Permit Information
Permit NumberBLD15-04035
StatusFinaled
Name RRC CONTRACTORS
Site Address 1624 S BROADWAY AVE
Project NameBroadway Retail Pad South
Customer Number 
ePlanReviewYes
Description
(SHELL ONLY) ""PLAN MODIFICATION TO SEPARATE THE BUILDING INTO THREE TENANT SPACES AND ADD ADDITIONAL CORE RESTROOMS AND MECHANICAL UNITS"" Permit for the construction of a new 4,835 sq. ft. building with work to include concrete foundation with slab on grade and a wood framed structure per the approved plans. This shell was evaluated under Ashrae 90.1 all future improvements are required to comply with Ashrae 90.1 for energy compliance. This building is not fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  3/13/2018 DONE
Second Notice 9/29/20179/27/2017 DONE
This permit finaled on the web by derek cooper
First Notice8/24/20178/24/20179/19/2017 DONE
DetailsCandy A. Nichols
sent in mail 9-20-17
BLD-Aging Inspection8/24/20178/24/20178/24/2017 PASS
DetailsJim Storey
DOC - Permit Finaled8/24/20178/24/20178/24/2017PPASS
DetailsJim Storey
zonning complet
Zoning Approval8/24/20178/24/20178/24/2017 DONE
DetailsAndrea Tuning
BLD-Final4/12/20174/12/20174/12/2017PPASS
DetailsJim Storey
Derek Phone #: ###-####
Zoning Approval Temp4/11/20174/11/20174/11/2017 DONE
DetailsAndrea Tuning
Bond placed for awnings
BLD-Aging Inspection3/17/20173/17/20173/22/2017 DEFR
DetailsJim Storey
temp pending zoning
BLD-Final1/18/20171/18/20171/18/2017PPEND
DetailsJim Sly
Duane Phone #: ###-####
Spoke with Duane on phone. A - Architectct to remove awnings from scope of work and City approve. B- install awnings and obtain Zoning final. C- Bond for awnings?
Zoning Approval Temp11/4/201611/4/201611/4/2016 PASS
DetailsJosh Wilson
Ok 90-day temp for awnings install.
FIRE-Final Inspection11/3/201611/3/201611/3/2016PPASS
DetailsTroy Cobbley
Life safety passed.
BLD-Ceiling Grid Inspection10/26/201610/26/201610/26/2016PPASS
DetailsJim Storey
Dwayne Phone #: ###-####
BLD-Framing/Rough-in9/29/20169/29/20169/29/2016PPASS
DetailsMike Jordan
Duane Phone #: ###-####. Verified nuts on holdown and roof access hangars.
BLD-Framing/Rough-in9/23/20169/26/20169/26/2016APART
DetailsJim Storey
Duane Phone #: ###-#### 3 hold downs need nuts / roof access trusses need hangers
BLD-Framing/Rough-in9/23/20169/23/20169/23/2016PDEFR
DetailsJim Storey
Duane Phone #: ###-#### to monday am
BLD-Framing/Rough-in9/6/20169/6/20169/6/2016PPASS
DetailsJim Storey
Dwane Phone #: ###-#### exterior and roof ok
BLD-Framing/Rough-in8/29/20168/30/20168/30/2016APART
DetailsJim Storey
Duane Phone #: ###-#### need engineer to aprove 2 2x6 at sw2 inlew 4x6 dftreated
CHANGE STATUS TO (ISS)  8/1/2016 DONE
Plan Mod
(F) Reprint permit  8/1/2016 DONE
CHANGE STATUS TO (RDY)  8/1/2016 DONE
Owe Sewer fees
Place hold on job8/1/2016 8/1/2016 DONE
DetailsBrittany Hill
sewer fees due
CHANGE STATUS TO (ISS)  8/1/2016 DONE
(F) Reprint permit  8/1/2016 DONE
OVERRIDE  7/29/2016  
Plan assigned to (CDM)7/12/20167/12/20167/29/2016 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK7/29/2016 7/29/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  7/29/2016 DONE
Permit Ready to Issue  7/29/2016 DONE
please do not re issue-no fees due
Routing - PLAN CHECK7/15/2016 7/26/2016 FAIL
DetailsCarl D Madsen
The comliance reports do not match up.
Routing - PUBLIC WORKS7/18/2016 7/26/2016 PASS
DetailsRachael Beierle
Routing PW Solid Waste7/18/2016 7/26/2016 PASS
DetailsPeter J. McCullough
Original plans were passed by Megan Durrell. This is an interior modification only.
