Plan Reviewer's activity | | | 3/21/2018 | | DONE |
|
|
|
took the drawings to records
|
Third Notice | | 7/16/2016 | 8/12/2016 | | DONE |
|
|
|
|
Second Notice | | 6/20/2016 | 7/11/2016 | | DONE |
|
|
|
Mailed 7-12-16
|
First Notice | | 4/15/2016 | 6/10/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 4/5/2016 | | DONE |
|
|
|
|
BLD-Final | 4/4/2016 | 4/4/2016 | 4/4/2016 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 4/4/2016 | 4/4/2016 | 4/4/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 4/4/2016 | 4/4/2016 | 4/4/2016 | | DONE |
Andrea Tuning
|
|
|
|
PubWorks Temp Occupancy Appr | 3/21/2016 | 3/21/2016 | 3/21/2016 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 3/18/2016 | 3/18/2016 | 3/18/2016 | P | NR |
Phil Shearer
|
|
|
Need zoneing sign off,
|
BLD-Final | 3/16/2016 | 3/17/2016 | 3/17/2016 | A | NR |
Phil Shearer
|
|
|
Brad Phone #: ###-####
|
BLD-Final | 3/15/2016 | 3/16/2016 | 3/16/2016 | A | NR |
Phil Shearer
|
|
|
Brad Phone #: ###-####. Open ELE and PLM permits
|
FIRE-Final Inspection | 3/14/2016 | 3/15/2016 | 3/15/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 3/11/2016 | 3/14/2016 | 3/14/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection tags for the two fire extinguishers.
|
BLD-Foundation | 2/10/2016 | 2/11/2016 | 2/11/2016 | A | PASS |
Jim Sly
|
|
|
stem wall; Lane Phone #: ###-####
|
BLD-Footing | 2/8/2016 | 2/9/2016 | 2/9/2016 | A | PASS |
Jim Storey
|
|
|
Lane Phone #: ###-####
|
Inspection Record Card- Bld | | | 1/15/2016 | | DONE |
|
|
|
|
Telephone call | | | 1/6/2016 | | DONE |
|
|
|
called bradley to let knw permit is ready-we need RP, GC & rev cert of val
|
Issue PAID IN FULL permit | | | 1/6/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 1/5/2016 | | |
|
|
|
|
Plan assigned to (CJW) | 12/3/2015 | 12/3/2015 | 1/5/2016 | | PASS |
Carl Westfall
|
|
|
(1st done) (Dec 21 - 3 weeks) (Dec 28 - 4 weeks) Century way - paper - addition
|
Pending Assignment by TLW | 12/1/2015 | | 1/5/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 1/5/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/5/2016 | | DONE |
|
|
|
Need ACHD, RP, GC Form and Revised Cert of Value
1-6-16 see ACHD letter for fees due CAN parcel owner is GC and the permit app was turned in by owner so rec cert of val needed CAN
|
Routing - PLAN CHECK | 12/30/2015 | | 1/5/2016 | | DONE |
Carl Westfall
|
|
|
Called for by Drainage
|
Routing - PUBLIC WORKS | 1/5/2016 | | 1/5/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 1/5/2016 | | 1/5/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 1/5/2016 | | 1/5/2016 | | DONE |
Carl Westfall
|
|
|
Routing completed and approved
|
Routing - Erosion and Sediment | 12/29/2015 | | 12/30/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(CENTURY WAY WAREHOUSE – BUILDING ADDITION) This building does not have a fire sprinkler system. To construct a 1,100 square foot metal building addition to an existing 3,300 square foot metal building. Work is to include concrete footings, concrete foundation, concrete slab on grade, and an engineered metal building. Special Inspection is required for epoxy anchors and for bolting.
|
Routing - PUBLIC WORKS | 12/28/2015 | | 12/29/2015 | | FAIL |
Beverly Mountain
|
|
|
BGM failed again. No geotech report.
|
Routing PW Environmental | 12/28/2015 | | 12/28/2015 | | PASS |
Terry Alber
|
|
|
Floor drain SHALL be connected to site's existing flammable interceptor (shared with GT Service).
|
Routing - FIRE | 12/24/2015 | | 12/28/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to plans.
|
1st review completed | | | 12/28/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/18/2015 | | 12/24/2015 | | PASS |
Carl Westfall
|
|
|
Approved per attached plan review report
|
Routing - MECHANICAL | 12/18/2015 | | 12/18/2015 | | CANC |
Troy James
|
|
|
no mechanical to review
|
Routing - Erosion and Sediment | 12/17/2015 | | 12/18/2015 | | FAIL |
Evan Jenkins
|
|
|
Size of Project far exceeds allowence of ESC Waiver Request. Full Erosion and Sediment Control Narrative and Site Map required for Approval: Evan Jenkins 794.3958
|
Routing - PLANNING | 12/17/2015 | | 12/17/2015 | | PASS |
Andrea Tuning
|
|
|
Signed off on the plans
|
Routing - PUBLIC WORKS | 12/10/2015 | | 12/17/2015 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/3/2015 | | 12/17/2015 | | PASS |
Carl Westfall
|
|
|
sent on 12-3-15 to AHJ
|
Routing PW Drainage | 12/10/2015 | | 12/17/2015 | | FAIL |
Jennifer Bruner
|
|
|
needs geotech
|
Routing PW Drainage | 12/17/2015 | | 12/17/2015 | | FAIL |
Rachael Beierle
|
|
|
see BGM for details. 3752
|
Routing PW Sewer Rating | 12/17/2015 | | 12/17/2015 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | | | 12/17/2015 | | PASS |
Andrea Tuning
|
|
|
DRH15-00454
|
Routing - Addressing | 12/7/2015 | | 12/10/2015 | | PASS |
Laura Hunter
|
|
|
|
Routing - PLANNING Land Div | | | 12/7/2015 | | PASS |
Todd Tucker
|
|
|
|
Plan Reviewer's activity | | | 12/1/2015 | | PASS |
Carl Westfall
|
|
|
Plan intake approved
|
Plans ACCEPTED BY PLAN TECH | | | 12/1/2015 | | DONE |
|
|
|
|
Intake Approval | | | 12/1/2015 | | PASS |
|
|
|
as per Carl Westfall
|
Recd Pcfee & Taken To Pln CK | | | 12/1/2015 | | DONE |
|
|
|
|
Intake Approval | | | 11/30/2015 | | FAIL |
|
|
|
Storm water drainage, ESC, and extra Civil sheets
|
Application received | | | 11/27/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 27 2015 8:10AM
|