Print Statement | | | 11/14/2017 | | DONE |
|
|
|
sent 1st late notice
|
Print Statement | | | 8/2/2017 | | DONE |
|
|
|
|
First Notice | | 5/22/2017 | 6/13/2017 | | DONE |
|
|
|
sent in mail 6-13-17
|
Case Summary (BLD) | | | 6/8/2017 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/8/2017 | | DONE |
|
|
|
|
BLD-Final | 5/12/2017 | 5/12/2017 | 5/12/2017 | P | PASS |
Tony Young
|
|
|
Kent Phone #: ###-####,, ok for perm occ now
|
FIRE-Final Inspection | 5/12/2017 | 5/12/2017 | 5/12/2017 | P | PASS |
Scott Arellano
|
|
|
Corrections items completed.
|
PubWorks Occupancy Approval | 5/12/2017 | 5/12/2017 | 5/12/2017 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 5/12/2017 | | DONE |
|
|
|
|
BLD-Conference | 5/3/2017 | 5/4/2017 | 5/5/2017 | P | PEND |
Tony Young
|
|
|
Kent,, follow up
|
BLD-Final | 5/2/2017 | 5/3/2017 | 5/3/2017 | A | PEND |
Tony Young
|
|
|
Kent
|
BLD-Final | 5/1/2017 | 5/3/2017 | 5/3/2017 | A | PART |
Tony Young
|
|
|
Kent,, c/n gave a list of open permits
|
BLD-Conference | 5/1/2017 | 5/2/2017 | 5/2/2017 | A | NR |
Tony Young
|
|
|
Kent
|
BLD-Final | 5/1/2017 | 5/1/2017 | 5/1/2017 | P | PEND |
Tony Young
|
|
|
Kent,, still working on grab bars,, need other full sign offs
|
BLD-Final | 4/27/2017 | 4/28/2017 | 4/28/2017 | P | PART |
Tony Young
|
|
|
Kent Phone #: ###-####,, temp occ ok
|
FIRE-Final Inspection | 4/27/2017 | 4/28/2017 | 4/28/2017 | P | PART |
Scott Arellano
|
|
|
Correction items are as follows: 1) Provide emergency lighting at elevator lobby areas on floors 3, 4, 5 and laundry room. 2) Provide fire extinguisher in corridor outside conference meeting rooms, per plan. 3) Add "roof top access" signage to exit door at street level at north west stairwell.
|
Temporary Occupancy | 4/28/2017 | 7/27/2017 | 4/28/2017 | | DONE |
Tisha Gallop
|
|
|
|
Zoning Approval | 4/26/2017 | 4/26/2017 | 4/26/2017 | | PASS |
Katelyn Menuge
|
|
|
Design Review Pass
|
PubWorks Temp Occupancy Appr | 4/25/2017 | 4/25/2017 | 4/25/2017 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Conference | 4/19/2017 | 4/19/2017 | 4/19/2017 | P | PART |
Tony Young
|
|
|
Kent Phone #: ###-####,, walk through with the plan reviewer,, need trades,, fire caulking, signage, ADA bars,, pool ADA lifts, pool enclosure issues,, door swing presures verified on ADA doors,, self closing on laundry chute doors, etc,, see Kent for list
|
BLD-Conference | 4/18/2017 | 4/19/2017 | 4/19/2017 | A | DEFR |
Tony Young
|
|
|
Kent Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/10/2017 | 4/10/2017 | 4/11/2017 | P | PASS |
Dave Hannah
|
|
|
Kent Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | PART |
Tony Young
|
|
|
level 2 &3 storage - Kent Phone #: ###-####,, grids ok
|
BLD-Other | 3/28/2017 | 4/3/2017 | 4/4/2017 | P | NR |
Dave Hannah
|
|
|
elevator smoke: Lan Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/3/2017 | 4/3/2017 | 4/3/2017 | P | PART |
Jim Sly
|
|
|
kent Phone #: ###-#### Ceiling and Firestopping.....3rd Flr Corridor. 4 and 5th flr laundry rooms.
|
BLD-Ceiling Grid Inspection | 3/22/2017 | 3/23/2017 | 3/23/2017 | A | PEND |
Tony Young
|
|
|
Kent Phone #: ###-####,, needs manf specs on vertical application..
