CHANGE STATUS TO (ISS) | | | 1/11/2018 | | DONE |
|
|
|
Per tony this can be reopen
|
Inspection Record Card- Bld | | | 1/11/2018 | | DONE |
|
|
|
|
BLD-Aging Inspection | 7/26/2017 | 7/26/2017 | 8/2/2017 | | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 7/28/2017 | 7/28/2017 | 7/28/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 7/25/2017 | 7/25/2017 | 7/27/2017 | | PEND |
Tony Young
|
|
|
|
BLD - Request for Extension | 3/10/2017 | 3/13/2017 | 3/13/2017 | A | PASS |
Tony Young
|
|
|
Wayne Phone #: ###-####
|
Routing Walk-In (BLD) | 3/10/2017 | 3/10/2017 | 3/10/2017 | P | FAIL |
Tisha Gallop
|
|
|
need dimensioned floor plan to add urinal room and sink and condition lower floor.
|
Override - Parcel Holds | | | 8/12/2016 | | |
|
|
|
|
Office Staff conference/action | | | 8/12/2016 | | |
|
|
|
spoke with Wayne on 8-12-16. He pulled trade permits intending to build an ADU. He did not get the approval for the ADU, so has now modified his trade permits to include only the work approved. He will be emailing Rita for a refund on MEC16-03371 and PLM16-02701.
|
BLD-Conference | 7/29/2016 | 8/1/2016 | 8/1/2016 | A | PASS |
Tony Young
|
|
|
owner has the paper work and knows the requirments..
|
BLD-Conference | 7/29/2016 | 7/29/2016 | 7/29/2016 | P | CANC |
Mike Jordan
|
|
|
verify that the upstairs is only what is permitted,, not an ADU,, call Candy if you have any questions
|
BLD-Conference | 7/28/2016 | 7/29/2016 | 7/29/2016 | A | DEFR |
Mike Jordan
|
|
|
verify that the upstairs is only what is permitted,, not an ADU,, call Candy if you have any questions
|
Meeting | | | 7/28/2016 | | DONE |
|
|
|
emailed Tony Young-asked him to place a stop work order until hmeowner comes in with a plan mod for the ADU that's going to go in above the detached garage
|
Telephone call | | | 7/27/2016 | | DONE |
|
|
|
called Wayne to let him know if he adds a restroom and bedroom and kitchenett he will have to do a plan mod for an ADU
|
BLD-Wall Bracing | 2/11/2016 | 2/12/2016 | 2/12/2016 | A | PASS |
Tony Young
|
|
|
Tim Phone #: ###-####
|
BLD-Framing/Rough-in | 2/11/2016 | 2/11/2016 | 2/11/2016 | P | PART |
Tony Young
|
|
|
Tim Phone #: ###-####,, need trades 1st,, ok to side,, put in windows and roof ,, exterior only
|
BLD-Footing | 11/10/2015 | 11/13/2015 | 11/13/2015 | P | PART |
Jim Sly
|
|
|
Darrel Phone #: ###-#### Footing and wall ok
|
BLD-Footing | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | PASS |
Tony Young
|
|
|
Darrel Phone #: ###-####
|
BLD-Footing | 11/10/2015 | 11/12/2015 | 11/12/2015 | A | DEFR |
Tony Young
|
|
|
Darrel Phone #: ###-####
|
OVERRIDE | | | 11/9/2015 | | |
|
|
|
|
Routing Walk-In (BLD) | 11/9/2015 | 11/9/2015 | 11/9/2015 | A | PASS |
Javier Guzman
|
|
|
|
Routing Walk-In (BLD) | 11/6/2015 | 11/6/2015 | 11/9/2015 | A | DONE |
David Ferguson
|
|
|
|
1st review completed | | | 11/9/2015 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 11/9/2015 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 11/9/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/9/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/9/2015 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 11/6/2015 | 11/6/2015 | 11/6/2015 | P | PASS |
Colleen T Carroll
|
|
|
|
Application received | | 11/6/2015 | | | |
|
|
|
|
Routing PW Sewer Rating | 8/2/2016 | | | | |
Beverly Mountain
|
|
|
ROUTE THIS BACK TO SEWER RATING IF THIS IS AN ADU, WE WILL HAVE ADDITIONAL FEES. BAM
|