Print Statement | | | 4/20/2017 | | DONE |
|
|
|
sent 1st late final value notice
|
Print Statement | | | 11/21/2016 | | DONE |
|
|
|
|
Second Notice | | 9/29/2016 | 10/17/2016 | | DONE |
|
|
|
Mailed 10-18-16
|
First Notice | | 8/14/2016 | 9/19/2016 | | DONE |
|
|
|
|
BLD-Final | 8/4/2016 | 8/4/2016 | 8/4/2016 | P | DONE |
Tony Young
|
|
|
as per phone call with Tony Young all requirments were met
|
Permanent Occupancy | | | 8/4/2016 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 7/26/2016 | 7/26/2016 | 7/26/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Temporary Occupancy | 7/22/2016 | 10/20/2016 | 7/22/2016 | | DONE |
Candy A. Nichols
|
|
|
after talking to Natasha with CDHC-she said they didn't actually do an inspection for the temp c of o. Natasha said they signed it so the school could get moved in. No plans were ever turned into CDHC and no fees were ever paid for so the health dept has technically not done an inspection. I called the school and talked to the administrator. I wanted to let her know that we couldn't sign off on the perm c of o until the health dept signs the sign off card
|
Telephone call | | | 7/22/2016 | | DONE |
|
|
|
after talking to Natasha with CDHC-she said they didn't actually do an inspection for the temp c of o. Natasha said they signed it so the school could get moved in. No plans were ever turned into CDHC and no fees were ever paid for so the health dept has technically not done an inspection. I called the school and talked to the administrator. I wanted to let her know that we couldn't sign off on the perm c of o until the health dept signs the sign off card
|
BLD-Final | 7/19/2016 | 7/21/2016 | 7/21/2016 | P | PART |
Jim Storey
|
|
|
Mark Phone #: ###-#### Informed Mark, as of 10:44am 7/19, that C & S Excavation hasn't paid for their permit or had inspections need health dept insp/
|
FIRE-Final Inspection | 7/20/2016 | 7/21/2016 | 7/21/2016 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 7/19/2016 | 7/20/2016 | 7/20/2016 | A | CANC |
Jim Page
|
|
|
Inspection request will need to be rescheduled to coincide with FIR permit final.
|
Zoning Approval | 7/12/2016 | 7/12/2016 | 7/12/2016 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Conference | 7/11/2016 | 7/11/2016 | 7/11/2016 | P | PEND |
Tony Young
|
|
|
Mark Phone #: ###-####,, walk through only,, need trades,, historical,, guard rails per code,, handrails per code,, etc.
|
BLD-Energy code compliance | 6/1/2016 | 6/2/2016 | 6/2/2016 | A | PASS |
Mike Jordan
|
|
|
Mark Phone #: ###-####. Exterior walls ok. Needs to complete airseal pak and fire block interior walls.
|
BLD-Energy code compliance | 5/27/2016 | 5/31/2016 | 5/31/2016 | P | NR |
Dave Hannah
|
|
|
Mark Phone #: ###-####
|
BLD-Framing/Rough-in | 5/27/2016 | 5/27/2016 | 5/27/2016 | P | PART |
Tony Young
|
|
|
Mark Phone #: ###-####,, walls ok to insulate main level
|
BLD-Conference | 5/20/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Tony Young
|
|
|
Mark Phone #: ###-####,, walk through on frame
|
BLD-Framing/Rough-in | 5/19/2016 | 5/20/2016 | 5/20/2016 | A | NR |
Tony Young
|
|
|
Mark Phone #: ###-####
|
BLD-Framing/Rough-in | 5/18/2016 | 5/18/2016 | 5/18/2016 | P | PART |
Tony Young
|
|
|
partial frame on roof-Mark Phone #: ###-####,, ROOF NAILING OK
|
BLD-Foundation | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | PART |
Tony Young
|
|
|
rebar; Mark Phone #: ###-####,, ok pending special inspection
|
BLD-Footing | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | CANC |
Tony Young
|
|
|
Late if possible // Mark Phone #: ###-####
|
BLD-Foundation | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | CANC |
Tony Young
|
|
|
Late if possible......Rebar // Mark Phone #: ###-####
|
OVERRIDE | | | 3/11/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/11/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/11/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/11/2016 | | DONE |
Christina Prado
|
|
|
***all requirments met 3-11-16 /CEV
Need ACHD approval documentation for issuance
|
Routing PW Drainage | 3/1/2016 | | 3/11/2016 | | PASS |
Jason C. Taylor
|
|
|
|
Plan assigned to (TLW) | 11/19/2015 | | 3/11/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 3/1/2016 | | 3/1/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 1/11/2016 | | 1/26/2016 | | FAIL |
Brian Murphy
|
|
|
see changemarks in eplan. JCT
|
Routing Off Site - STRUCTURAL | 1/11/2016 | | 1/26/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved. TLW
|
Routing - FIRE | 1/11/2016 | 1/11/2016 | 1/11/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing - PLAN CHECK | 1/11/2016 | | 1/11/2016 | | FAIL |
Tim L. Woodard
|
|
|
Corrections marked as Changemarks in E-Plan. TLW
|
Plan resubmittals received | | | 1/8/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Route to Impact Fee Review | 12/21/2015 | 12/24/2015 | 12/23/2015 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 12/21/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/19/2015 | | 12/21/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - PLANNING | 11/19/2015 | | 12/21/2015 | | PASS |
Susan Riggs
|
|
|
CUP09-00042. Approved in E-Plan.. TLW
|
Routing Off Site - STRUCTURAL | 11/19/2015 | | 12/8/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 11/23/2015 | | 12/2/2015 | | FAIL |
Brian Murphy
|
|
|
NEEDS M WELL AND GEOTECH
|
Routing - PLUMBING | 11/19/2015 | | 11/27/2015 | | PASS |
Daryl Spivey
|
|
|
|
Routing PW Solid Waste | 11/23/2015 | | 11/24/2015 | | PASS |
Megan Durrell
|
|
|
|
Routing - Design Review | 11/19/2015 | | 11/23/2015 | | PASS |
Sarah Schafer
|
|
|
DRH09-00133 - Approved per DRH09-00133
|
Routing - MECHANICAL | 11/23/2015 | | 11/23/2015 | | PASS |
Troy James
|
|
|
|
Routing PW Sewer Rating | 11/23/2015 | | 11/23/2015 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PUBLIC WORKS | 11/19/2015 | | 11/23/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - FIRE | 11/19/2015 | 11/19/2015 | 11/20/2015 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing - Erosion and Sediment | 11/19/2015 | | 11/20/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(CHILDREN'S SCHOOL of BOISE - Addition) Add additional square footage that includes (2) new classrooms, basement storage & an office. There will also be a walkway that connects the new and old spaces.
|
Routing - PLANNING Land Div | 11/19/2015 | | 11/20/2015 | | PASS |
Dave Abo
|
|
|
|
Routing - Addressing | 11/19/2015 | | 11/20/2015 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 11/19/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 11/19/2015 | | 11/19/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | | 11/11/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 11 2015 10:31AM
|