|
BLD-Ceiling Grid Inspection | 3/15/2017 | 3/16/2017 | 3/16/2017 | A | PART |
Tony Young
|
|
|
Kent Phone #: ###-####,, fixes were made,, ok on main level pending trades,, shaft walls work in progress
|
BLD-Ceiling Grid Inspection | 3/8/2017 | 3/9/2017 | 3/9/2017 | A | PART |
Dave Hannah
|
|
|
5th floor ok to flood ground level ok but needs to go thourgh oa counter sprey wires that are out of plumb
|
BLD-Framing/Rough-in | 2/24/2017 | 2/27/2017 | 2/27/2017 | A | PART |
Tony Young
|
|
|
Kent Phone #: ###-####,, shaft walls 4th and 5th ok
|
BLD-Framing/Rough-in | 2/8/2017 | 2/8/2017 | 2/8/2017 | P | PART |
Dave Hannah
|
|
|
brent Phone #: ###-#### thrid floor hard lid at elevator ok to cover
|
BLD-Framing/Rough-in | 1/31/2017 | 2/1/2017 | 2/1/2017 | A | PART |
Tony Young
|
|
|
Kent Phone #: ###-####,, main level drops ok
|
BLD-Framing/Rough-in | 1/30/2017 | 1/30/2017 | 1/30/2017 | P | NR |
Mike Jordan
|
|
|
1st floor; Kent Phone #: ###-####
|
BLD-Framing/Rough-in | 1/27/2017 | 1/27/2017 | 1/27/2017 | P | PART |
Tony Young
|
|
|
level 1; kent Phone #: ###-####///// 2, 3 and 7 hard lid ceiling on ground floor levels ok
|
BLD-Framing/Rough-in | 1/26/2017 | 1/27/2017 | 1/27/2017 | A | FAIL |
Dave Hannah
|
|
|
Kent Phone #: ###-#### fire stopping on first floor
|
BLD-Framing/Rough-in | 1/24/2017 | 1/25/2017 | 1/25/2017 | A | PART |
Tony Young
|
|
|
Kent Phone #: ###-####,, lobby areas for hard lids,, need to finish fire caulking,, add backing for 16" o. c.,, also 5th floor laundry chute shaft walls,, ok to continue with both layers of 5/8th" off set seams
|
BLD-Framing/Rough-in | 1/19/2017 | 1/19/2017 | 1/19/2017 | P | PART |
Tony Young
|
|
|
level 1 & 4; Kent Phone #: ###-####,, soffit areas ok
|
BLD-Framing/Rough-in | 1/17/2017 | 1/17/2017 | 1/17/2017 | P | PART |
Tony Young
|
|
|
###-####; Kent,, 5th lobby drops ok,, 3rd drops ok pending minor areas of firecaulking
|
BLD-Wall Bracing | 1/4/2017 | 1/5/2017 | 1/5/2017 | A | CANC |
Dave Hannah
|
|
|
2nd floor // Kent Phone #: ###-####
|
BLD-Framing/Rough-in | 1/4/2017 | 1/5/2017 | 1/5/2017 | A | PART |
Dave Hannah
|
|
|
2nd floor // Kent Phone #: ###-#### drops on fl two ok and drops in hallway on 4 ok
|
BLD-Wall cover | 12/22/2016 | 12/23/2016 | 12/23/2016 | P | PASS |
Tony Young
|
|
|
Kent Phone #: ###-####,, 3rd floor room drops
|
BLD-Framing/Rough-in | 12/22/2016 | 12/22/2016 | 12/22/2016 | P | PART |
Tony Young
|
|
|
Kent Phone #: ###-####,, 3rd floor bathroom and in room drops,, need to fix a few areas,, list of rooms given to Kent
|
BLD-Framing/Rough-in | 12/14/2016 | 12/15/2016 | 12/15/2016 | A | PART |
Tony Young
|
|
|
Kent Phone #: ###-####,, main level ok except areas 5 and 10
|
BLD-Framing/Rough-in | 12/8/2016 | 12/9/2016 | 12/9/2016 | P | PART |
Jim Sly
|
|
|
Phone #: ###-#### 4th floor.......small drop ceilings and utility chases OK to cover. 1st floor areas 4 and 6 Framing Ok....Ok to insulate.
