DOC - Permit Finaled | | | 10/19/2016 | | DONE |
|
|
|
Per CO issuasnce in BLD16-00244 & inspector 425
|
Zoning Approval | 9/21/2016 | 9/21/2016 | 9/21/2016 | | PASS |
Sarah Schafer
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/15/2016 | | DONE |
|
|
|
plan mod fees paid
|
OVERRIDE | | | 9/8/2016 | | |
|
|
|
|
Plan assigned to (JG) | 9/6/2016 | 9/6/2016 | 9/8/2016 | | PASS |
Javier Guzman
|
|
|
Plan Modificaiton
|
Routing - PLAN CHECK | 9/6/2016 | | 9/8/2016 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/8/2016 | | DONE |
|
|
|
Plan mod fee ONLY - DO NOT RE-ISSUE
|
Routing - FIRE | 9/6/2016 | 9/6/2016 | 9/7/2016 | | PASS |
Katie Marron
|
|
|
Modifications reviewed. No change in comments required.
|
Routing - Design Review | 9/6/2016 | | 9/7/2016 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PUBLIC WORKS | 9/6/2016 | | 9/6/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 9/6/2016 | | 9/6/2016 | | PASS |
Brian Murphy
|
|
|
DRAINAGE MODIFICATION
|
Plan Modification Accepted | | | 9/1/2016 | | |
|
|
|
Changes to Drainage
|
BLD-Foundation | 2/12/2016 | 2/12/2016 | 2/12/2016 | P | PART |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears Select Walls and column Anchor bolts OK pending STRATA special inspections, tests and approvals.
|
BLD-Foundation | 2/9/2016 | 2/9/2016 | 2/10/2016 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 2/4/2016 | 2/4/2016 | 2/4/2016 | P | PEND |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears ok after s/i sign off
|
Issue PAID IN FULL permit | | | 1/29/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 1/11/2016 | | |
|
|
|
|
Routing PW Environmental | 1/11/2016 | | 1/11/2016 | | PASS |
Rick Christenson
|
|
|
Per Rick Christianson, approved with condition that if they add a restaurant in the future they install a grease interceptor.
|
Routing PW Drainage | 1/11/2016 | | 1/11/2016 | | PASS |
Brian Murphy
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/11/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/11/2016 | | DONE |
Christina Prado
|
|
|
***ALL REQUIREMENTS MET - NO ACHD< FOUNDATION ONLY** 1/19/16 C_P
***still needs ACHD, GC Form, Rev Cert of Value 1-14-16 /CEV
Need ACHD, RP, GC Form & Revised Certificate of Value for issuance
|
Plan assigned to (TLW) | 11/30/2015 | | 1/11/2016 | | PASS |
Tim L. Woodard
|
|
|
1st Review Completed - River Street Mixed Use Building
|
Routing Off Site - STRUCTURAL | 1/5/2016 | | 1/5/2016 | | PASS |
Angela Brosious
|
|
|
resubs for foundation approved per Chris Holladay via email.
|
Route to Impact Fee Review | 12/29/2015 | 1/1/2016 | 12/30/2015 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Environmental | 12/15/2015 | | 12/28/2015 | | FAIL |
Rick Christenson
|
|
|
If retail space is utilized by restaurant tenant grease abatement must be installed. Plumbing plans need to be submitted showing fixture connections.
|
Routing PW Solid Waste | 12/28/2015 | | 12/28/2015 | | PASS |
Megan Durrell
|
|
|
|
1st review completed | | | 12/28/2015 | | FAIL |
Tim L. Woodard
|
|
|
Failed Addressing, Fire, Design Review, PW Solid Waste, PW Drainage, Structural, Building and PW Environmental.
|
Routing - PLANNING Land Div | 11/30/2015 | | 12/24/2015 | | PASS |
Tim L. Woodard
|
|
|
Approved in E-plan. TLW
|
Routing - PLAN CHECK | 11/30/2015 | | 12/24/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing Off Site - STRUCTURAL | 11/30/2015 | | 12/18/2015 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Street Lights | 12/15/2015 | | 12/15/2015 | | PASS |
Mike D Hedge
|
|
|
|
Routing PW Drainage | 12/15/2015 | | 12/15/2015 | | FAIL |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 12/15/2015 | | 12/15/2015 | | FAIL |
Megan Durrell
|
|
|
Dedicated space for trash/recycling must be provided on this parcel by either a trash enclosure or trash room.
|
Routing - Design Review | 12/15/2015 | | 12/15/2015 | | PASS |
Andrea Tuning
|
|
|
The applicant is required to submit documentation from Solid Waste allowing an offsite trash enclosure.
Tree required in landscape planter as well.
|
Routing PW Sewer Design | 12/9/2015 | | 12/9/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - Design Review | 11/30/2015 | | 12/4/2015 | | FAIL |
Sarah Schafer
|
|
|
The applicant is required to submit documentation from Solid Waste allowing an offsite trash enclosure.
Tree required in landscape planter as well.
Attached Hold Harmless Agreement. TLW
|
Routing - FIRE | 12/2/2015 | 12/2/2015 | 12/3/2015 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing - FIRE | 11/30/2015 | 11/30/2015 | 12/2/2015 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing - PLUMBING | 11/30/2015 | | 12/2/2015 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 11/30/2015 | | 12/1/2015 | | FAIL |
Laura Hunter
|
|
|
Need address verification. Plans have 1201 W River St, BLD has 604 S 13th St. Which parcel is being constructed?
|
Routing - PUBLIC WORKS | 11/30/2015 | | 12/1/2015 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 11/30/2015 | | 12/1/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required prior to Earth Disturbance)
**Project Management-Angie Brosious** Construct a 4 story 16,581 sf mixed use office retail development with residential dormitory: Foundation & Site Work Only
|
Intake Approval | | | 11/30/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 11/30/2015 | | 11/30/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | | 11/20/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 20 2015 11:33AM
|