(BRICKS & MINIFIGS) For minor tenant improvements to an existing 3,727 sq. ft. building including a 544 sq. ft. covered drive thru previously occupied as a bank with work to include minor alterations to the existing restrooms to make them more accessible, alterations to the existing teller line to create an accessible sales and service counter and installation of related interior finishes. Modifications to the existing restrooms, door hardware and modifications to the teller line meet the requirements for 20% accessibility upgrades. This building is not fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 3/14/20165/12/2016 DONE
didn't send out-received 1st final val
First Notice 3/14/20164/12/2016 DONE
Mailed 4-13-16
Permanent Occupancy  4/5/2016 DONE
Permanent Occupancy  3/4/2016 DONE
Print Occupancy Form  3/4/2016 DONE
Permanent Occupancy  3/4/2016 DONE
BLD-Final3/2/20163/3/20163/3/2016APASS
DetailsJim Sly
Brook Phone #: ###-####
ADA hardware installed OK for Perm. Occ.
FIRE-Final Inspection3/2/20163/2/20163/2/2016PPASS
DetailsTroy Cobbley
Life safety passed. Per owner, she contacted Carl in plan review and only the door hardware for the Activity Room needs to be ADA (has not been installed yet).
FIRE-Final Inspection2/29/20163/1/20163/1/2016AFAIL
DetailsTroy Cobbley
Provide annual inspection for the two fire extinguishers and mount the one in the sales area, remove the thumbturn deadbolt from the east exit. Contact plan review for possible ADA door hardware requirements due to occupancy change. Address is on the sign along fairview
FIRE-Final Inspection2/12/20162/16/20162/16/2016ACANC
DetailsTroy Cobbley
Per Brook Phone #: ###-#### due to door hardware issues. I did stop by job site in the afternoon but no one was there.
Issue PAID IN FULL permit  11/12/2015 DONE
Plan assigned to (CDM)11/3/201511/3/201511/10/2015 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK  11/10/2015 PASS
DetailsCarl D Madsen
1st review completed  11/10/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/10/2015 DONE
Case Summary (BLD)  11/10/2015 DONE
Permit Ready to Issue  11/10/2015 DONE
Need GC Form and Revised Cert of Value
Inspection Record Card- Bld  11/10/2015 DONE
Telephone call  11/10/2015 DONE
called Josh to let know permit is ready and that we need the GC and rev cert of val. He will tell the owner
Routing - Addressing11/3/2015 11/3/2015 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS  11/3/2015 PASS
Plans ACCEPTED BY PLAN TECH  11/3/2015 DONE
Intake Approval  11/3/2015 PASS
as per Carl Madsen
Recd Pcfee & Taken To Pln CK  11/3/2015 DONE
Application received 11/3/2015