Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-04217
StatusFinaled
Name MARK GUHO CONSTRUCTION COMPANY
Site Address 1915 W STATE ST
Project NameCustomedica Pharmacy
Customer Number 
ePlanReviewYes
Description
(CUSTOMEDICA PHARMACY) HAMDAM LLC) **PLAN MODIFICATION FOR MINOR EXTERIOR CHANGES TO ADD A WING WALL"" "" PLAN MODIFICATION #2 INCLUDES THE REMOVAL OF ONE RESTROOM ON THE SECOND STORY TO CREATE ONE FULLY ACCESSIBLE RESTROOM, CHANGING THE BREAKROOM TO A MECHANICAL ROOM AND RELOCATING THE BREAKROOM."" ""PLAN MODIFICATION TO ADD A FOUNDATION TO A SECTION OF THE BUILDING FOUND TO BE MISSING DURING DEMOLITION OF THAT PORTION OF THE BUILDING."" Tenant improvements including an exterior upgrade to existing 3,608 s.f. building for use as a pharmacy. Work to include the removal of interior nonbearing partition walls, construction of new interior nonbearing partition walls, one new fully accessible restroom, some new storefront, exterior canopies, site work including accessible entrance and full enclosure of an existing stairway. All work per the approved plans. This building is not fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  1/3/2017 DONE
Second Notice 11/25/201612/14/2016 DONE
Mailed 12-16
First Notice 11/4/201611/15/2016 DONE
Mailed 11-16-16
PubWorks Occupancy Approval10/25/201610/25/201610/25/2016 DONE
DetailsTiffany Lowery
Print Occupancy Form  10/25/2016 DONE
Permanent Occupancy  10/25/2016 DONE
Print Occupancy Form  10/25/2016 DONE
BLD-Final10/20/201610/20/201610/20/2016PPASS
DetailsDave Hannah
Bill Phone #: ###-####
Zoning Approval10/19/201610/19/201610/19/2016 PASS
DetailsJosh Wilson
BLD-Final10/13/201610/17/201610/18/2016APART
DetailsDave Hannah
Bill Phone #: ###-#### needs zoning and public works and move sink in rest room
FIRE-Final Inspection10/13/201610/14/201610/14/2016APASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguishers are mounted with current inspection tags. Final life fire safety inspection pased/complete.
FIRE-Final Inspection10/11/201610/12/201610/12/2016PCANC
DetailsJim Page
Bill Phone #: ###-####
Print Occupancy Form  10/11/2016 DONE
BLD-Conference9/20/20169/20/20169/21/2016PPASS
DetailsDave Hannah
Bill Phone #: ###-####
BLD-Conference9/7/20169/8/20169/8/2016APASS
DetailsDave Hannah
Bill Phone #: ###-####
BLD-Ceiling Grid Inspection8/24/20168/25/20168/25/2016APASS
DetailsDave Hannah
Bill Phone #: ###-####
BLD-Energy code compliance8/1/20168/2/20168/2/2016PPASS
DetailsDave Hannah
Shut gates at 230 // Bill Phone #: ###-####
BLD-Framing/Rough-in7/28/20167/29/20167/29/2016APASS
DetailsDave Hannah
Bill Phone #: ###-#### check fire blocking at energy
BLD-Framing/Rough-in7/27/20167/28/20167/28/2016PCANC
DetailsPhil Shearer
Bill Phone #: ###-####
BLD-Wall Bracing7/21/20167/21/20167/21/2016PPASS
DetailsJim Sly
would like call ahead; Bill Phone #: ###-####
BLD-Foundation7/8/20167/8/20167/10/2016PPASS
DetailsDave Hannah
Ending work at 2 - Bill Phone #: ###-####
BLD-Foundation7/5/20167/6/20167/6/2016ANR
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Footing6/30/20167/1/20167/1/2016PPASS
DetailsDave Hannah
Adam Phone #: ###-####
OVERRIDE  6/30/2016  
Plan assigned to (CDM)6/23/20166/23/20166/30/2016 PASS
DetailsCarl D Madsen
CHANGE STATUS TO (ISS)  6/30/2016 DONE
(F) Reprint permit  6/30/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/30/2016 DONE
Permit Ready to Issue  6/30/2016 DONE
DetailsChristina Prado
All requirements met
Plan mod fees due - DO NOT RE-ISSUE
Routing - Design Review6/24/2016 6/29/2016 PASS
DetailsJosh Wilson
Routing - PLAN CHECK6/24/2016 6/27/2016 PASS
DetailsCarl D Madsen
Plan Modification Accepted  6/23/2016 DONE
DetailsChristina Prado
Adding 3 ft wall to exterior for canopy support
BLD-Conference6/20/20166/21/20166/21/2016APEND
DetailsDave Hannah
Bill Phone #: ###-#### need to rebuild staurs
OVERRIDE  6/10/2016  
Plan assigned to (CDM)5/20/20165/20/20166/10/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  6/10/2016 DONE
