First Notice | | 6/12/2016 | 6/3/2016 | | DONE |
|
|
|
This permit finaled on the web by John Binfet
|
BLD-Final | 6/2/2016 | 6/2/2016 | 6/2/2016 | P | PASS |
Jim Sly
|
|
|
Call John for access, zoning, public works and esc all finaled now Phone #: ###-#### Inspection requested via web by John Binfet OK for Perm Occ.
|
PubWorks Occupancy Approval | 6/2/2016 | 6/2/2016 | 6/2/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 6/2/2016 | 6/2/2016 | 6/2/2016 | | DONE |
Andrea Tuning
|
|
|
|
Permanent Occupancy | | | 6/2/2016 | | DONE |
|
|
|
|
BLD-Final | 5/31/2016 | 6/1/2016 | 6/1/2016 | A | NR |
Jim Sly
|
|
|
Building is open, John is available by phone (G.C.) Phone #: ###-#### Inspection requested via web by John Binfet Need Zoning and Public Work final.
|
FIRE-Final Inspection | 5/31/2016 | 6/1/2016 | 6/1/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Conference | 5/16/2016 | 5/16/2016 | 5/16/2016 | P | DONE |
Troy Cobbley
|
|
|
No Parking signs will not be required by Fire.
|
BLD-Energy code compliance | 4/12/2016 | 4/13/2016 | 4/13/2016 | A | PASS |
Phil Shearer
|
|
|
Air seal inspection done by Jim Sly 4/11/16 Walls ready for insulation inspection / V.B. Insulator Chuck : ###-#### Key Hidden on top of door jamb on Orchard side Phone #: ###-#### Inspection requested via web by John Binfet
|
BLD-Energy code compliance | 4/11/2016 | 4/12/2016 | 4/12/2016 | A | CANC |
Jim Sly
|
|
|
Key Hidden above top door jamb off Orchard side. Air Seal inspection Insulator is Chuck :###-#### Phone #: ###-#### Inspection requested via web by John Binfet
|
BLD-Energy code compliance | 4/11/2016 | 4/11/2016 | 4/11/2016 | P | CANC |
Jim Sly
|
|
|
Air seal inspection, insulation to go in tomorrow. Key is on top of door jamb off Orchard side.
Phone #: ###-#### >> Inspection requested via web by John Binfet Inspection cancelled from web by: John Binfet
|
BLD-Energy code compliance | 4/11/2016 | 4/12/2016 | 4/11/2016 | P | CANC |
Phil Shearer
|
|
|
Wall insulation inspection for wall cover. Key is on top of door jamb off Orchard side.
Phone #: ###-#### >> Inspection requested via web by John Binfet Inspection cancelled from web by: John Binfet
|
BLD-Framing/Rough-in | 3/31/2016 | 4/1/2016 | 4/1/2016 | A | PASS |
Phil Shearer
|
|
|
Key on site above rear door top jamb if not unlocked Phone #: ###-#### Inspection requested via web by John Binfet
|
BLD-Wall Bracing | 3/11/2016 | 3/11/2016 | 3/11/2016 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by John Binfet
|
BLD-Footing | 3/7/2016 | 3/7/2016 | 3/7/2016 | A | PART |
Jim Sly
|
|
|
Curtis, concrete contractor Phone #: ###-#### Inspection requested via web by John Binfet Footing OK....Called Curtis.....Conc Contr. Let him know rise at front stair at 71/4" Needs to be 7" max. rise.
|
BLD-Conference | 2/19/2016 | 2/22/2016 | 2/22/2016 | A | DONE |
Phil Shearer
|
|
|
|
BLD-Conference | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | PASS |
Phil Shearer
|
|
|
Curtis Phone #: ###-####
|
BLD-Footing | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | PASS |
Phil Shearer
|
|
|
Curtis Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/15/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/15/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 12/30/2015 | | |
|
|
|
|
Plan assigned to (CJW) | 12/4/2015 | 12/4/2015 | 12/30/2015 | | PASS |
Carl Westfall
|
|
|
(Jan 1 - 20 days) (Dec 25 - 3 weeks) Southwest Associates - ePlan - Level 3
|
Routing - PLAN CHECK | 12/4/2015 | | 12/30/2015 | | PASS |
Carl Westfall
|
|
|
Drawings approved with referenced code sections
|
1st review completed | | | 12/30/2015 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/30/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/30/2015 | | DONE |
Christina Prado
|
|
|
***ALL REQUIRMENTS MET 1-14-16 /CEV
***Still needs ACHD & Revised Cert of Value 1-4-15
Need ACHD, GC, RP & Revised certificate of vlaue for issuance
|
Routing PW Drainage | 12/7/2015 | | 12/23/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 12/4/2015 | 12/4/2015 | 12/8/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - PLUMBING | 12/4/2015 | | 12/8/2015 | | PASS |
Daryl Spivey
|
|
|
no plan no review install plumbing per ISPC
|
Routing PW Street Lights | 12/7/2015 | | 12/7/2015 | | PASS |
Megan Durrell
|
|
|
No new street lighting required.
|
Routing PW Sewer Rating | 12/7/2015 | | 12/7/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - PUBLIC WORKS | 12/4/2015 | | 12/7/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 12/4/2015 | | 12/7/2015 | | PASS |
Evan Jenkins
|
|
|
(SOUTHWEST ASSOCIATES) Conversion of an existing 1,976 sq ft residence to an office building.
|
Routing - Addressing | 12/4/2015 | | 12/4/2015 | | PASS |
Laura Hunter
|
|
|
|
Routing - Design Review | 12/4/2015 | | 12/4/2015 | | PASS |
Andrea Tuning
|
|
|
|
Pending Assignment by TLW | 12/4/2015 | | 12/4/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 12/3/2015 | | PASS |
|
|
|
|
Intake Approval | | | 11/30/2015 | | FAIL |
|
|
|
Bill,
Please upload the structural calculations into the documents folder in order for us to start the Building Permit Review.
Best regards,
Tim Woodard
City of Boise
Plans Examiner II
twoodard@cityofboise.org
|
Application received | | | 11/24/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 24 2015 1:14PM
|