|
BLD-Framing/Rough-in | 12/2/2016 | 12/2/2016 | 12/2/2016 | P | PART |
Tony Young
|
|
|
Kip Phone #: ###-####,, 1st level area 2 ok pending trades
|
BLD-Framing/Rough-in | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | PART |
Tony Young
|
|
|
Kent/// level 1 Phone #: ###-####,, area 1,, walls only,, repair fireblocks,, verify sill plate anchorage,, also relooked at and failed 4th floor chases,, need to redo some penetrations
|
BLD-Framing/Rough-in | 11/21/2016 | 11/22/2016 | 11/22/2016 | A | PART |
Tony Young
|
|
|
4th floor; kent Phone #: ###-####,, fourth floor rooms ok to cover
|
BLD-Wall cover | 11/18/2016 | 11/18/2016 | 11/18/2016 | P | PART |
Tony Young
|
|
|
drop ceiling 5th floor // Kent Phone #: ###-####, up to room 525 ok
|
BLD-Wall cover | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | NR |
Tony Young
|
|
|
drop ceiling 5th floor // Kent Phone #: ###-####
|
BLD-Framing/Rough-in | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | PART |
Tony Young
|
|
|
drop ceiling 5th floor // Kent Phone #: ###-####,, east wing ,, need to repair a couple areas,, will re-inspect
|
BLD-Conference | 11/16/2016 | 11/16/2016 | 11/16/2016 | P | PEND |
Tony Young
|
|
|
2nd floor insulation - Kent Phone #: ###-####,, ?s about laundry chute,, asked them to ask plan review
|
BLD-Energy code compliance | 11/16/2016 | 11/16/2016 | 11/16/2016 | P | PASS |
Tony Young
|
|
|
2nd floor insulation - Kent Phone #: ###-####
|
BLD-Wall cover | 10/24/2016 | 10/25/2016 | 10/25/2016 | P | PASS |
Tony Young
|
|
|
Kent Phone #: ###-####,, 4th and 5th floor chases,, verify fire caulking
|
BLD-Wall cover | 10/21/2016 | 10/24/2016 | 10/24/2016 | A | PART |
Tony Young
|
|
|
// Kent Phone #: ###-####,, 4th floor chases,, verify fire caulking,, mostly done,, see paint marks
|
BLD-Other | 10/20/2016 | 10/21/2016 | 10/21/2016 | A | NR |
Tony Young
|
|
|
// Kent Phone #: ###-####,, 4th floor chases
|
BLD-Wall cover | 10/19/2016 | 10/20/2016 | 10/20/2016 | A | NR |
Tony Young
|
|
|
// Kent Phone #: ###-####,, 4th floor chases,, fire caulking not complete
|
BLD-Wall cover | 10/18/2016 | 10/19/2016 | 10/19/2016 | A | CANC |
Tony Young
|
|
|
// Kent Phone #: ###-####,, 4th floor chases
|
BLD-Framing/Rough-in | 10/17/2016 | 10/18/2016 | 10/18/2016 | A | PART |
Tony Young
|
|
|
2nd floor // Kent Phone #: ###-####,, ok to insulate,, need to take care of a few fire caulking holes,, (4 areas)
|
BLD-Energy code compliance | 10/17/2016 | 10/18/2016 | 10/18/2016 | A | PART |
Tony Young
|
|
|
3rd floor insulation on the west side // Kent Phone #: ###-####,, ok to cover
|
BLD-Framing/Rough-in | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | PASS |
Mike Jordan
|
|
|
Kent// 3rd floor Phone #: ###-####
|
BLD-Energy code compliance | 10/7/2016 | 10/7/2016 | 10/7/2016 | A | PASS |
Mike Jordan
|
|
|
Kent// 3rd floor Phone #: ###-####. 3rd floor east wing and central wing ok to cover. Not insulated on west wing yet.
|
BLD-Framing/Rough-in | 10/5/2016 | 10/6/2016 | 10/6/2016 | A | NR |
Jim Sly
|
|
|
Kent// 3rd floor Phone #: ###-#### Complete Firestopping and re-call.
