Telephone call | | | 3/28/2017 | | DONE |
|
|
|
Rita called about the final values-i told her to disregard the 2nd noitce since she sent the 1st notice back to us.
|
Second Notice | | 3/3/2017 | 3/9/2017 | | DONE |
|
|
|
|
First Notice | | 1/13/2017 | 2/21/2017 | | DONE |
|
|
|
Mailed 2-22-17
|
BLD-Final | 12/29/2016 | 1/3/2017 | 1/3/2017 | A | PASS |
Tony Young
|
|
|
Rita Phone #: ###-####
|
Permanent Occupancy | | | 1/3/2017 | | DONE |
|
|
|
|
BLD-Final | 12/28/2016 | 12/30/2016 | 12/29/2016 | P | DEFR |
Tony Young
|
|
|
Rita Phone #: ###-####
|
BLD-Conference | 11/30/2016 | 12/2/2016 | 12/2/2016 | A | PART |
Tony Young
|
|
|
Please call ahead for access - Rita Phone #: ###-####,, code ?s,, meet with plan review/// took plan reviewer out,, met owner and owners rep,, went over hardware,, handrails,, exit signs..
|
BLD-Conference | 11/29/2016 | 11/30/2016 | 11/30/2016 | P | PEND |
Tony Young
|
|
|
Please call ahead for access - Rita Phone #: ###-####,, code ?s,, meet with plan review
|
BLD-Conference | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | PEND |
Tony Young
|
|
|
Please call ahead for access - Rita Phone #: ###-####,, code ?s,, meet with plan review
|
BLD-Final | 11/25/2016 | 11/28/2016 | 11/28/2016 | P | PEND |
Tony Young
|
|
|
Please call ahead for access - Rita Phone #: ###-####,, code ?s,, hand rails,, landing,, signage,, hardware,, flush handle,, etc
|
FIRE-Final Inspection | 11/23/2016 | 11/25/2016 | 11/25/2016 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, final inspection for commercial hood fire suppression system complete,fire extinguishers are in place with current inspection tags. Noted that exterior doors are original doors with the house, two of the doors have double keyed deadbolts and one door has thumb-turn. Final life fire safety inspection passed/complete.
|
Zoning Approval | 9/28/2016 | 9/28/2016 | 9/28/2016 | | PASS |
Josh Wilson
|
|
|
|
BLD-Aging Inspection | 9/21/2016 | 9/21/2016 | 9/26/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 9/20/2016 | 9/20/2016 | 9/26/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Conference | 8/10/2016 | 8/11/2016 | 8/11/2016 | A | PASS |
Tony Young
|
|
|
Joe Phone #: ###-####,, stairs for mechanical room up stairs is not per code but meets equipment room access,, they will put a chain across the bottom of stairs
|
BLD-Final | 8/1/2016 | 8/2/2016 | 8/2/2016 | A | NR |
Dave Hannah
|
|
|
Perkins Phone #: ###-####
|
BLD-Conference | 7/26/2016 | 7/27/2016 | 7/27/2016 | P | PART |
Tony Young
|
|
|
Please call ahead for access - Joe Phone #: ###-####,, handrail ?s one handrail up to mechanical room ok
|
BLD-Energy code compliance | 5/6/2016 | 5/9/2016 | 5/9/2016 | A | PASS |
Tony Young
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 5/4/2016 | 5/5/2016 | 5/6/2016 | P | DONE |
Dave Hannah
|
|
|
would like call ahead; Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 5/5/2016 | 5/6/2016 | 5/6/2016 | A | PASS |
Dave Hannah
|
|
|
Joe Phone #: ###-####
|
Case Summary (BLD) | | | 4/29/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/29/2016 | | DONE |
|
|
|
|
BLD-Foundation | 4/19/2016 | 4/19/2016 | 4/19/2016 | P | PASS |
Dave Hannah
|
|
|
rebar; Joe Phone #: ###-####
|
BLD-Footing | 4/14/2016 | 4/15/2016 | 4/15/2016 | A | PART |
Jim Sly
|
|
|
Joe Phone #: ###-#### Footings at ADA ramp OK.
