Print Statement | | | 4/20/2017 | | DONE |
|
|
|
|
Print Statement | | | 1/25/2017 | | DONE |
|
|
|
|
Print Statement | | | 1/9/2017 | | DONE |
|
|
|
|
Third Notice | | 11/26/2016 | 12/13/2016 | | DONE |
|
|
|
|
Third Notice | | 10/15/2016 | 11/21/2016 | | DONE |
|
|
|
|
Second Notice | | 9/22/2016 | 10/10/2016 | | DONE |
|
|
|
mailed 10-11-16
|
First Notice | | 8/19/2016 | 9/12/2016 | | DONE |
|
|
|
Mailed 9-13-16
|
BLD-Final | 8/9/2016 | 8/9/2016 | 8/9/2016 | A | PASS |
Jim Storey
|
|
|
final ok
|
Permanent Occupancy | | | 8/9/2016 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/25/2016 | 7/26/2016 | 7/26/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The lack of floor slope in the fire pump room hasa been approved by Assistant Chief Ron Johnson
|
Temporary Occupancy | 7/26/2016 | 10/24/2016 | 7/26/2016 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 7/21/2016 | 7/22/2016 | 7/22/2016 | P | NR |
Jim Storey
|
|
|
Clint Phone #: ###-#### need fire life safety final-ok for temp c of o
|
FIRE-Final Inspection | 7/21/2016 | 7/22/2016 | 7/22/2016 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is approved for 30 days with Scott's permission. For a final I need the project related fire alarm permit finaled which includes re-submittals and a map, and I need the building plan modifications for the revised fire pump room to be approved and any corrections implemented.
|
BLD-Conference | 5/25/2016 | 5/26/2016 | 5/26/2016 | P | CANC |
Troy Cobbley
|
|
|
|
FIRE-Conference | 5/17/2016 | 5/17/2016 | 5/17/2016 | P | DONE |
Troy Cobbley
|
|
|
After dicussing lack of slope in the FIre Pump Room with Scott Arellano I spoke to the project superintendant about the floor slope issue and that there would be no final sign off on the life safety until the floor had been sloped as per previous discussions.
|
BLD-Wall Bracing | 5/13/2016 | 5/16/2016 | 5/16/2016 | A | PASS |
Jim Storey
|
|
|
Matt Phone #: ###-####
|
BLD-Foundation | 5/11/2016 | 5/12/2016 | 5/12/2016 | A | PASS |
Jim Storey
|
|
|
Matt-rebar pre pour slab on grade Phone #: ###-####
|
BLD-Concrete | 5/4/2016 | 5/5/2016 | 5/5/2016 | P | PASS |
Jim Storey
|
|
|
Matt Phone #: ###-####
|
BLD-Energy code compliance | 4/29/2016 | 4/29/2016 | 4/29/2016 | P | PASS |
Jim Storey
|
|
|
Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 4/26/2016 | 4/26/2016 | 4/26/2016 | P | PART |
Jim Storey
|
|
|
Matt Phone #: ###-#### ok to one side ada on mens room 12 push w/closer
|
BLD-Concrete | 4/21/2016 | 4/22/2016 | 4/22/2016 | A | PASS |
Jim Storey
|
|
|
Matt Phone #: ###-####
|
FIRE-Conference | 4/19/2016 | 4/19/2016 | 4/19/2016 | P | DONE |
Troy Cobbley
|
|
|
Met sprinkler contractor and project superintendant and discussed job progress and floor slope in the fire pump room.
|
FIRE-Conference | 4/12/2016 | 4/12/2016 | 4/12/2016 | A | DONE |
Troy Cobbley
|
|
|
I spoke to the project superintendant about the NFPA 20 requirements for pitched floors, floor drains, emergency lighting and ventilation.
|
BLD-Footing | 3/24/2016 | 3/24/2016 | 3/24/2016 | P | PART |
Jim Storey
|
|
|
Matt-would like as late as possible Phone #: ###-####slab on grade
|
BLD-Other | 3/16/2016 | 3/17/2016 | 3/17/2016 | A | PASS |
Jim Storey
|
|
|
fire rated panelling // matt Phone #: ###-#### pannels listing pass
|
BLD-Foundation | 2/25/2016 | 2/25/2016 | 2/25/2016 | P | PASS |
Jim Storey
|
|
|
Matt-pre-slab on grade Phone #: ###-####
|
Print Occupancy Form | | | 2/5/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/5/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 1/22/2016 | | |
|
|
|
|
1st review completed | | | 1/22/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/22/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/22/2016 | | DONE |
Christina Prado
|
|
|
***only need ACHD- all others have been met***Need ACHD, RP, GC form & Revised certificate of vlaue for issuance
|
Routing - PLAN CHECK | 1/15/2016 | | 1/22/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 12/14/2015 | | 1/22/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Route to Impact Fee Review | 1/12/2016 | 1/15/2016 | 1/19/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 1/15/2016 | 1/15/2016 | 1/19/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Plan resubmittals received | | | 1/14/2016 | | DONE |
|
|
|
|
1st review completed | | | 1/12/2016 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 12/14/2015 | | 1/12/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 12/14/2015 | | 1/12/2016 | | FAIL |
Tim L. Woodard
|
|
|
Changemarks found in E-Plan Review. TLW
|
Routing - PLANNING Land Div | 12/14/2015 | | 1/12/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved in E-Plan Review. TLW
|
Routing PW Environmental | 12/15/2015 | | 12/28/2015 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Sewer Design | 12/15/2015 | | 12/24/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLUMBING | 12/14/2015 | | 12/18/2015 | | PASS |
Daryl Spivey
|
|
|
ASSE 1070 mixing valves required at the public lavs
|
Routing - FIRE | 12/14/2015 | 12/14/2015 | 12/16/2015 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect
|
Routing - PUBLIC WORKS | 12/14/2015 | | 12/15/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 12/14/2015 | | 12/15/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
**Project Management-Ron Hill** (ALBERTSON'S HANGAR) Permit for a new 17,800 square foot aviation aircraft hangar with support and office spaces.
|
Routing PW Sewer Rating | 12/15/2015 | | 12/15/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Drainage | 12/15/2015 | | 12/15/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 12/15/2015 | | 12/15/2015 | | PASS |
Mike D Hedge
|
|
|
No new street ighting required.
|
Routing - Design Review | 12/14/2015 | | 12/15/2015 | | PASS |
Sarah Schafer
|
|
|
No Design Review required. Project is not in a Design Review overlay.
|
Intake Approval | | | 12/14/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 12/14/2015 | | 12/14/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Addressing | 12/14/2015 | | 12/14/2015 | | PASS |
Laura Hunter
|
|
|
|
Application received | | | 12/7/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 7 2015 9:47AM
|