First Notice | | 10/15/2016 | 11/15/2016 | | DONE |
|
|
|
Mailed 11-16-16
|
Permanent Occupancy | | | 10/5/2016 | | DONE |
|
|
|
|
BLD-Final | 10/3/2016 | 10/4/2016 | 10/4/2016 | P | PASS |
Mike Jordan
|
|
|
TJ Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 10/3/2016 | 10/4/2016 | 10/3/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 9/7/2016 | 9/7/2016 | 9/7/2016 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Zoning Approval | 9/7/2016 | 9/7/2016 | 9/7/2016 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 8/25/2016 | 8/25/2016 | 8/25/2016 | P | FAIL |
Troy Cobbley
|
|
|
Need fire dept access painting as discussed, need door signage as discussed and need operational permit from fire dept.
Tom Phone #: ###-####
|
FIRE-Conference | 8/24/2016 | 8/24/2016 | 8/24/2016 | P | DONE |
Troy Cobbley
|
|
|
Jeff and I went over life safety requirements. See the fire review notes for items marked ok and items circled that need addressed for a final inspection.
|
PubWorks Occupancy Approval | 8/22/2016 | 8/22/2016 | 8/22/2016 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Framing/Rough-in | 5/24/2016 | 5/24/2016 | 5/24/2016 | P | PASS |
Mike Jordan
|
|
|
Job site visit. Walked job, inspected door hardware, stairs, guard rails and handrails. Also reviewed special inspection reports.
|
OVERRIDE | | | 2/17/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/17/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/17/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/17/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 2/16/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 12/4/2015 | 12/4/2015 | 2/16/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Darigold Engine Room
|
Routing Off Site - STRUCTURAL | 2/8/2016 | | 2/16/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Drainage | 2/8/2016 | | 2/16/2016 | | PASS |
Jason C. Taylor
|
|
|
See engineer letter of approval for existing site drainage.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/16/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/16/2016 | | DONE |
Christina Prado
|
|
|
Need ***ACHD IN DOCUMENTS AND RP MET*** AHCD, RP) , GC Form & Revised certificate of value for issuance
|
Routing - PLAN CHECK | 2/8/2016 | | 2/8/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Environmental | 2/2/2016 | | 2/2/2016 | | PASS |
Rick Christenson
|
|
|
|
Routing Off Site - STRUCTURAL | 1/22/2016 | | 2/2/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 1/22/2016 | | 2/2/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
pending structural and drainage approval
|
Routing PW Drainage | 1/22/2016 | | 1/28/2016 | | FAIL |
Brian Murphy
|
|
|
See changemarks in ePlan. JCT
|
Routing - Erosion and Sediment | 1/22/2016 | | 1/25/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(DARIGOLD - ENGINE ROOM) High efficiency HVAC is used for the additional energy package. Special inspection required per attached 310 form. A new engine room separate from the plant will be provided along with refrigeration upgrades which will change refrigeration from ammonia to glycol. Foundation for this building has been issued under BLD15-03008. Scope of work to inlcude site work, foundation, walls, roof structure, mechanical, electrical and plumbing.
|
Routing - FIRE | 1/22/2016 | 1/22/2016 | 1/22/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to case, and attached response letter with detailed clarification on mechanical systems meeting IFC section 606.
|
Routing - Design Review | 1/22/2016 | | 1/22/2016 | | PASS |
Andrea Tuning
|
|
|
|
Route to Impact Fee Review | 1/4/2016 | 1/7/2016 | 1/7/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - MECHANICAL | 12/29/2015 | | 1/4/2016 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 1/4/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 12/4/2015 | | 12/30/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 12/4/2015 | | 12/18/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
emailed comments to Scott Marshal, Applicant
|
Routing - FIRE | 12/4/2015 | 12/4/2015 | 12/14/2015 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing PW Drainage | 12/9/2015 | | 12/9/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLUMBING | 12/4/2015 | | 12/8/2015 | | PASS |
Daryl Spivey
|
|
|
1) additional cross connection protection may be required
2) trap and vent all waste openings
|
Routing - Erosion and Sediment | 12/4/2015 | | 12/7/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
A new engine room separate from the plant will be provided along with refrigeration upgrades which will change refrigeration from ammonia to glycol. NOTE THAT THE FOUNDATION & STRUCTURAL REVIEW IS UNDER A SEPARATE PERMIT NUMBER.
|
Routing - Design Review | 12/4/2015 | | 12/4/2015 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Addressing | 12/4/2015 | | 12/4/2015 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/4/2015 | | 12/4/2015 | | PASS |
Rachael Beierle
|
|
|
|
Pending Assignment by TLW | 12/4/2015 | | 12/4/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 12/3/2015 | | PASS |
|
|
|
|
Intake Approval | | | 11/30/2015 | | FAIL |
|
|
|
Scott,
Please provide or provide guidance on the following: provide Hazardous Materials Inventory Statement (by approved agency), revise some sheets to include the Design Engineers Idaho Licensed Stamp and Signature, and provide guidance as to level of "Confidentiality". A separate process will have to be pursued if you wish this document not to be public record upon the completion of the permit.
Best regards,
Tim Woodard
###-####
twoodard@cityofboise.org
|
Application received | | | 11/24/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 24 2015 3:51PM
|
BLD-Framing/Rough-in | 3/16/2016 | 3/16/2016 | | P | |
Mike Jordan
|
|
|
Jeff Phone #: ###-####
|