Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-04138
StatusFinaled
Name ESI
Site Address 2755 S BEVERLY ST Unit: 104
Project NameSherwin-Williams Suite #104
Customer Number 
ePlanReviewYes
Description
(SHERWIN-WILLIAMS – Building #1 - South end - Ste# 104) Permit is to build out a 4,768 sq. ft. new tenant space in an existing 19,600 square foot shell building (shell constructed under BLD14-01651). Approval is contingent upon adhering to the approved plans on file. Note: envelope was approved with the shell permit. Work to include: construction of new interior partition walls, new accessible restroom, new plumbing, new electrical, new mechanical, and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 4/9/20164/12/2016 DONE
mailed 4-13-16
Permanent Occupancy  3/30/2016 DONE
BLD-Final3/28/20163/29/20163/29/2016PPASS
DetailsPhil Shearer
Miles Phone #: ###-####
FIRE-Final Inspection3/28/20163/29/20163/29/2016APASS
DetailsTroy Cobbley
life safety passed. Wall has been completed.
FIRE-Final Inspection3/28/20163/29/20163/29/2016PCANC
DetailsTroy Cobbley
Miles Phone #: ###-####
Temporary Occupancy3/9/20166/7/20163/9/2016 DONE
DetailsBrittany Hill
BLD-Final3/9/20163/9/20163/9/2016APART
DetailsPhil Shearer
Spoke with Phil and he gave the ok for a partial final
BLD-Conference2/29/20162/29/20162/29/2016PPART
DetailsPhil Shearer
Troy is doing the fire final this morning. Phone #: ###-#### Inspection requested via web by Miles Hash. OK for Temp
FIRE-Final Inspection2/26/20162/29/20162/29/2016PPART
DetailsTroy Cobbley
A temporay occupancy is being given with Scott's permission. As per the fire code review comments, a 1 hour wall needs to be provided. It does not appear that "house keeping" should be an issue due to construction type and size of the booth. Per ESI superintendant the wall will be installed with-in the two week time period for a temporary occupancy. A follow up inspection for myself has been scheduled.
FIRE-Conference2/25/20162/25/20162/26/2016PDONE
DetailsTroy Cobbley
Went over life safety requirements. Need thumbturn off of front door and add emergency lighting in the front office.
BLD-Ceiling Grid Inspection2/3/20162/4/20162/4/2016APASS
DetailsPhil Shearer
please call before arriving, working 2 jobs thanks. Phone #: ###-#### Inspection requested via web by Miles Hash
BLD-Framing/Rough-in1/13/20161/14/20161/14/2016APASS
DetailsDave Hannah
completed framing, can complete framing inspections, thanks Phone #: ###-#### Inspection requested via web by Miles Hash
BLD-Framing/Rough-in1/12/20161/12/20161/12/2016PPASS
DetailsPhil Shearer
inspect demising wall so sheetrock and rough-in can happen. thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
Inspection Record Card- Bld  12/17/2015 DONE
Issue PAID IN FULL permit  12/17/2015 DONE
Print Occupancy Form  12/17/2015 DONE
Routing - FIRE12/15/201512/15/201512/15/2015 PASS
DetailsKatie Marron
signed off in ePlan by Katie Marron
Plan assigned to (JG)11/16/201511/16/201512/15/2015 PASS
DetailsTim L. Woodard
1st review completed, 12/11 Level 3 TI - ePlanReview - Sherwin Williams, pending others
PLANS/APPL TAKEN TO FRONT DESK  12/15/2015 DONE
Permit Ready to Issue  12/15/2015 DONE
**MET 12-17-15** Need GC and Revised Cert of Value
Routing PW Sewer Rating12/14/2015 12/14/2015 PASS
DetailsJennifer Bruner
Routing - Addressing12/14/2015 12/14/2015 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS12/14/2015 12/14/2015 PASS
DetailsJennifer Bruner
Routing PW Environmental11/16/2015 12/10/2015 PASS
DetailsRick Christenson
1st review completed  12/10/2015 FAIL
DetailsJavier Guzman
pending others
Routing - PLAN CHECK11/16/2015 12/10/2015 PASS
DetailsJavier Guzman
Routing - MECHANICAL11/16/2015 11/25/2015 PASS
DetailsTroy James
Routing - FIRE11/16/201511/16/201511/17/2015 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
Routing PW Sewer Rating11/16/2015 11/16/2015 FAIL
DetailsJennifer Bruner
Correct addressing is needed.
Intake Approval  11/16/2015 PASS
Pending Assignment by TLW11/16/2015 11/16/2015 DONE
DetailsTim L. Woodard
Routing - Addressing11/16/2015 11/16/2015 FAIL
DetailsLaura Hunter
Need a better site map with all suites and which suite will be occupied by applicant.
Routing - PUBLIC WORKS11/16/2015 11/16/2015 PASS
DetailsJennifer Bruner
Application received  11/11/2015 DONE
Application submitted via PDS Online on Nov 11 2015 1:55PM