BLD-Aging Inspection | 9/28/2018 | 9/28/2018 | 9/28/2018 | | PASS |
Jim Storey
|
|
|
trade permits open
|
BLD-Aging Inspection | 5/17/2018 | 5/17/2018 | 5/17/2018 | | PASS |
Jim Storey
|
|
|
trade permits open
|
BLD-Aging Inspection | 12/29/2017 | 12/29/2017 | 1/3/2018 | | PASS |
Jim Storey
|
|
|
trade permits open
|
BLD-Aging Inspection | 8/17/2017 | 8/17/2017 | 8/17/2017 | | PASS |
Jim Storey
|
|
|
|
Routing Walk-In (BLD) | 5/22/2017 | 5/22/2017 | 5/22/2017 | A | DONE |
Brian McGowan
|
|
|
Plumbing was not on original plans
|
1st review completed | | | 5/22/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 5/22/2017 | | 5/22/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/22/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 5/22/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2017 | | DONE |
Brian McGowan
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/22/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/22/2017 | | DONE |
|
|
|
|
BLD-Aging Inspection | 4/5/2017 | 4/5/2017 | 4/5/2017 | | PASS |
Jim Storey
|
|
|
ncfi
|
BLD-Aging Inspection | 11/22/2016 | 11/22/2016 | 11/22/2016 | | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 7/8/2016 | 7/11/2016 | 7/11/2016 | A | PASS |
Jim Storey
|
|
|
Jerry Phone #: ###-####
|
BLD-Foundation | 4/18/2016 | 4/18/2016 | 4/18/2016 | P | PEND |
Phil Shearer
|
|
|
Footing/Foundation - Gerry Phone #: ###-####
|
BLD-Framing/Rough-in | 4/18/2016 | 4/18/2016 | 4/18/2016 | P | CANC |
Phil Shearer
|
|
|
Pole building Phone #: ###-####
|
OVERRIDE | | | 3/24/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 3/24/2016 | 3/24/2016 | 3/24/2016 | P | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 3/24/2016 | | 3/24/2016 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 3/24/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/24/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 3/24/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 3/8/2016 | 3/8/2016 | 3/8/2016 | A | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (Zoning) | 11/16/2015 | 11/16/2015 | 11/16/2015 | A | PASS |
Brent Moore
|
|
|
CZC15-00259
|
Routing Walk-In (BLD) | 11/16/2015 | 11/16/2015 | 11/16/2015 | A | FAIL |
Brian McGowan
|
|
|
Had preliminary draings only. Need engineered set for a pole barn construction of ADU
|
1st review completed | | | 11/16/2015 | | FAIL |
Brian McGowan
|
|
|
had preliminary drawings for pole barn. Need engineered set.
|
Routing - PLAN CHECK | 11/16/2015 | | 11/16/2015 | | FAIL |
Brian McGowan
|
|
|
Had preliminary drawings. Need engineered set.
|
Application received | | 11/16/2015 | | | |
|
|
|
|