Case Summary (BLD) | | | 6/20/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/20/2016 | | DONE |
|
|
|
|
BLD-Final | 4/14/2016 | 4/14/2016 | 4/14/2016 | P | PASS |
Jim Sly
|
|
|
Tom Phone #: ###-####
|
DOC - Permit Finaled | 4/14/2016 | 4/14/2016 | 4/14/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 2/29/2016 | 3/1/2016 | 3/1/2016 | P | PASS |
Mike Jordan
|
|
|
Insulation // Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 2/26/2016 | 2/26/2016 | 2/26/2016 | P | FAIL |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Provide additional straps to all beam to column connections (both sides) Strap double top plate at drryer duct. Complete fireblocking behind shower upstairs. No acces to approvrd plans. Columns for patio cover in rear?
|
BLD-Wall Bracing | 2/16/2016 | 2/16/2016 | 2/16/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Wall cover | 2/12/2016 | 2/16/2016 | 2/16/2016 | A | FAIL |
Mike Jordan
|
|
|
shear // Zane Phone #: ###-####. Missed nailing on sill on south wall and at south west corner.
|
BLD-Wall Bracing | 2/11/2016 | 2/11/2016 | 2/11/2016 | P | NR |
Mike Jordan
|
|
|
Zayne Phone #: ###-####
|
BLD-Foundation | 1/21/2016 | 1/21/2016 | 1/21/2016 | P | PASS |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 1/14/2016 | 1/15/2016 | 1/15/2016 | A | PASS |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
OVERRIDE | | | 12/29/2015 | | |
|
|
|
|
Plan assigned to (BJM) | 12/10/2015 | 12/10/2015 | 12/29/2015 | | DONE |
Brian McGowan
|
|
|
due 12/23 ePlan (LOMR)
Manual J failed, waiting for it to be approved
|
Issue PAID IN FULL permit | | | 12/29/2015 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 12/29/2015 | | DONE |
Christina Prado
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/29/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/29/2015 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Routing - MECHANICAL | 12/24/2015 | | 12/24/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 12/22/2015 | | 12/22/2015 | | PASS |
Tisha Gallop
|
|
|
per BJM
|
1st review completed | | | 12/21/2015 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 12/9/2015 | | 12/21/2015 | | PASS |
Brian McGowan
|
|
|
Still need Mechanical to approve
|
Routing PW Flood Plain | 12/9/2015 | | 12/21/2015 | | PASS |
Jim Wyllie
|
|
|
Property out of Floodplain as per Letter of Map Revision.
Jim Wyllie / ###-####
|
Routing - PLANNING | 12/9/2015 | | 12/21/2015 | | PASS |
Todd Tucker
|
|
|
|
Routing - MECHANICAL | 12/9/2015 | | 12/11/2015 | | FAIL |
Troy James
|
|
|
Emailed Integrity. Builder uploaded the wrong manual j
|
Plan assigned to (LEG) Tisha | 12/9/2015 | | 12/10/2015 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 12/9/2015 | | 12/10/2015 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 12/9/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/9/2015 | | DONE |
|
|
|
|
Routing - Addressing | 12/9/2015 | | 12/9/2015 | | PASS |
Laura Hunter
|
|
|
|
Application received | | | 12/7/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 7 2015 6:13PM
|