|
BLD-Energy code compliance | 9/29/2016 | 9/30/2016 | 9/30/2016 | A | PART |
Tony Young
|
|
|
Kent Phone #: ###-####,, 4th floor walls ok
|
BLD-Energy code compliance | 9/28/2016 | 9/29/2016 | 9/29/2016 | P | PART |
Tony Young
|
|
|
Kent// 5th floor Phone #: ###-####,, ok to cover except corner rooms where more engineering is needed,, also ok to insulate 4th floor pending trades
|
BLD-Energy code compliance | 9/27/2016 | 9/28/2016 | 9/28/2016 | P | NR |
Tony Young
|
|
|
Kent// 5th floor Phone #: ###-####
|
BLD-Framing/Rough-in | 9/27/2016 | 9/28/2016 | 9/28/2016 | A | PASS |
Tony Young
|
|
|
Kent// 4th floor Phone #: ###-####,, frame ok,, ok to insulate
|
BLD-Framing/Rough-in | 9/26/2016 | 9/27/2016 | 9/27/2016 | A | PART |
Tony Young
|
|
|
Kent// 4th floor Phone #: ###-####,, frame ok pending trades
|
BLD-Framing/Rough-in | 8/30/2016 | 9/1/2016 | 9/2/2016 | P | PART |
Jim Sly
|
|
|
5th; Kent Phone #: ###-#### Energy code.....OK.
|
BLD-Framing/Rough-in | 8/29/2016 | 8/30/2016 | 8/30/2016 | P | PART |
Tony Young
|
|
|
5th; Kent Phone #: ###-####,, all walls ok to insulate on 5th floor,, need approval from fire sprinklers prior to ceiling cover,, 4 corner areas of 5th floor not ok for ceiling cover until new engineering gets completed and inspected
|
BLD-Framing/Rough-in | 8/26/2016 | 8/29/2016 | 8/29/2016 | A | PART |
Tony Young
|
|
|
5th; Kent Phone #: ###-####,, late or pm/// ok to insulate walls on 5th floor,, ceilings need sign off from sprinklers,, also need new and complete truss engineering as built
|
BLD-Framing/Rough-in | 8/25/2016 | 8/26/2016 | 8/26/2016 | P | NR |
Tony Young
|
|
|
5th; Kent Phone #: ###-####,,, work in progress
|
BLD-Conference | 8/24/2016 | 8/25/2016 | 8/25/2016 | P | NR |
Tony Young
|
|
|
5th; Kent Phone #: ###-####,, truss engineering issues ?s
|
BLD-Framing/Rough-in | 8/23/2016 | 8/24/2016 | 8/24/2016 | P | NR |
Tony Young
|
|
|
5th; Kent Phone #: ###-####,, re walk job with truss engineering,, most ok,, need more info on fixes, need truss calcs per built,, etc,, notes with Josh
|
BLD-Framing/Rough-in | 8/22/2016 | 8/23/2016 | 8/23/2016 | A | NR |
Tony Young
|
|
|
Kent-5th floor Phone #: ###-####,, needs fire caulk completed,, truss engineering,, shims in headers, etc
|
BLD-Wall Bracing | 8/16/2016 | 8/16/2016 | 8/16/2016 | P | PART |
Tony Young
|
|
|
Shear wall Phone #: ###-####,, interior shear walls ok
|
BLD-Wall Bracing | 8/15/2016 | 8/16/2016 | 8/16/2016 | A | PART |
Tony Young
|
|
|
Shear wall Phone #: ###-####,, hallways ok
|
BLD-Footing | 8/15/2016 | 8/16/2016 | 8/16/2016 | A | PART |
Tony Young
|
|
|
Phone #: ###-####,, dumpster enclosure ok pending SI
|
BLD-Framing/Rough-in | 8/12/2016 | 8/15/2016 | 8/15/2016 | A | PART |
Tony Young
|
|
|
Shear wall Phone #: ###-####,, all interior shear.. most ok,, need to touch up a few minor areas
|
BLD-Framing/Rough-in | 8/5/2016 | 8/8/2016 | 8/8/2016 | P | PART |
Tony Young
|
|
|
Kent Phone #: ###-####,, 1st floor exterior walls ok to insulate from ceiling down 3 ft,, also 2nd and 3rd floor corridor ceilings ok after verification of hanger toe nail size
