Print Statement | | | 1/3/2017 | | DONE |
|
|
|
|
Second Notice | | 11/25/2016 | 12/14/2016 | | DONE |
|
|
|
Mailed 12-16
|
First Notice | | 11/4/2016 | 11/15/2016 | | DONE |
|
|
|
Mailed 11-16-16
|
PubWorks Occupancy Approval | 10/25/2016 | 10/25/2016 | 10/25/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Print Occupancy Form | | | 10/25/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/25/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/25/2016 | | DONE |
|
|
|
|
BLD-Final | 10/20/2016 | 10/20/2016 | 10/20/2016 | P | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
Zoning Approval | 10/19/2016 | 10/19/2016 | 10/19/2016 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 10/13/2016 | 10/17/2016 | 10/18/2016 | A | PART |
Dave Hannah
|
|
|
Bill Phone #: ###-#### needs zoning and public works and move sink in rest room
|
FIRE-Final Inspection | 10/13/2016 | 10/14/2016 | 10/14/2016 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguishers are mounted with current inspection tags. Final life fire safety inspection pased/complete.
|
FIRE-Final Inspection | 10/11/2016 | 10/12/2016 | 10/12/2016 | P | CANC |
Jim Page
|
|
|
Bill Phone #: ###-####
|
Print Occupancy Form | | | 10/11/2016 | | DONE |
|
|
|
|
BLD-Conference | 9/20/2016 | 9/20/2016 | 9/21/2016 | P | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
BLD-Conference | 9/7/2016 | 9/8/2016 | 9/8/2016 | A | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/24/2016 | 8/25/2016 | 8/25/2016 | A | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
BLD-Energy code compliance | 8/1/2016 | 8/2/2016 | 8/2/2016 | P | PASS |
Dave Hannah
|
|
|
Shut gates at 230 // Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 7/28/2016 | 7/29/2016 | 7/29/2016 | A | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-#### check fire blocking at energy
|
BLD-Framing/Rough-in | 7/27/2016 | 7/28/2016 | 7/28/2016 | P | CANC |
Phil Shearer
|
|
|
Bill Phone #: ###-####
|
BLD-Wall Bracing | 7/21/2016 | 7/21/2016 | 7/21/2016 | P | PASS |
Jim Sly
|
|
|
would like call ahead; Bill Phone #: ###-####
|
BLD-Foundation | 7/8/2016 | 7/8/2016 | 7/10/2016 | P | PASS |
Dave Hannah
|
|
|
Ending work at 2 - Bill Phone #: ###-####
|
BLD-Foundation | 7/5/2016 | 7/6/2016 | 7/6/2016 | A | NR |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Footing | 6/30/2016 | 7/1/2016 | 7/1/2016 | P | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
OVERRIDE | | | 6/30/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 6/23/2016 | 6/23/2016 | 6/30/2016 | | PASS |
Carl D Madsen
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/30/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/30/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/30/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/30/2016 | | DONE |
Christina Prado
|
|
|
All requirements met
Plan mod fees due - DO NOT RE-ISSUE
|
Routing - Design Review | 6/24/2016 | | 6/29/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLAN CHECK | 6/24/2016 | | 6/27/2016 | | PASS |
Carl D Madsen
|
|
|
|
Plan Modification Accepted | | | 6/23/2016 | | DONE |
Christina Prado
|
|
|
Adding 3 ft wall to exterior for canopy support
|
BLD-Conference | 6/20/2016 | 6/21/2016 | 6/21/2016 | A | PEND |
Dave Hannah
|
|
|
Bill Phone #: ###-#### need to rebuild staurs
|
OVERRIDE | | | 6/10/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 5/20/2016 | 5/20/2016 | 6/10/2016 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/10/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/10/2016 | | DONE |
|
|
|
Plan mod fees due - DO NOT RE-ISSUE
|
Routing - PLUMBING | 6/8/2016 | | 6/9/2016 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - MECHANICAL | 6/8/2016 | | 6/8/2016 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 6/8/2016 | | 6/8/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 6/8/2016 | | 6/8/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 6/8/2016 | | 6/8/2016 | | PASS |
Carl D Madsen
|
|
|
|
BLD-Foundation | 6/1/2016 | 6/2/2016 | 6/2/2016 | A | PASS |
