey
|
|
|
Duane Phone #: ###-#### 3 hold downs need nuts / roof access trusses need hangers
|
BLD-Framing/Rough-in | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | DEFR |
Jim Storey
|
|
|
Duane Phone #: ###-#### to monday am
|
BLD-Framing/Rough-in | 9/6/2016 | 9/6/2016 | 9/6/2016 | P | PASS |
Jim Storey
|
|
|
Dwane Phone #: ###-#### exterior and roof ok
|
BLD-Framing/Rough-in | 8/29/2016 | 8/30/2016 | 8/30/2016 | A | PART |
Jim Storey
|
|
|
Duane Phone #: ###-#### need engineer to aprove 2 2x6 at sw2 inlew 4x6 dftreated
|
CHANGE STATUS TO (ISS) | | | 8/1/2016 | | DONE |
|
|
|
Plan Mod
|
(F) Reprint permit | | | 8/1/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 8/1/2016 | | DONE |
|
|
|
Owe Sewer fees
|
Place hold on job | 8/1/2016 | | 8/1/2016 | | DONE |
Brittany Hill
|
|
|
sewer fees due
|
CHANGE STATUS TO (ISS) | | | 8/1/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/1/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 7/29/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 7/12/2016 | 7/12/2016 | 7/29/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/29/2016 | | 7/29/2016 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/29/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/29/2016 | | DONE |
|
|
|
please do not re issue-no fees due
|
Routing - PLAN CHECK | 7/15/2016 | | 7/26/2016 | | FAIL |
Carl D Madsen
|
|
|
The comliance reports do not match up.
|
Routing - PUBLIC WORKS | 7/18/2016 | | 7/26/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Solid Waste | 7/18/2016 | | 7/26/2016 | | PASS |
Peter J. McCullough
|
|
|
Original plans were passed by Megan Durrell. This is an interior modification only.
|
BLD-Foundation | 7/20/2016 | 7/21/2016 | 7/21/2016 | A | PASS |
Jim Storey
|
|
|
wall // Dwaye Phone #: ###-####
|
BLD-Footing | 7/19/2016 | 7/19/2016 | 7/19/2016 | P | DONE |
Jim Storey
|
|
|
Duane-- ###-####
|
BLD-Footing | 7/18/2016 | 7/19/2016 | 7/19/2016 | A | PASS |
Jim Storey
|
|
|
Steve Phone #: ###-####
|
Routing - MECHANICAL | 7/18/2016 | | 7/19/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 7/18/2016 | | 7/19/2016 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
BLD-Footing | 7/15/2016 | 7/18/2016 | 7/18/2016 | A | CANC |
Jim Storey
|
|
|
Duane Phone #: ###-####
|
Routing PW Street Lights | 7/18/2016 | | 7/18/2016 | | PASS |
Tom Marshall
|
|
|
|
Plan Modification Accepted | | | 7/12/2016 | | DONE |
Christina Prado
|
|
|
Requested to update interior wall locations and add dimising walls
|
Issue PAID IN FULL permit | | | 7/5/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/5/2016 | | DONE |
|
|
|
|
Extend Review Timeline | | | 4/13/2016 | | DONE |
|
|
|
1st approve 180 day extension per Jason B. See documents
|
Expiration Notice | 4/7/2016 | 4/28/2016 | 4/7/2016 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 3/9/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 2/24/2016 | 2/24/2016 | 3/9/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 2/29/2016 | | 3/9/2016 | | PASS |
Carl D Madsen
|
|
|
Plan mod to add storefront to previous approved design. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/9/2016 | | DONE |
Christina Prado
|
|
|
***5-23-16 MET*** Needs; ACHD
***NOT A PLAN MOD. PERMIT HAS NEVER BEEN ISSUED*** Need ACHD, RP, GC & Revised Certificate of value for issuance
|
Routing - Design Review | 2/29/2016 | | 3/2/2016 | | PASS |
Josh Wilson
|
|
|
New south elevation complies with conditions of DR approval.
|
Plan Modification Accepted | | | 2/24/2016 | | DONE |
Christina Prado
|
|
|
Per request from Architects - Plan Modification to add exterior windows to plans
|
OVERRIDE | | | 1/6/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 11/30/2015 | 11/30/2015 | 1/6/2016 | | PASS |
Carl D Madsen
|
|
|
Broadway Shell Building First review completed
|
Routing - PLAN CHECK | 12/16/2015 | | 1/6/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 12/16/2015 | | 1/6/2016 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/6/2016 | | DONE |
Christina Prado
|
|
|
Need ACHD, RP, GC form & Revised certificate of value for issuance
|
Routing - PLANNING | 12/16/2015 | | 12/16/2015 | | PASS |
Josh Wilson
|
|
|
Ok per revised elevations
|
Route to Impact Fee Review | 12/7/2015 | 12/10/2015 | 12/10/2015 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 12/7/2015 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 11/3/2015 | | 12/7/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 11/3/2015 | | 12/7/2015 | | FAIL |
Carl D Madsen
|
|
|
|
Plan assigned to (AJS) | 11/3/2015 | 11/3/2015 | 11/30/2015 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
shell
|
Routing PW Sewer Design | 11/4/2015 | | 11/18/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - FIRE | 11/3/2015 | 11/3/2015 | 11/17/2015 | | PASS |
Scott Arellano
|
|
|
Attached review comments to plans.
|
Routing - PLUMBING | 11/3/2015 | | 11/9/2015 | | PASS |
Daryl Spivey
|
|
|
per plans and ISPC
|
Routing - Design Review | 11/3/2015 | | 11/6/2015 | | FAIL |
Josh Wilson
|
|
|
DRH15-00052 required additional design interest on south elevation. Submit landscape plan.
|
Routing PW Drainage | 11/4/2015 | | 11/4/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 11/4/2015 | | 11/4/2015 | | PASS |
Mike D Hedge
|
|
|
No new street lights required.
|
Routing PW Solid Waste | 11/4/2015 | | 11/4/2015 | | PASS |
Megan Durrell
|
|
|
Gates on trash enclosure must swing open AT LEAST 120 degrees
|
Routing - PLANNING Land Div | 11/3/2015 | | 11/4/2015 | | PASS |
Dave Abo
|
|
|
Parcel C of ROS #10091.
|
Routing - Addressing | 11/3/2015 | | 11/4/2015 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 11/3/2015 | | 11/4/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 11/3/2015 | | 11/4/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(SHELL AND CORE) New 4,835 retail shell building with limited site work
|
Application received | | | 11/3/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 3 2015 7:37AM
|
Intake Approval | | | 11/3/2015 | | FAIL |
|
|
|
See the changemarks on the submitted checklist
|
Intake Approval | | | 11/3/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 11/3/2015 | | 11/3/2015 | | DONE |
Tim L. Woodard
|
|
|
|