|
BLD-Framing/Rough-in | 7/27/2016 | 7/29/2016 | 8/5/2016 | P | PASS |
Dave Hannah
|
|
|
Kent-roof nailing, frame on 5th floor Phone #: ###-####
|
BLD-Framing/Rough-in | 8/3/2016 | 8/3/2016 | 8/3/2016 | P | PART |
Tony Young
|
|
|
Kent Phone #: ###-####,, parapet wall on s/w roof ok
|
BLD-Conference | 8/2/2016 | 8/3/2016 | 8/3/2016 | P | PASS |
Tony Young
|
|
|
Level 4 Corridor Framing for Pre-Rock. Phone #: ###-#### Inspection requested via web by Joshua Folger,, 4th ok
|
BLD-Framing/Rough-in | 8/2/2016 | 8/3/2016 | 8/3/2016 | A | DEFR |
Tony Young
|
|
|
Kent Phone #: ###-####,, to pm
|
BLD-Wall cover | 8/2/2016 | 8/2/2016 | 8/2/2016 | P | PART |
Tony Young
|
|
|
Insulation Inspection for Pre-Rock at L1 Corridors. Phone #: ###-#### Inspection requested via web by Joshua Folger
|
BLD-Framing/Rough-in | 8/1/2016 | 8/2/2016 | 8/2/2016 | P | PART |
Tony Young
|
|
|
This inspection will be for acceptance of framing in the electrical room in order to insulate and drywall perimeter walls and ceiling; to allow expediting permanent power installation of switch gear and distribution panels. Phone #: ###-#### Inspection requested via web by Joshua Folger,, this room ok
|
BLD-Wall cover | 8/2/2016 | 8/2/2016 | 8/2/2016 | A | PART |
Tony Young
|
|
|
Insulation Inspection for Pre-Rock at L1 Corridors. Phone #: ###-#### Inspection requested via web by Joshua Folger,, electrical room ok
|
BLD-Framing/Rough-in | 7/29/2016 | 8/1/2016 | 8/1/2016 | P | PART |
Tony Young
|
|
|
Josh-level 5 corradore for pre rock Phone #: ###-####,, 5th floor corridor ceiling ok
|
BLD-Framing/Rough-in | 7/27/2016 | 7/27/2016 | 7/27/2016 | P | PART |
Tony Young
|
|
|
Kent-framing on pre rock and insulation on 1st floor Phone #: ###-####,, ok to insulate ceilings on 1st floor
|
BLD-Wall cover | 7/22/2016 | 7/25/2016 | 7/25/2016 | A | PART |
Tony Young
|
|
|
Shear inside first floor // Kent Phone #: ###-#### main floor corridor shear ok
|
BLD-Framing/Rough-in | 7/22/2016 | 7/25/2016 | 7/25/2016 | A | PART |
Tony Young
|
|
|
Kent Phone #: ###-####,, main floor corridor ceilings ok to prerock
|
BLD-Wall Bracing | 7/13/2016 | 7/14/2016 | 7/14/2016 | A | PART |
Tony Young
|
|
|
Shear // Kent Phone #: ###-####,, west side straps ok,, nailing ok on upper areas
|
BLD-Other | 7/13/2016 | 7/13/2016 | 7/14/2016 | P | PASS |
Dave Hannah
|
|
|
hold-down strap: kent Phone #: ###-####
|
BLD-Wall Bracing | 7/6/2016 | 7/7/2016 | 7/7/2016 | A | PASS |
Dave Hannah
|
|
|
south side; Kent Phone #: ###-#### ok to cover south wall
|
BLD-Wall Bracing | 6/28/2016 | 6/29/2016 | 6/29/2016 | A | PART |
Dave Hannah
|
|
|
Kent Phone #: ###-#### east wall shear and straping ok to rock north wall straping ok to fourth floor
|
BLD-Wall Bracing | 6/22/2016 | 6/23/2016 | 6/23/2016 | A | PASS |
Jim Storey
|
|
|
Kent Phone #: ###-#### exterior ok to cover w/gyp up to 4th
|
BLD-Wall cover | 6/3/2016 | 6/3/2016 | 6/3/2016 | P | CANC |
Tony Young
|
|
|
Kent Phone #: ###-####
|
BLD-Wall Bracing | 6/1/2016 | 6/2/2016 | 6/2/2016 | P | PASS |
Mike Jordan
|
|
|
Straps for north wall - Kent Phone #: ###-####.
