BLD-Aging Inspection | 8/2/2016 | 8/2/2016 | 8/5/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/3/2016 | 8/3/2016 | 8/5/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 3/21/2016 | 3/21/2016 | 3/21/2016 | P | PASS |
Dave Hannah
|
|
|
Brett Phone #: ###-####
|
BLD-Framing/Rough-in | 3/14/2016 | 3/15/2016 | 3/17/2016 | P | PASS |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
BLD-Framing/Rough-in | 3/16/2016 | 3/16/2016 | 3/16/2016 | P | PASS |
Dave Hannah
|
|
|
early as poss this afternoon// Brett Phone #: ###-####
|
Plan Modification Accepted | | | 3/1/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 3/1/2016 | | 3/1/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 2/18/2016 | 2/19/2016 | 2/19/2016 | P | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
BLD-Footing | 2/17/2016 | 2/18/2016 | 2/18/2016 | A | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
BLD-Wall Bracing | 2/16/2016 | 2/16/2016 | 2/18/2016 | P | PART |
Dave Hannah
|
|
|
Brett Phone #: ###-#### eastside building ok to cover ext
|
BLD-Foundation | 1/29/2016 | 2/1/2016 | 2/1/2016 | A | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
BLD-Conference | 1/28/2016 | 1/29/2016 | 1/29/2016 | A | PASS |
Dave Hannah
|
|
|
DAve-next door neighbor says the home does not meet the set backs. Can you please verify setbacks and let Mike Halitsky know the results? thanks you allsetbacks are as per plans
|
BLD-Footing | 1/22/2016 | 1/25/2016 | 1/25/2016 | P | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
BLD-Foundation | 1/15/2016 | 1/15/2016 | 1/15/2016 | P | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
BLD-Footing | 1/11/2016 | 1/11/2016 | 1/11/2016 | P | PASS |
Mike Jordan
|
|
|
Eric Phone #: ###-####. East basement footing only ok.
|
OVERRIDE | | | 12/9/2015 | | |
|
|
|
|
Routing Walk-In (BLD) | 11/19/2015 | 11/19/2015 | 12/9/2015 | A | DONE |
Brian McGowan
|
|
|
Will need manual J submitted and routed thru Mechanical.
|
Inspection Record Card- Bld | | | 12/9/2015 | | DONE |
|
|
|
|
Telephone call | | | 12/9/2015 | | DONE |
|
|
|
Spoke with Matthew and informed him that his permit is ready to be picked up and the fee amount that is due. Asked him if he is acting as the RP or if the GC Company had someone who has taken the class and is going to be the RP. He stated that he would be as the homeowner
|
Issue PAID IN FULL permit | | | 12/9/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/9/2015 | | 12/9/2015 | | PASS |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/9/2015 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 12/9/2015 | | DONE |
|
|
|
All Met
|
Case Summary (BLD) | | | 12/8/2015 | | DONE |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 11/19/2015 | | 12/8/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 12/7/2015 | | 12/8/2015 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLANNING | 11/24/2015 | | 12/7/2015 | | PASS |
Matthew A Halitsky
|
|
|
Engineering submitted 12-1-2015 per Brian M.
Per revised plans (DRH15-00345).
|
Routing - PLAN CHECK | 11/24/2015 | | 12/4/2015 | | FAIL |
Brian McGowan
|
|
|
Information and engineering required. Plan has been been given to PLANNING for review.
|
Plan resubmittals received | | | 12/1/2015 | | DONE |
|
|
|
resubmittals received 2 sets of retaining wal calcs, manuals, & sheets A5.1, A5, A3, A2 took to Brian McGowan
|
1st review completed | | | 11/24/2015 | | FAIL |
Brian McGowan
|
|
|
Engineering needed and Planning review
|
Routing Walk-In (BLD) | 11/18/2015 | 11/18/2015 | 11/19/2015 | P | DONE |
David Ferguson
|
|
|
|
Routing Walk-In (Zoning) | 11/18/2015 | 11/18/2015 | 11/18/2015 | P | PASS |
Colleen T Carroll
|
|
|
|
Application received | | 11/18/2015 | | | |
|
|
|
|