|
BLD-Framing/Rough-in | 4/13/2016 | 4/14/2016 | 4/14/2016 | A | PART |
Tony Young
|
|
|
Partial basement framing - Joe Phone #: ###-####,, basement ok to insulate pending trades
|
BLD-Framing/Rough-in | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | PART |
Tony Young
|
|
|
Joe Phone #: ###-####,, ok so far,, need trades
|
BLD-Conference | 3/29/2016 | 3/30/2016 | 3/30/2016 | P | PASS |
Tony Young
|
|
|
Joe Phone #: ###-####,, ?s on headroom on attic access for mechanical room,, ok is less,, but area is not habital,, ok,, stairs are better than a ladder for the mech units
|
Issue PAID IN FULL permit | | | 2/18/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/18/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 2/5/2016 | | |
|
|
|
|
Plan assigned to (CDM) | 12/14/2015 | 12/14/2015 | 2/5/2016 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing - MECHANICAL | 12/14/2015 | | 2/5/2016 | | PASS |
Troy James
|
|
|
OK per E-Plan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/5/2016 | | DONE |
Christina Prado
|
|
|
***All Met 2-17-16*** Need GC Form, Revised Certificate of Value & RP prior to permit issuance
|
Routing - PLAN CHECK | 1/21/2016 | | 2/5/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing PW Drainage | 1/21/2016 | | 1/26/2016 | | PASS |
Brian Murphy
|
|
|
Project approved- JCT
|
Routing - FIRE | 1/21/2016 | 1/21/2016 | 1/21/2016 | | PASS |
Scott Arellano
|
|
|
Revised report attached to plans
|
Routing - PUBLIC WORKS | 1/21/2016 | | 1/21/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 1/13/2016 | | 1/13/2016 | | PASS |
Brian Murphy
|
|
|
|
Route to Impact Fee Review | 1/9/2016 | 1/12/2016 | 1/12/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 1/9/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/14/2015 | | 1/9/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Solid Waste | 12/14/2015 | | 1/9/2016 | | PASS |
Megan Durrell
|
|
|
|
Routing PW Sewer Design | 12/14/2015 | | 12/24/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Drainage | 12/14/2015 | | 12/22/2015 | | FAIL |
Brian Murphy
|
|
|
needs geotech
|
Routing - FIRE | 12/14/2015 | 12/14/2015 | 12/17/2015 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing - Erosion and Sediment | 12/14/2015 | | 12/15/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(STURIALE PLACE) **GREEN TAG**SCOPE-OF-WORK INCLUDES BUT IS NOT LIMITED TO REMODEL & ADDITION OF A PREVIOUSLY RELOCATED EXISTING HISTORIC RESIDENCE. WORK SHALL CONSIST OF CONSTRUCTION OF A PARTIAL BASEMENT OF APPROXIMATELY 1,218 SQFT. AND A NEW STICK FRAME ADDITION OF APPROXIMATELY 659 SQFT. AND RENOVATION/ALTERATION/RESTORATION OF THE EXISTING RESIDENCE OF APPROXIMATELY ±1,350 SQFT. INTO NEW COMMERCIAL CAFE/COFFEE SHOP AND RETAIL SALES SPACE. CONSTRUCTION SHALL CONSIST OF WOOD FRAME STUD WALLS, VARIOUS FINISHES, ALL NEW MECHANICAL, PLUMBING AND ELECTRICAL SYSTEMS. NEWLY CONSTRUCTED SPACES WILL INCLUDE A.D.A. RESTROOMS, DINING AND SERVICE AREAS, COMMERCIAL KITCHEN AND FOOD STORAGE AREAS AND INSTALLATION OF VARIOUS FOOD SERVICE EQUIPMENT. DEMO SHALL INCLUDE REMOVAL OF EXISTING NON-STRUCTURAL WALLS AND FINISHES, NEW ROOFING OVER THE ENTIRE STRUCTURE, REMOVAL AND REPAIR/INSTALLATION OF EXISTING WINDOWS, INSULATION UPGRADES, VARIOUS STRUCTURAL UPGRADES. EXTERIOR/SITE IMPROVEMENTS INCLUDE GRADING & DRAINAGE, NEW PARKING, UTILITIES AND SERVICES, AND EXTENSIVE LANDSCAPING THROUGHOUT.
|
Routing - Design Review | 12/14/2015 | | 12/15/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLUMBING | 12/14/2015 | | 12/15/2015 | | PASS |
Daryl Spivey
|
|
|
1) trap and vent all waste connections
2) additional cross connection protection may be required
3) vent downstram of interceptor
|
Routing - Addressing | 12/14/2015 | | 12/14/2015 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/14/2015 | | 12/14/2015 | | PASS |
Rachael Beierle
|
|
|
|
Pending Assignment by TLW | 12/14/2015 | | 12/14/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing PW Environmental | 12/14/2015 | | 12/14/2015 | | PASS |
Rick Christenson
|
|
|
Exterior Grease Interceptor Shown.
|
Intake Approval | | | 12/9/2015 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 12/4/2015 | | PASS |
Carl Westfall
|
|
|
Plan intake review approved
|
Application received | | | 12/3/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 3 2015 12:08PM
|