Third Notice | | 4/23/2016 | 5/11/2016 | | DONE |
|
|
|
|
Third Notice | | 3/16/2016 | 4/18/2016 | | DONE |
|
|
|
|
Second Notice | | 2/21/2016 | 3/11/2016 | | DONE |
Candy A. Nichols
|
|
|
mailed 3-14-16
|
First Notice | 1/15/2016 | 1/15/2016 | 2/11/2016 | | DONE |
Jim Storey
|
|
|
Mailed 2-12-16
|
DOC - Permit Finaled | 1/15/2016 | 1/15/2016 | 1/15/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 1/15/2016 | 1/15/2016 | 1/15/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 1/7/2016 | 1/8/2016 | 1/11/2016 | P | NR |
Jim Storey
|
|
|
Amel Phone #: ###-####
|
BLD-Final | 1/6/2016 | 1/7/2016 | 1/7/2016 | P | DEFR |
Jim Storey
|
|
|
Amel Phone #: ###-####
|
FIRE-Final Inspection | 1/6/2016 | 1/7/2016 | 1/7/2016 | A | PASS |
Jim Page
|
|
|
Life fire safety inspection for vanilla TI passed/complete, northwest main entrance has thumb turn deadbolt on door. Spoke with point of contact, Amel phone number ###-####, he is contacting the building owner, thumbturn deadbolt will be removed and a double-key deadbolt will be installed.
|
BLD-Final | 12/28/2015 | 12/29/2015 | 12/30/2015 | P | NR |
Jim Storey
|
|
|
amel Phone #: ###-####
|
FIRE-Final Inspection | 12/28/2015 | 12/29/2015 | 12/29/2015 | A | FAIL |
Jim Page
|
|
|
The area labeled on the city approved drawings as Suite 100 (at time of inspection the suites were not numbered) is occupied by a tenant, tenant/building owner needs to apply for a certificate of occupancy and inspections for that permit performed. As far as the inspection for this permit, round type door handles need to be removed and single action door hardware installed, exit signs need to be serviced/repaired.
|
Plan Reviewer's activity | | | 12/29/2015 | | DONE |
Javier Guzman
|
|
|
Spoke with applicant Gerald Armstrong and told him that the fire inspector found that one of the vanilla spaces (suite 100, 101 or 102) is being occupied and tenant will need to immediately need come in and apply for an occupancy evaluation permit to occupy the vanilla space
|
BLD-Framing/Rough-in | 12/8/2015 | 12/9/2015 | 12/9/2015 | A | PASS |
Jim Storey
|
|
|
Amel Phone #: ###-#### per the reviewed plan
|
Issue PAID IN FULL permit | | | 11/18/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/10/2015 | | DONE |
|
|
|
need GC and rev cert of val
|
Inspection Record Card- Bld | | | 11/10/2015 | | DONE |
|
|
|
|
Telephone call | | | 11/10/2015 | | DONE |
|
|
|
Left a message for Gerald informing him that the permit is ready and that a 302 and 306 are needed from the GC.
|
Plan assigned to (JG) | 11/5/2015 | 11/5/2015 | 11/9/2015 | | PASS |
Javier Guzman
|
|
|
11/11 L1 TYRELL OFFICE BUILDING Tenant A
|
Routing - PLAN CHECK | 11/5/2015 | | 11/9/2015 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 11/9/2015 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 11/9/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2015 | | DONE |
|
|
|
|
Routing - Addressing | 11/5/2015 | | 11/6/2015 | | PASS |
Jason C. Taylor
|
|
|
Added new suites.
|
Routing - PUBLIC WORKS | 11/6/2015 | | 11/6/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/5/2015 | | DONE |
|
|
|
|
Intake Approval | | | 11/5/2015 | | PASS |
Javier Guzman
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/5/2015 | | DONE |
|
|
|
|
Application received | | 11/4/2015 | | | |
|
|
|
|