First Notice | 5/6/2016 | 5/6/2016 | 5/12/2016 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 5/4/2016 | 5/6/2016 | 5/6/2016 | A | PASS |
Mike Jordan
|
|
|
Jay Phone #: ###-####
|
DOC - Permit Finaled | 5/6/2016 | 5/6/2016 | 5/6/2016 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 5/4/2016 | 5/5/2016 | 5/5/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The duct smoke detector was tested.
|
BLD-Final | 5/2/2016 | 5/4/2016 | 5/4/2016 | A | NR |
Mike Jordan
|
|
|
Scott Phone #: ###-####. Fire/life/safety failed.
|
FIRE-Final Inspection | 4/27/2016 | 4/28/2016 | 4/28/2016 | P | FAIL |
Troy Cobbley
|
|
|
One of the eight new HVAC units that required a duct smoke detector now needs a FIR permit for the tie into the existing fire alarm system as per the IMC. Once connected to the fire alarm system the function/installation of the detector will need to be verified.
|
BLD-Final | 4/25/2016 | 4/26/2016 | 4/26/2016 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-####. Needs fire/life/safety.
|
BLD-Final | 4/8/2016 | 4/11/2016 | 4/11/2016 | P | CANC |
Mike Jordan
|
|
|
CANC per Jay Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/3/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/3/2015 | | DONE |
|
|
|
|
Plan assigned to (JG) | 11/12/2015 | 11/12/2015 | 11/25/2015 | | PASS |
Javier Guzman
|
|
|
11/25 L2 Emerald Business Park Building B
|
Routing - PLAN CHECK | 11/23/2015 | | 11/25/2015 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 11/25/2015 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 11/25/2015 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/25/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/25/2015 | | DONE |
|
|
|
**MET** Need GC Form and Revised Cert of Value
|
Inspection Record Card- Bld | | | 11/25/2015 | | DONE |
|
|
|
|
Telephone call | | | 11/25/2015 | | DONE |
Christina Prado
|
|
|
Called Cathy to advise review is complete and GC & Revised cert of value are needed for issuance
|
Routing - MECHANICAL | 11/12/2015 | | 11/23/2015 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/12/2015 | | DONE |
|
|
|
|
Intake Approval | | | 11/12/2015 | | PASS |
Javier Guzman
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/12/2015 | | DONE |
|
|
|
|
Application received | | 11/12/2015 | | | |
|
|
|
|