BLD-Foundation7/20/20167/21/20167/21/2016APASS
DetailsJim Storey
wall // Dwaye Phone #: ###-####
BLD-Footing7/19/20167/19/20167/19/2016PDONE
DetailsJim Storey
Duane-- ###-####
BLD-Footing7/18/20167/19/20167/19/2016APASS
DetailsJim Storey
Steve Phone #: ###-####
Routing - MECHANICAL7/18/2016 7/19/2016 PASS
DetailsTroy James
Routing - PLUMBING7/18/2016 7/19/2016 PASS
DetailsBill VanDegrift
per plans and ISPC
BLD-Footing7/15/20167/18/20167/18/2016ACANC
DetailsJim Storey
Duane Phone #: ###-####
Routing PW Street Lights7/18/2016 7/18/2016 PASS
DetailsTom Marshall
Plan Modification Accepted  7/12/2016 DONE
DetailsChristina Prado
Requested to update interior wall locations and add dimising walls
Issue PAID IN FULL permit  7/5/2016 DONE
Inspection Record Card- Bld  7/5/2016 DONE
Extend Review Timeline  4/13/2016 DONE
1st approve 180 day extension per Jason B. See documents
Expiration Notice4/7/20164/28/20164/7/2016 DONE
DetailsBrittany Hill
OVERRIDE  3/9/2016  
Plan assigned to (CDM)2/24/20162/24/20163/9/2016 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK2/29/2016 3/9/2016 PASS
DetailsCarl D Madsen
Plan mod to add storefront to previous approved design. TLW
PLANS/APPL TAKEN TO FRONT DESK  3/9/2016 DONE
Permit Ready to Issue  3/9/2016 DONE
DetailsChristina Prado
***5-23-16 MET*** Needs; ACHD

***NOT A PLAN MOD. PERMIT HAS NEVER BEEN ISSUED*** Need ACHD, RP, GC & Revised Certificate of value for issuance
Routing - Design Review2/29/2016 3/2/2016 PASS
DetailsJosh Wilson
New south elevation complies with conditions of DR approval.
Plan Modification Accepted  2/24/2016 DONE
DetailsChristina Prado
Per request from Architects - Plan Modification to add exterior windows to plans
OVERRIDE  1/6/2016  
Plan assigned to (CDM)11/30/201511/30/20151/6/2016 PASS
DetailsCarl D Madsen
Broadway Shell Building First review completed
Routing - PLAN CHECK12/16/2015 1/6/2016 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL12/16/2015 1/6/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  1/6/2016 DONE
Permit Ready to Issue  1/6/2016 DONE
DetailsChristina Prado
Need ACHD, RP, GC form & Revised certificate of value for issuance
Routing - PLANNING12/16/2015 12/16/2015 PASS
DetailsJosh Wilson
Ok per revised elevations
Route to Impact Fee Review12/7/201512/10/201512/10/2015 PASS
DetailsCindy M. Gould
1st review completed  12/7/2015 FAIL
Routing Off Site - STRUCTURAL11/3/2015 12/7/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK11/3/2015 12/7/2015 FAIL
DetailsCarl D Madsen
Plan assigned to (AJS)11/3/201511/3/201511/30/2015 DEFR
DetailsAdele J Schaffeld-Griffin
shell
Routing PW Sewer Design11/4/2015 11/18/2015 PASS
DetailsKyle S. Rosenmeyer
Routing - FIRE11/3/201511/3/201511/17/2015 PASS
DetailsScott Arellano
Attached review comments to plans.
Routing - PLUMBING11/3/2015 11/9/2015 PASS
DetailsDaryl Spivey
per plans and ISPC
Routing - Design Review11/3/2015 11/6/2015 FAIL
DetailsJosh Wilson
DRH15-00052 required additional design interest on south elevation. Submit landscape plan.
Routing PW Drainage11/4/2015 11/4/2015 PASS
DetailsBrian Murphy
Routing PW Street Lights11/4/2015 11/4/2015 PASS
DetailsMike D Hedge
No new street lights required.
Routing PW Solid Waste11/4/2015 11/4/2015 PASS
DetailsMegan Durrell
Gates on trash enclosure must swing open AT LEAST 120 degrees
Routing - PLANNING Land Div11/3/2015 11/4/2015 PASS
DetailsDave Abo
Parcel C of ROS #10091.
Routing - Addressing11/3/2015 11/4/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS11/3/2015 11/4/2015 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment11/3/2015 11/4/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

(SHELL AND CORE) New 4,835 retail shell building with limited site work
Application received  11/3/2015 DONE
Application submitted via PDS Online on Nov 3 2015 7:37AM
Intake Approval  11/3/2015 FAIL
See the changemarks on the submitted checklist
Intake Approval  11/3/2015 PASS
Pending Assignment by TLW11/3/2015 11/3/2015 DONE
DetailsTim L. Woodard