BLD-Final | 12/15/2015 | 12/17/2015 | 12/17/2015 | A | PASS |
Dave Hannah
|
|
|
Andy Phone #: ###-####
|
FIRE-Final Inspection | 12/15/2015 | 12/15/2015 | 12/15/2015 | P | PASS |
Jim Page
|
|
|
Previously noted items addressed, exit signs installed at the east and west exterior exit doors, panic door hardware installed on east side exit, thumb turn deadblot on west door changed to a double key type, door to remain unlocked sticker installed on doors exiting the designated tenant space. The remaining doors in the tenant space are round knob type, not paddle type, I did inform the tenant that this could be an issue for the final building inspection. Life fire safety inspection passed/complete.
|
BLD-Final | 11/30/2015 | 12/2/2015 | 12/2/2015 | P | NR |
Phil Shearer
|
|
|
Andy Phone #: ###-####
|
BLD-Conference | 12/2/2015 | 12/2/2015 | 12/2/2015 | P | DONE |
Phil Shearer
|
|
|
Andy Phone #: ###-####
|
FIRE-Final Inspection | 11/30/2015 | 12/2/2015 | 12/2/2015 | A | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware on the rear exit door, remove the thumbturn dead bolt from the main exit door and provide sticker. Plans say "yes" for exit signage and that two exits are required. Provide exit signs as discussed or contact plan review for alternatives.
|
Issue PAID IN FULL permit | | | 11/30/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/25/2015 | | DONE |
|
|
|
All Met
|
Print Occupancy Form | | | 11/25/2015 | | DONE |
|
|
|
|
Telephone call | | | 11/25/2015 | | DONE |
|
|
|
Left a message for Andy informing him that the permit is ready to be picked up and which ever permit teach he speaks with will go over the inspections that are needed to get occupancy
|
Routing - PLAN CHECK | 11/24/2015 | | 11/24/2015 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/24/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/24/2015 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 11/6/2015 | | 11/24/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 11/6/2015 | | 11/10/2015 | | PEND |
Tim L. Woodard
|
|
|
Additional information required. TLW
|
1st review completed | | | 11/10/2015 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/6/2015 | | DONE |
|
|
|
|
Intake Approval | | | 11/6/2015 | | |
Tim L. Woodard
|
|
|
|
Application received | | 11/6/2015 | | | |
|
|
|
|