Permit Information
Permit NumberBLD15-04093
StatusFinaled
Name STEED CONSTRUCTION
Site Address 601 W GOWEN RD
Project NameWestern Power Sports
Customer Number 
ePlanReviewYes
Description
(WESTERN POWER SPORTS) Permit is to remodel an existing 37,141 sq. ft. second floor within the 177,155 sq. ft. existing building. Approval is contingent upon adhering to the approved plans on file. Work to include: construction of select interior nonbearing walls to create (3) offices within the open office floor area, relocating existing light fixtures and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. NOTE: This building is fully fire sprinklered and has 60' on all sides for unlimited area **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  2/10/2016 DONE
Left a message for Kevin asking about his final value for Electrical and Fire Alarm. Informed him that if he had a company pull a permit for the alarm he would need to separate the values other wise I would have to send his electrical company the difference from his 12,385 to thier 10,455
Print Statement  2/10/2016 DONE
First Notice12/22/201512/22/20151/12/2016 DONE
DetailsJim Storey
Mailed 1-13-16
BLD-Final12/21/201512/22/201512/22/2015APASS
DetailsJim Storey
Kent Phone #: ###-####
DOC - Permit Finaled12/22/201512/22/201512/22/2015PPASS
DetailsJim Storey
BLD-Final12/18/201512/21/201512/21/2015PDEFR
DetailsJim Storey
Kent Phone #: ###-#### no plm permit
FIRE-Final Inspection12/18/201512/21/201512/21/2015APASS
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete. Life fire safety inspection passed/complete.
BLD-Framing/Rough-in11/24/201511/25/201511/25/2015APASS
DetailsDave Hannah
Kent Phone #: ###-####
Issue PAID IN FULL permit  11/24/2015 DONE
Inspection Record Card- Bld  11/24/2015 DONE
Plan assigned to (JG)11/9/201511/9/201511/16/2015 PASS
DetailsJavier Guzman
1st review completed, 11/12 L1 WPS TI ePlan pending addressing
Routing - Addressing11/16/2015 11/16/2015 PASS
DetailsLaura Hunter
PLANS/APPL TAKEN TO FRONT DESK  11/16/2015 DONE
Permit Ready to Issue  11/16/2015 DONE
requirements met-GC is applicant
Routing - PUBLIC WORKS11/9/2015 11/12/2015 PASS
DetailsRachael Beierle
1st review completed  11/12/2015 FAIL
DetailsJavier Guzman
Addressing
Routing - PLAN CHECK11/9/2015 11/12/2015 PASS
DetailsJavier Guzman
Routing - Addressing11/9/2015 11/9/2015 FAIL
DetailsEmily Dixon
Please provide a better vicinity map.
Intake Approval  11/9/2015 PASS
Pending Assignment by TLW11/9/2015 11/9/2015 DONE
DetailsTim L. Woodard
Application received  11/5/2015 DONE
Application submitted via PDS Online on Nov 5 2015 4:42PM