Permit Information
Permit NumberBLD15-04098
StatusFinaled
Name CRI COMMERCIAL/RESIDENTIAL INVESTME
Site Address 250 S 5TH ST Unit: 840
Project NameIntracon Suite 840
Customer Number 
ePlanReviewYes
Description
(INTRACON) Permit is to remodel an existing 1,460 sq. ft. tenant space on the 8th floor. Approval is contingent upon adhering to the approved plans on file. Work to include: Removal of select interior nonbearing walls, construction of select interior nonbearing walls to create (2) conference rooms, a break room with a new sink, a server room, ADA compliant reception area, open office area, hallways and select wall infill, construction of half walls to create (6) work stations, relocating existing light fixtures, electrical work, mechanical ductwork, plumbing work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/16/20168/9/2016 DONE
This permit finaled on the web by Shane de Belloy
Third Notice 6/15/20167/11/2016 DONE
sent with a letter
Third Notice 5/16/20166/10/2016 DONE
Third Notice 4/19/20165/11/2016 DONE
Second Notice 3/20/20164/14/2016 DONE
First Notice 2/22/20163/10/2016 DONE
Mailed 3-11-16
Print Occupancy Form  2/12/2016 DONE
Permanent Occupancy  2/12/2016 DONE
BLD-Final2/11/20162/11/20162/11/2016PPASS
DetailsMike Jordan
Shane Phone #: ###-####. Ok for perm occ.
BLD-Final1/21/20161/22/20161/25/2016APEND
DetailsDave Hannah
Shane Phone #: ###-#### ok for temp occ but needs to drop sink to 34 inches
FIRE-Final Inspection1/14/20161/15/20161/15/2016APASS
DetailsJim Page
Fire sprinkler inspection complete, no fire alarm modifications, fire extinuisher to be mounted in breakroom, life fire safety passed/complete.
Issue PAID IN FULL permit  11/16/2015 DONE
Print Occupancy Form  11/16/2015 DONE
Plan assigned to (JG)11/9/201511/9/201511/12/2015 PASS
DetailsJavier Guzman
11/12 L1 Intracon TI ePlan
Routing - PLAN CHECK11/9/2015 11/12/2015 PASS
DetailsJavier Guzman
1st review completed  11/12/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/12/2015 DONE
Permit Ready to Issue  11/12/2015 DONE
***ALL REQUIRMENTS MET 11-16-15 /CEV need GC and Rev Cert of Val
Intake Approval  11/9/2015 PASS
Pending Assignment by TLW11/9/2015 11/9/2015 DONE
DetailsTim L. Woodard
Routing - PUBLIC WORKS11/9/2015 11/9/2015 PASS
DetailsRachael Beierle
Routing - Addressing11/9/2015 11/9/2015 PASS
DetailsEmily Dixon
Suite 840 added.
Application received  11/6/2015 DONE
Application submitted via PDS Online on Nov 6 2015 11:19AM