Letter of compliance/Occupancy | | | 1/27/2017 | | DONE |
|
|
|
|
BLD-Final | 8/10/2016 | 8/11/2016 | 8/11/2016 | P | PASS |
Dave Hannah
|
|
|
call for access; Clive Phone #: ###-####
|
DOC - Permit Finaled | 8/11/2016 | 8/11/2016 | 8/11/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/5/2016 | 8/5/2016 | 8/5/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/4/2016 | 8/4/2016 | 8/5/2016 | | PEND |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 8/2/2016 | 8/2/2016 | 8/2/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Framing/Rough-in | 3/22/2016 | 3/22/2016 | 3/23/2016 | P | PASS |
Dave Hannah
|
|
|
Clive Phone #: ###-####
|
BLD-Energy code compliance | 3/22/2016 | 3/22/2016 | 3/23/2016 | P | PASS |
Dave Hannah
|
|
|
Clive Phone #: ###-####
|
BLD-Framing/Rough-in | 3/16/2016 | 3/17/2016 | 3/17/2016 | A | PART |
Dave Hannah
|
|
|
Clive Phone #: ###-####ok to insulate c/n on site
|
BLD-Wall Bracing | 3/9/2016 | 3/10/2016 | 3/10/2016 | A | PASS |
Mike Jordan
|
|
|
Shear // Clyde Phone #: ###-####
|
Plan Modification Accepted | | | 2/29/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 2/29/2016 | | 2/29/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Footing | 1/12/2016 | 1/12/2016 | 1/12/2016 | A | PASS |
Dave Hannah
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 1/11/2016 | 1/11/2016 | 1/12/2016 | P | NR |
Dave Hannah
|
|
|
Pat Phone #: ###-####
|
PubWorks Subgrade Approval | 1/11/2016 | 1/11/2016 | 1/11/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 12/18/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/18/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 12/14/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 12/3/2015 | 12/3/2015 | 12/14/2015 | | DONE |
Brian McGowan
|
|
|
due 12/14 L2 hillside
|
Routing - PLAN CHECK | 12/14/2015 | | 12/14/2015 | | PASS |
Javier Guzman
|
|
|
Brian M did review
|
1st review completed | | | 12/14/2015 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/14/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/14/2015 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Routing - PLAN CHECK | 11/23/2015 | | 12/14/2015 | | PASS |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 12/2/2015 | | 12/2/2015 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 11/23/2015 | | 12/1/2015 | | FAIL |
Troy James
|
|
|
emailed corrections to legends
|
Routing - Erosion and Sediment | 11/23/2015 | | 11/27/2015 | | PASS |
Andy J. Long
|
|
|
ESC plan and SWPPP narrative submitted and approved. Valid RP and PD for project. Approved.
|
Routing PW Grading-Hillside | 11/23/2015 | | 11/24/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - FIRE | 11/23/2015 | 11/23/2015 | 11/23/2015 | | PASS |
Scott Arellano
|
|
|
Plans were reviewed for fire department access and hydrant water availability. No comments required. Sprinklers are not required for Nativa Terrace Sub 3 Block 4 Lot 11.
|
Routing - PLANNING | 11/23/2015 | | 11/23/2015 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 11/23/2015 | | 11/23/2015 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 11/23/2015 | | 11/23/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/23/2015 | | DONE |
|
|
|
|
Intake Approval | | | 11/23/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/23/2015 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 11/23/2015 | | 11/23/2015 | | DEFR |
Tisha Gallop
|
|
|
due 12/14 L2 hillside ePlan
|
Application received | | | 11/17/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 17 2015 3:17PM
|