BLD-Final | 7/5/2016 | 7/6/2016 | 7/6/2016 | A | PASS |
Mike Jordan
|
|
|
Nick Phone #: ###-####
|
DOC - Permit Finaled | 7/6/2016 | 7/6/2016 | 7/6/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 2/8/2016 | 2/9/2016 | 2/9/2016 | A | PART |
Dave Hannah
|
|
|
Nick Phone #: ###-####
|
BLD-Wall Bracing | 2/8/2016 | 2/9/2016 | 2/9/2016 | A | PASS |
Dave Hannah
|
|
|
Nick Phone #: ###-#### ok to cover ext
|
Routing Walk-In (BLD) | 12/15/2015 | 12/15/2015 | 12/15/2015 | P | DONE |
Brian McGowan
|
|
|
|
Routing Walk-In (BLD) | 11/19/2015 | 11/19/2015 | 12/15/2015 | P | DONE |
Brian McGowan
|
|
|
Need engineering for gambriel roof design, foundation plan and floor flan were not drawn.
|
Routing - PLAN CHECK | 12/15/2015 | | 12/15/2015 | | PASS |
Tisha Gallop
|
|
|
per BJM
|
Routing - PLAN CHECK | 12/15/2015 | | 12/15/2015 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 12/15/2015 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 12/15/2015 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/15/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/15/2015 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 11/19/2015 | 11/19/2015 | 11/19/2015 | P | DONE |
Sue Cummings
|
|
|
|
1st review completed | | | 11/19/2015 | | FAIL |
Brian McGowan
|
|
|
Need engineering for gambriel roof design, foundation plan and floor flan were not drawn.
|
Application received | | 11/19/2015 | | | |
|
|
|
|