Permit Ready to Issue  6/10/2016 DONE
Plan mod fees due - DO NOT RE-ISSUE
Routing - PLUMBING6/8/2016 6/9/2016 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - MECHANICAL6/8/2016 6/8/2016 PASS
DetailsTroy James
Routing - PUBLIC WORKS6/8/2016 6/8/2016 PASS
DetailsRachael Beierle
Routing PW Drainage6/8/2016 6/8/2016 PASS
DetailsBrian Murphy
Routing - PLAN CHECK6/8/2016 6/8/2016 PASS
DetailsCarl D Madsen
BLD-Foundation6/1/20166/2/20166/2/2016APASS
DetailsDave Hannah
10:30 please, please call ahead as well - Bill Phone #: ###-####
BLD-Footing5/31/20166/1/20166/1/2016APASS
DetailsDave Hannah
Bill Phone #: ###-####
Plan Modification Accepted  5/20/2016 DONE
DetailsChristina Prado
Permit to rearrage existing floor plan, mechanial duct locations and upper restroom ADA upgrades and breakroom additions
CHANGE STATUS TO (ISS)  5/19/2016 DONE
OVERRIDE  5/18/2016  
Plan assigned to (CDM)5/13/20165/13/20165/18/2016 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK5/18/2016 5/18/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  5/18/2016 DONE
Permit Ready to Issue  5/18/2016 DONE
Plan Mod DO NOT ISSUE
Plan Modification Accepted  5/13/2016 DONE
Issue PAID IN FULL permit  4/13/2016 DONE
OVERRIDE  2/25/2016  
Plan assigned to (CDM)12/10/201512/10/20152/25/2016 PASS
DetailsCarl D Madsen
1st Rev. Done - Level 3 TI - ePlanReview - Hamdam LLC
PLANS/APPL TAKEN TO FRONT DESK  2/25/2016 DONE
Permit Ready to Issue  2/25/2016 DONE
DetailsChristina Prado
***requirements met***, GC Form & Revised certificate of vlaue for issuance
Routing - PLAN CHECK2/5/2016 2/25/2016 PASS
DetailsCarl D Madsen
Routing - MECHANICAL2/5/2016 2/8/2016 PASS
DetailsTroy James
Routing - FIRE2/5/20162/5/20162/5/2016 PASS
DetailsScott Arellano
Revised report attached to case.
Routing - PUBLIC WORKS2/5/2016 2/5/2016 PASS
DetailsJennifer Bruner
Plan resubmittals received  2/5/2016 DONE
Routing PW Sewer Rating12/10/2015 2/5/2016 PASS
DetailsJennifer Bruner
Routing PW Solid Waste12/10/2015 2/5/2016 PASS
DetailsMegan Durrell
1st review completed  1/8/2016 FAIL
Routing - PUBLIC WORKS12/10/2015 1/8/2016 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK12/10/2015 1/8/2016 FAIL
DetailsCarl D Madsen
Routing - FIRE12/10/201512/10/201512/14/2015 FAIL
DetailsScott Arellano
Report attached to case and emailed to architect.
Routing - Design Review12/10/2015 12/14/2015 PASS
DetailsJosh Wilson
ok per DRH15-00384
Routing PW Street Lights12/10/2015 12/11/2015 PASS
DetailsMike D Hedge
No new street lighting required.
Pending Assignment by JCB12/10/2015 12/10/2015 DONE
DetailsJason Blais
First review completed
Routing - PLUMBING12/10/2015 12/10/2015 PASS
DetailsBill VanDegrift
1) asse 1070 mixing valve required at public lavs
2) rp required upstream of the filter system to the lab, locate away from the lab over drainage.
3) potable water to eyewash
Routing - MECHANICAL12/10/2015 12/10/2015 FAIL
DetailsTroy James
talked to mechanical engineer about approved location of exhaust
Routing PW Drainage12/10/2015 12/10/2015 PASS
DetailsBrian Murphy
Routing - Erosion and Sediment12/10/2015 12/10/2015 PASS
DetailsEvan Jenkins
(HAMDAM LLC) A tenant improvement including an exterior upgrade to existing 3,608 s.f. building for pharmacy use.
Routing - Addressing12/10/2015 12/10/2015 PASS
DetailsLaura Hunter
Intake Approval  12/9/2015 PASS
DetailsJason Blais
Prescreen approved by Dave Ferguson and plan review fees paid.
Intake Approval  11/23/2015 FAIL
DetailsDavid Ferguson
We're still missing some documents that just spoke about on the phone. Please get those uploaded and I review the pre-screen tomorrow.
Intake Approval  11/20/2015 FAIL
DetailsDavid Ferguson
After reviewing the scope of work, this project is considered a Major TI therefore requiring you to fill out form #520 and resubmitted.
Application received  11/19/2015 DONE
Application submitted via PDS Online on Nov 19 2015 4:32PM