Dave Hannah
|
|
|
10:30 please, please call ahead as well - Bill Phone #: ###-####
|
BLD-Footing | 5/31/2016 | 6/1/2016 | 6/1/2016 | A | PASS |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
Plan Modification Accepted | | | 5/20/2016 | | DONE |
Christina Prado
|
|
|
Permit to rearrage existing floor plan, mechanial duct locations and upper restroom ADA upgrades and breakroom additions
|
CHANGE STATUS TO (ISS) | | | 5/19/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 5/18/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 5/13/2016 | 5/13/2016 | 5/18/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 5/18/2016 | | 5/18/2016 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/18/2016 | | DONE |
|
|
|
Plan Mod DO NOT ISSUE
|
Plan Modification Accepted | | | 5/13/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/13/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 2/25/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 12/10/2015 | 12/10/2015 | 2/25/2016 | | PASS |
Carl D Madsen
|
|
|
1st Rev. Done - Level 3 TI - ePlanReview - Hamdam LLC
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/25/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/25/2016 | | DONE |
Christina Prado
|
|
|
***requirements met***, GC Form & Revised certificate of vlaue for issuance
|
Routing - PLAN CHECK | 2/5/2016 | | 2/25/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 2/5/2016 | | 2/8/2016 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 2/5/2016 | 2/5/2016 | 2/5/2016 | | PASS |
Scott Arellano
|
|
|
Revised report attached to case.
|
Routing - PUBLIC WORKS | 2/5/2016 | | 2/5/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Plan resubmittals received | | | 2/5/2016 | | DONE |
|
|
|
|
Routing PW Sewer Rating | 12/10/2015 | | 2/5/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Solid Waste | 12/10/2015 | | 2/5/2016 | | PASS |
Megan Durrell
|
|
|
|
1st review completed | | | 1/8/2016 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 12/10/2015 | | 1/8/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 12/10/2015 | | 1/8/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - FIRE | 12/10/2015 | 12/10/2015 | 12/14/2015 | | FAIL |
Scott Arellano
|
|
|
Report attached to case and emailed to architect.
|
Routing - Design Review | 12/10/2015 | | 12/14/2015 | | PASS |
Josh Wilson
|
|
|
ok per DRH15-00384
|
Routing PW Street Lights | 12/10/2015 | | 12/11/2015 | | PASS |
Mike D Hedge
|
|
|
No new street lighting required.
|
Pending Assignment by JCB | 12/10/2015 | | 12/10/2015 | | DONE |
Jason Blais
|
|
|
First review completed
|
Routing - PLUMBING | 12/10/2015 | | 12/10/2015 | | PASS |
Bill VanDegrift
|
|
|
1) asse 1070 mixing valve required at public lavs
2) rp required upstream of the filter system to the lab, locate away from the lab over drainage.
3) potable water to eyewash
|
Routing - MECHANICAL | 12/10/2015 | | 12/10/2015 | | FAIL |
Troy James
|
|
|
talked to mechanical engineer about approved location of exhaust
|
Routing PW Drainage | 12/10/2015 | | 12/10/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - Erosion and Sediment | 12/10/2015 | | 12/10/2015 | | PASS |
Evan Jenkins
|
|
|
(HAMDAM LLC) A tenant improvement including an exterior upgrade to existing 3,608 s.f. building for pharmacy use.
|
Routing - Addressing | 12/10/2015 | | 12/10/2015 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 12/9/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Dave Ferguson and plan review fees paid.
|
Intake Approval | | | 11/23/2015 | | FAIL |
David Ferguson
|
|
|
We're still missing some documents that just spoke about on the phone. Please get those uploaded and I review the pre-screen tomorrow.
|
Intake Approval | | | 11/20/2015 | | FAIL |
David Ferguson
|
|
|
After reviewing the scope of work, this project is considered a Major TI therefore requiring you to fill out form #520 and resubmitted.
|
Application received | | | 11/19/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 19 2015 4:32PM
|