Shearwall inspection at south wall on gridline 1.1 from gridlines D.1 to J finish floor to 12ft.elvation ok to cover. Gridline J from grids 1.4 to 3.9 finish floor to 12ft. elev. ok to cover. North wall gridline F to H.7 1st to 3rd floors ok to cover. All walls inspected were exterior walls.
|
BLD-Conference | 5/23/2016 | 5/23/2016 | 5/24/2016 | P | PASS |
Dave Hannah
|
|
|
Kent Phone #: ###-####
|
BLD-Wall Bracing | 5/16/2016 | 5/16/2016 | 5/16/2016 | P | PART |
Mike Jordan
|
|
|
kent Phone #: ###-####. North exterior walls 1st, and 2nd floors. Needs to install remaining CS22 straping. Nailing ok.
|
CHANGE STATUS TO (ISS) | | | 5/16/2016 | | DONE |
Christina Prado
|
|
|
plan mod fees paid in full
|
Plan assigned to (CDM) | 4/27/2016 | 4/27/2016 | 5/11/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 5/3/2016 | | 5/11/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing PW Sewer Design | 5/4/2016 | | 5/11/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/11/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/11/2016 | | DONE |
|
|
|
DO NOT RE-ISSUE THIS IS A PLAN MOD
|
Routing PW Drainage | 5/4/2016 | | 5/6/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLUMBING | 5/3/2016 | | 5/5/2016 | | PASS |
Daryl Spivey
|
|
|
|
Routing - PUBLIC WORKS | 5/4/2016 | | 5/5/2016 | | PASS |
Jennifer Bruner
|
|
|
No review Environmental review needed per Rick Christensen.
|
Routing - MECHANICAL | 5/3/2016 | | 5/4/2016 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 5/3/2016 | 5/3/2016 | 5/3/2016 | | PASS |
Katie Marron
|
|
|
Plan modifications reviewed. No changes to review required.
|
Routing - Design Review | 5/3/2016 | | 5/3/2016 | | PASS |
Josh Wilson
|
|
|
|
BLD-Conference | 4/28/2016 | 4/28/2016 | 4/28/2016 | P | PASS |
Tony Young
|
|
|
Kent Phone #: ###-####
|
Plan Modification Accepted | | | 4/27/2016 | | DONE |
Christina Prado
|
|
|
For updates to existing plans
|
BLD-Conference | 3/18/2016 | 3/21/2016 | 3/21/2016 | P | PASS |
Tony Young
|
|
|
Kent Phone #: ###-####,, frame ?s,, asked 425 to help me out,,
|
Issue PAID IN FULL permit | | | 3/17/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/17/2016 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 11/12/2015 | 11/12/2015 | 2/9/2016 | | PASS |
Carl D Madsen
|
|
|
Hyatt Place First review completed
|
Routing - PLAN CHECK | 2/2/2016 | | 2/9/2016 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/9/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/9/2016 | | DONE |
Christina Prado
|
|
|
***ALL REQUIRMENTS MET 3-17-16 /CEV
Need ACHD for issuance
|
Routing - FIRE | 2/2/2016 | 2/2/2016 | 2/3/2016 | | PASS |
Scott Arellano
|
|
|
Revised report attached to case.
