Permit Information
Permit NumberBLD15-04356
StatusFinaled
Name JAYO CONSTRUCTION INC
Site Address 423 W SAND DUNE LN
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A; Permit for the construction of a new 2,349 sq. ft., two story (first floor 1,706 sq. ft., second floor 643 sq. ft.) single family dwelling with 3 bedrooms, 3 and a half bathrooms, approximately 270 sq. ft. of covered patio/porch and a 795 sq. ft. attached garage per the approved plans, engineering, ResCheck, and any notations. R-1B zoning and setbacks per planning.//leg *** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference7/6/20167/7/20167/7/2016PDONE
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Final7/7/20167/7/20167/7/2016PPASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by SHANE JAYO
DOC - Permit Finaled7/7/20167/7/20167/7/2016PPASS
DetailsPhil Shearer
PubWorks Occupancy Approval7/7/20167/7/20167/7/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance5/3/20165/4/20165/4/2016PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Wall Bracing4/29/20165/2/20165/2/2016ANR
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by SHANE JAYO
Nail above straps marked with white.
BLD-Framing/Rough-in4/28/20164/29/20164/29/2016PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, need to finish correction notice,, ok to insulate
BLD-Framing/Rough-in4/26/20164/26/20164/26/2016PFAIL
DetailsTony Young
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, c/n posted
BLD-Framing/Rough-in4/22/20164/22/20164/22/2016PCANC
DetailsJim Storey
Cancel per Jodie with Jayo Phone #: ###-#### >> Inspection requested via web by SHANE JAYO
BLD-Other4/18/20164/19/20164/19/2016APASS
DetailsMike Jordan
Soffits Phone #: ###-#### Inspection requested via web by SHANE JAYO
BLD-Foundation2/11/20162/12/20162/12/2016PPART
DetailsTony Young
Derek Phone #: ###-####,, work in progress
BLD-Footing2/11/20162/11/20162/11/2016PPART
DetailsTony Young
Derek Phone #: ###-####,, work in progress
PubWorks Subgrade Approval2/11/20162/11/20162/11/2016 DONE
DetailsJason C. Taylor
**Footings only***
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.

BLD-Other2/9/20162/9/20162/9/2016PDEFR
DetailsTony Young
Need a ESC site pre-construction inspection. Phone #: ###-#### Inspection requested via web by SHANE JAYO,, defr to esc
Issue PAID IN FULL permit  2/8/2016 DONE
Inspection Record Card- Bld  2/8/2016 DONE
OVERRIDE  1/5/2016  
Inspection Record Card- Bld  1/5/2016 DONE
Telephone call  1/5/2016 DONE
Left a message for Shane informing him the permit is ready to be picked up and the fee amount that is due
Plan assigned to (LEG) Tisha12/8/2015 1/5/2016 DONE
DetailsTisha Gallop
1st review 12/23; L2 hillside
Plan resubmittals received  1/5/2016 DONE
received es report for spray foam via e-mail
Routing - PLAN CHECK1/5/2016 1/5/2016 PASS
DetailsTisha Gallop
verified with 455 30' defensible space not required for this lot
Case Summary (BLD)  1/5/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/5/2016 DONE
Permit Ready to Issue  1/5/2016 DONE
requirements met
Routing - PLAN CHECK12/21/2015 12/23/2015 FAIL
DetailsTisha Gallop
e-mailed Shane Jayo, need details for roof venting
1st review completed  12/23/2015 FAIL
DetailsTisha Gallop
pending building
Routing - Erosion and Sediment12/14/2015 12/21/2015 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)

Permit for the construction of a new 2,349 sq. ft., two story (first floor 1,706 sq. ft., second floor 643 sq. ft.) single family dwelling with 3 bedrooms, 3 and a half bathrooms, approximately @#$! sq. ft. of covered patio/porch and a 745 sq. ft. attached garage
Routing - FIRE12/18/2015 12/18/2015 PASS
DetailsKatie Marron
Plans reviewed for fire department vehicle access and hydrant accessibility. No comments required.
Routing - MECHANICAL12/11/2015 12/14/2015 PASS
DetailsTroy James
Routing PW Grading-Hillside12/9/2015 12/11/2015 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PUBLIC WORKS12/11/2015 12/11/2015 PASS
DetailsRachael Beierle
Routing - PLANNING12/11/2015 12/11/2015 PASS
DetailsSusan Riggs
Routing - Addressing12/8/2015 12/9/2015 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS12/8/2015 12/9/2015 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  12/8/2015 DONE
Intake Approval  12/8/2015 PASS
Recd Pcfee & Taken To Pln CK  12/8/2015 DONE
Application received 12/8/2015