Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-04206
StatusFinaled
Name UNIFIED CONSTRUCTION LLC
Site Address 6148 N DISCOVERY WAY Unit: 150
Project NameGerber Products Company
Customer Number 
ePlanReviewYes
Description
**(GERBER PRODUCTS COMPANY)** Permit is to remodel an existing 2,909 sq. ft. tenant space within a 21,939 sq. ft. Building previously occupied by “Integricare” under BLD99-00929. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select millwork, construction of select new nonbearing walls to create 1 conference room, new electrical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  2/22/2016 DONE
First Notice 1/14/20162/12/2016 DONE
sent with mail 2-16-16
BLD-Final12/31/20151/4/20161/4/2016PPASS
DetailsJim Sly
would like call ahead; Elliot Phone #: ###-####
FIRE-Final Inspection12/31/20151/4/20161/4/2016APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete. Life fire safety inspection passed/complete
Permanent Occupancy  1/4/2016 DONE
FIRE-Conference12/2/201512/3/201512/3/2015ADONE
DetailsTroy Cobbley
Elliot and I discussed the single horn/strobe located within this tenant space. I deferred him to plan review and a fire alarm contractor
BLD-Framing/Rough-in12/2/201512/3/201512/3/2015APASS
DetailsJim Sly
Elliot Phone #: ###-####// please call for access
Issue PAID IN FULL permit  11/30/2015 DONE
Print Occupancy Form  11/30/2015 DONE
Plan assigned to (JG)11/19/201511/19/201511/24/2015 PASS
DetailsJavier Guzman
11/25 L1 Gerber Products Company
Routing - PLAN CHECK11/19/2015 11/24/2015 PASS
DetailsJavier Guzman
Routing - Addressing11/24/2015 11/24/2015 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS11/24/2015 11/24/2015 PASS
DetailsRachael Beierle
Signed off in ePlan by Rachael Beierle
1st review completed  11/24/2015 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/24/2015 DONE
Permit Ready to Issue  11/24/2015 DONE
Need GC Form and Revised Cert of Value
Intake Approval  11/19/2015 PASS
DetailsJavier Guzman
Application received  11/18/2015 DONE
Application submitted via PDS Online on Nov 18 2015 3:06PM