|
Routing PW Sewer Design | 1/14/2016 | | 1/14/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Route to Impact Fee Review | 1/8/2016 | 1/13/2016 | 1/8/2016 | | PASS |
Cindy M. Gould
|
|
|
|
CHANGE STATUS TO (REV) | | | 1/8/2016 | | DONE |
Christina Prado
|
|
|
Status changed to REC by mistake on 12/18. Permit still in review
|
Routing Off Site - STRUCTURAL | 12/21/2015 | | 12/22/2015 | | PASS |
Carl D Madsen
|
|
|
Signed of in E-Plan
|
1st review completed | | | 12/21/2015 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 11/12/2015 | | 12/21/2015 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 11/12/2015 | | 12/21/2015 | | FAIL |
Carl D Madsen
|
|
|
|
Application received | | 12/18/2015 | 12/18/2015 | | DONE |
|
|
|
|
Routing - MECHANICAL | 12/18/2015 | | 12/18/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 12/18/2015 | | 12/18/2015 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing PW Drainage | 12/18/2015 | | 12/18/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 12/18/2015 | | 12/18/2015 | | PASS |
Emily Dixon
|
|
|
Address is 1024 W Bannock St
|
Routing - Erosion and Sediment | 12/18/2015 | | 12/18/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
**Project Management-Ron Hill**(HYATT PLACE) This permit is for the complete construction of a 5 story, 150 guestroom, wood structure Hyatt Place hotel.
|
Routing PW Street Lights | 12/18/2015 | | 12/18/2015 | | PASS |
Mike D Hedge
|
|
|
|
Routing PW Environmental | 11/13/2015 | | 12/14/2015 | | PASS |
Rick Christenson
|
|
|
1500 Gallon Grease Interceptor shown. Verify interceptor connections.
|
Routing - PLANNING Land Div | 12/14/2015 | | 12/14/2015 | | PASS |
Dave Abo
|
|
|
Parcels have been combined.
|
Routing - MECHANICAL | 11/12/2015 | | 12/1/2015 | | FAIL |
Troy James
|
|
|
eplan
|
Routing - Design Review | 11/12/2015 | | 11/25/2015 | | PASS |
Josh Wilson
|
|
|
ok per DRH15-00250
|
Routing PW Drainage | 11/13/2015 | | 11/24/2015 | | FAIL |
Brian Murphy
|
|
|
needs c-33 sand
|
Routing - PLUMBING | 11/12/2015 | | 11/23/2015 | | FAIL |
Daryl Spivey
|
|
|
1) address suds relief
2) riser sizing doesnt match detail P2.11
3) branch sizing doesn't match detail P2.11
|
Routing PW Solid Waste | 11/13/2015 | | 11/23/2015 | | PASS |
Megan Durrell
|
|
|
Trash enclosure moved locations since the DRH and does not match the design discussed during pre-planning. Required backing distance is questionable with parking adjacent. Architect contacted.
|
Routing PW Geothermal | 11/13/2015 | | 11/23/2015 | | PASS |
Jon R. Gunnerson
|
|
|
Not connecting onto geothermal
|
Routing - FIRE | 11/12/2015 | 11/12/2015 | 11/18/2015 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing PW Sewer Design | 11/13/2015 | | 11/18/2015 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
For each connection to public sewer, contractor is required to contact Boise Public Works 48 hours prior to connection to obtain tap permit and schedule inspection.
|
Routing PW Sewer Rating | 11/13/2015 | | 11/16/2015 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PUBLIC WORKS | 11/12/2015 | | 11/16/2015 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 11/12/2015 | | 11/13/2015 | | FAIL |
Evan Jenkins
|
|
|
What is the area of disturbance/size of project? Also, fill in information about the Boise River.
Missing information in the SWPPP. Meets Boise's BCC 8-17 but not Federal EPA SWPPP Requirements. Evan Jenkins 794.3958
|
Routing PW Street Lights | 11/13/2015 | | 11/13/2015 | | FAIL |
Mike D Hedge
|
|
|
|
Routing - PLANNING Land Div | 11/12/2015 | | 11/13/2015 | | FAIL |
Dave Abo
|
|
|
Must combine parcels into one prior to issuance of building permit.
|
Routing - Addressing | 11/12/2015 | | 11/13/2015 | | FAIL |
Emily Dixon
|
|
|
Parcels need to be combined. New buildings cannot cross parcel lines.
|
Intake Approval | | | 11/12/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 11/12/2015 | | 11/12/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | | 11/4/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 4 2015 2:34PM
|
Application received | | 12/18/2015 | | | PASS |
|
|
|
|