Permit Information
Permit NumberBLD15-04328
StatusFinaled
Name JD DEVELOPMENT LLC
Site Address 1514 W FRANKLIN ST
Project Name 
Customer NumberDRH15-00464
ePlanReviewNo
Description
DRH15-00464; Permit for new 252 sq. ft. detached garage, 372 sq. ft. detached garage and major interior remodel of existing dwelling. The two small garages will be attached by open trellis. Dwelling remodel is to demolish interior walls and construct new to create kitchen/living/dining room, 1 bedroom, 1.5 bathrooms on first floor and entire second level as master suite with full bathroom and utility closet. Load bearing walls are to be replaces by beams per engineering. If new furnace or a/c is installed, a Manual J and S must be submitted to Boise City for approval. Separate electrical, plumbing, mechanical and erosion permits are required. All work is to be done according to approved plans, Engineering, Plan Review Report, as approved under Certificate of Appropriateness (DRH15-00464) and current local codes. //leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/19/20181/22/20181/22/2018APASS
DetailsDave Hannah
call before for access // Alycia Phone #: ###-####
DOC - Permit Finaled1/22/20181/22/20181/22/2018PPASS
DetailsDave Hannah
BLD-Final1/18/20181/19/20181/19/2018ACANC
DetailsTony Young
call before for access // Alycia Phone #: ###-####
BLD-Final10/25/201710/27/201711/2/2017APEND
DetailsTony Young
Call half hour before to meet // Alisha Phone #: ###-####
BLD-Final10/24/201710/25/201710/27/2017PPEND
DetailsTony Young
Call half hour before to meet // Alisha Phone #: ###-####
Zoning Approval10/27/201710/27/201710/27/2017 DONE
DetailsTed Vanegas
BLD-Final10/23/201710/24/201710/24/2017ADEFR
DetailsTony Young
Call half hour before to meet // Alisha Phone #: ###-####
BLD-Final10/18/201710/23/201710/23/2017PNR
DetailsTony Young
Call half hour before to meet // Alisha Phone #: ###-####,, needs hisorical,, handrail on stairs
BLD-Final9/13/20179/14/20179/15/2017PNR
DetailsDave Hannah
Jake Phone #: ###-#### needs zoning finals
Hold  8/16/2017 DONE
DetailsCarlos Velazquez
need contact info for owner-8/16/17 received parcel owners phone #
CHANGE STATUS TO (ISS)  8/16/2017 DONE
received contact info that was required when on hold
Meeting  10/12/2016 DONE
the general contractor Builder Brad Construction has submitted a letter stating that they are NOT performing the work at this site from this point on. letter is attached
BLD-Energy code compliance6/6/20166/6/20166/6/2016PPASS
DetailsTony Young
Jeff Phone #: ###-####,, fire blocking ok
BLD-Energy code compliance5/26/20165/27/20165/27/2016PPASS
DetailsTony Young
Insulation // Jeff Phone #: ###-####
BLD-Framing/Rough-in5/17/20165/17/20165/17/2016PPART
DetailsTony Young
Jake Phone #: ###-####,, house and garage ok,, house does not have stairs in yet,, ok to insulate
Routing - MECHANICAL4/11/2016 4/11/2016 PASS
DetailsTroy James
submitted manual j report
BLD-Conference3/30/20163/30/20163/30/2016PPART
DetailsTony Young
Builder to verify property lines for setback on garage.,, setbacks are ok,, contractor and neighbor dispute about fence being removed by contractor,, contractor will replace a portion today to close in back yard for security,, etc,, met with 2 policemen also,, survey of property will take place
BLD-Wall Bracing2/19/20162/19/20162/19/2016PPASS
DetailsTony Young
Brad Phone #: ###-####,, ok with fixes
CHANGE STATUS TO (ISS)  1/25/2016 DONE
BLD-Foundation12/18/201512/21/201512/21/2015APASS
DetailsDave Hannah
stem wall; Brad Phone #: ###-####
BLD-Footing12/17/201512/18/201512/18/2015PPART
DetailsTony Young
would like call ahead; Brad Phone #: ###-####
OVERRIDE  12/15/2015  
Telephone call  12/15/2015 DONE
Spoke with Jeff informing him that the permit is ready, the fee amount and need to know who the RP will be
Issue PAID IN FULL permit  12/15/2015 DONE
Plan assigned to (LEG) Tisha12/11/2015 12/15/2015 DONE
DetailsTisha Gallop
walk in received 12/11
Routing - PLAN CHECK12/11/2015 12/15/2015 PASS
DetailsTisha Gallop
Inspection Record Card- Bld  12/15/2015 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/15/2015 DONE
Permit Ready to Issue  12/15/2015 DONE
***all requirments met /CEV
Need RP
Routing - MECHANICAL12/10/2015 12/11/2015 PASS
DetailsTroy James
No mechanical shown. Redlined plans, stating that any new furnace or A/C installed during this remodel will be required to have a manual j and s submitted for compliance.
Routing - Design Review12/9/2015 12/10/2015 PASS
DetailsMatthew A Halitsky
Per DRH15-00464.
1st review completed  12/3/2015 DONE
DetailsTisha Gallop
Routing - PLAN CHECK12/3/2015 12/3/2015 FAIL
DetailsTisha Gallop
Application received 12/3/2015