Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-04143
StatusFinaled
Name SCOTT HEDRICK CONSTRUCTION
Site Address 8100 W EMERALD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
**(EMERALD BUSSINESS PARK - BUILDING B)** Permit is to add (8) new roof top RTU’s and new interior mechanical duct work within the 18,500 sq. ft. building. Approval is contingent upon adhering to the approved plans on file and attached engineering. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice5/6/20165/6/20165/12/2016 DONE
DetailsCandy A. Nichols
BLD-Final5/4/20165/6/20165/6/2016APASS
DetailsMike Jordan
Jay Phone #: ###-####
DOC - Permit Finaled5/6/20165/6/20165/6/2016PPASS
DetailsMike Jordan
FIRE-Final Inspection5/4/20165/5/20165/5/2016APASS
DetailsTroy Cobbley
Life safety passed. The duct smoke detector was tested.
BLD-Final5/2/20165/4/20165/4/2016ANR
DetailsMike Jordan
Scott Phone #: ###-####. Fire/life/safety failed.
FIRE-Final Inspection4/27/20164/28/20164/28/2016PFAIL
DetailsTroy Cobbley
One of the eight new HVAC units that required a duct smoke detector now needs a FIR permit for the tie into the existing fire alarm system as per the IMC. Once connected to the fire alarm system the function/installation of the detector will need to be verified.
BLD-Final4/25/20164/26/20164/26/2016ANR
DetailsMike Jordan
Phone #: ###-####. Needs fire/life/safety.
BLD-Final4/8/20164/11/20164/11/2016PCANC
DetailsMike Jordan
CANC per Jay Phone #: ###-####
Issue PAID IN FULL permit  12/3/2015 DONE
Inspection Record Card- Bld  12/3/2015 DONE
Plan assigned to (JG)11/12/201511/12/201511/25/2015 PASS
DetailsJavier Guzman
11/25 L2 Emerald Business Park Building B
Routing - PLAN CHECK11/23/2015 11/25/2015 PASS
DetailsJavier Guzman
1st review completed  11/25/2015 DONE
DetailsJavier Guzman
Case Summary (BLD)  11/25/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/25/2015 DONE
Permit Ready to Issue  11/25/2015 DONE
**MET** Need GC Form and Revised Cert of Value
Inspection Record Card- Bld  11/25/2015 DONE
Telephone call  11/25/2015 DONE
DetailsChristina Prado
Called Cathy to advise review is complete and GC & Revised cert of value are needed for issuance
Routing - MECHANICAL11/12/2015 11/23/2015 PASS
DetailsTroy James
Plans ACCEPTED BY PLAN TECH  11/12/2015 DONE
Intake Approval  11/12/2015 PASS
DetailsJavier Guzman
Recd Pcfee & Taken To Pln CK  11/12/2015 DONE
Application received 11/12/2015