Permit Information
Permit NumberBLD15-04239
StatusFinaled
Name STEED CONSTRUCTION
Site Address 2910 E AMITY RD
Project NameHayden Beverage - Relocation
Customer Number 
ePlanReviewYes
Description
**Project Management-Ron Hill**(HAYDEN BEVERAGE - Loading Dock Addition) Phase I permit for exterior and interiror improvements to an existing 175,990 sq.ft. building with work to include partial removal exterior wall sections to accomodate new overhead doors and the construction of a new below grade loading dock approaches per the approved plans. This is a fully fire sprinklered building for unlimited area. No racking is allowed under this permit. A separate racking permit is required for any racking over 8 feet in height. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. Phase 2 being done under separate permit of BLD15-04516. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 10/20/201611/14/2016 DONE
Mailed 11-16-16 (no trade values) This permit finaled on the web by Cameron Murphy
First Notice 9/29/201610/10/2016 DONE
mailed 10-11-16
Meeting  9/20/2016 DONE
as per Ron Hill-1 c of o for 3 phases-BLD16-00605, BLD15-04516 & BLD15-04239
BLD-Final9/19/20169/19/20169/19/2016PPASS
DetailsJim Storey
Permanent Occupancy  9/19/2016 DONE
PubWorks Occupancy Approval9/16/20169/16/20169/16/2016 DONE
DetailsTiffany Lowery
Zoning Approval9/14/20169/14/20169/14/2016 PASS
DetailsJosh Wilson
BLD-Conference8/9/20168/10/20168/10/2016APASS
DetailsJim Storey
I've tried to contact someone on this to have them either extend the temp c of o or call in inspections to final. No one calls me back. Can you check to see if they are ready to have the building final?wip
Temporary Occupancy8/10/201611/8/20168/10/2016 DONE
DetailsCandy A. Nichols
Jason B ok'd extension good for 90 days from 7/21/16
Meeting  8/9/2016 DONE
i've tried several times to ask about temp c of o so sent Jim Storey out to see if they're ready for the final or let know they need to contact us to request and extension
Telephone call  8/9/2016 DONE
called Cameron to ask him to ask for an extension on temp c of o if not ready for final
Telephone call  7/29/2016 DONE
reminder call about temp c of o expiring-left message on his phone
Telephone call  7/20/2016 DONE
called Odi-talked to Jason-he will either call in final if ready or email Jason B for an extension
BLD-Aging Inspection6/14/20166/14/20166/14/2016 PASS
DetailsJim Storey
Temporary Occupancy4/22/20167/21/20164/22/2016 DONE
DetailsBrittany Hill
Print Occupancy Form  4/22/2016 DONE
Zoning Approval4/15/20164/15/20164/15/2016 DONE
DetailsAndrea Tuning
BLD-Final4/13/20164/14/20164/14/2016PPART
DetailsJim Storey
Odi Phone #: ###-#### temp ok
FIRE-Final Inspection4/13/20164/14/20164/14/2016APASS
DetailsJim Page
Previously noted items addressed/repaired. Final life fire safety inspection for phase 1 passedcomplete.
BLD-Final3/15/20163/17/20163/17/2016ANR
DetailsJim Storey
Temp approval - Odie Phone #: ###-####
Zoning Approval Temp3/17/20163/17/20163/17/2016 DONE
DetailsAndrea Tuning
A bond has been placed for teh bicycle parking and bicycle shelter.
FIRE-Final Inspection3/14/20163/15/20163/15/2016PPART
DetailsJim Page
Fire sprinkler inspection for phase 1 complete, fire alarm inspection for phase 1 complete, fire extinguishers for phase 1 in place with current inspection tags. Exit discharge illumination not installed at time of inspection, light fixtures are on order and will be installed when received. Life fire safety inspection partially complete, will be finaled after verification of exit discharge lighting install and fire apparatus access correction.
BLD-Framing/Rough-in2/24/20162/24/20162/24/2016PPASS
DetailsJim Storey
Phone #: ###-####
BLD-Other1/19/20161/19/20161/19/2016PDEFR
DetailsJim Storey
seepage bed; Ody Phone #: ###-#### public works insp.
OVERRIDE  1/11/2016  
Issue PAID IN FULL permit  1/11/2016 DONE
Print Occupancy Form  1/11/2016 DONE
Permit Ready to Issue  1/11/2016 DONE
DetailsChristina Prado
***ALL REQUIRMENTS MET 1-11-16 /CEV
Need ACHD, RP, GC Form & Revised certificate of value for issuance
Routing - PLAN CHECK1/8/2016 1/9/2016 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  1/9/2016 DONE
Plan assigned to (CDM)11/30/2015 1/9/2016 PASS
DetailsCarl D Madsen
First review completed
Routing - FIRE1/8/20161/8/20161/8/2016 PASS
DetailsScott Arellano
Revised report and email correspondence attached to case.
Routing Off Site - STRUCTURAL12/30/2015 1/6/2016 PASS
DetailsCarl D Madsen
Routing PW Drainage12/30/2015 1/6/2016 PASS
DetailsBrian Murphy
Routing - FIRE12/30/201512/30/201512/30/2015 FAIL
DetailsKatie Marron
Previous notice items corrected. One additional addressed. Report attached to case and emailed to architect.
Routing PW Sewer Rating12/30/2015 12/30/2015 PASS
DetailsRachael Beierle
Routing - PLAN CHECK12/30/2015 12/30/2015 FAIL
DetailsCarl D Madsen
Original plan review comments were not addressed
Routing - PLANNING12/30/2015 12/30/2015 PASS
DetailsAndrea Tuning
1st review completed  12/22/2015 FAIL
Routing Off Site - STRUCTURAL11/30/2015 12/22/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK11/30/2015 12/22/2015 FAIL
DetailsCarl D Madsen
Routing - FIRE11/30/201511/30/201512/7/2015 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
Routing PW Drainage12/4/2015 12/4/2015 FAIL
SEEPAGE BED NEEDS M WELL
Routing PW Environmental12/2/2015 12/2/2015 PASS
DetailsMegan Durrell
Routing - PLUMBING11/30/2015 12/2/2015 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLANNING Land Div11/30/2015 12/1/2015 PASS
DetailsDave Abo
Routing - Addressing11/30/2015 12/1/2015 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS11/30/2015 12/1/2015 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment11/30/2015 12/1/2015 PASS
DetailsEvan Jenkins
**Project Management-Ron Hill**(HAYDEN BEVERAGE - Loading Dock Addition) Office and warehouse facility relocation project for Hayden Beverage.
Routing - Design Review11/30/2015 12/1/2015 PASS
DetailsAndrea Tuning
Intake Approval  11/30/2015 PASS
Pending Assignment by TLW11/30/2015 11/30/2015 DONE
DetailsTim L. Woodard
first review completed
Intake Approval  11/23/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Please see mark up notes on the check list for items that are missing and or need addressed.

Thank you
Application received  11/20/2015 DONE
Application submitted via PDS Online on Nov 20 2015 5:14PM