BLD-Conference | 7/6/2016 | 7/7/2016 | 7/7/2016 | P | DONE |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Final | 7/7/2016 | 7/7/2016 | 7/7/2016 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
DOC - Permit Finaled | 7/7/2016 | 7/7/2016 | 7/7/2016 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 7/7/2016 | 7/7/2016 | 7/7/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 5/3/2016 | 5/4/2016 | 5/4/2016 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Wall Bracing | 4/29/2016 | 5/2/2016 | 5/2/2016 | A | NR |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO Nail above straps marked with white.
|
BLD-Framing/Rough-in | 4/28/2016 | 4/29/2016 | 4/29/2016 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, need to finish correction notice,, ok to insulate
|
BLD-Framing/Rough-in | 4/26/2016 | 4/26/2016 | 4/26/2016 | P | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO,, c/n posted
|
BLD-Framing/Rough-in | 4/22/2016 | 4/22/2016 | 4/22/2016 | P | CANC |
Jim Storey
|
|
|
Cancel per Jodie with Jayo Phone #: ###-#### >> Inspection requested via web by SHANE JAYO
|
BLD-Other | 4/18/2016 | 4/19/2016 | 4/19/2016 | A | PASS |
Mike Jordan
|
|
|
Soffits Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Foundation | 2/11/2016 | 2/12/2016 | 2/12/2016 | P | PART |
Tony Young
|
|
|
Derek Phone #: ###-####,, work in progress
|
BLD-Footing | 2/11/2016 | 2/11/2016 | 2/11/2016 | P | PART |
Tony Young
|
|
|
Derek Phone #: ###-####,, work in progress
|
PubWorks Subgrade Approval | 2/11/2016 | 2/11/2016 | 2/11/2016 | | DONE |
Jason C. Taylor
|
|
|
**Footings only***
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Other | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | DEFR |
Tony Young
|
|
|
Need a ESC site pre-construction inspection. Phone #: ###-#### Inspection requested via web by SHANE JAYO,, defr to esc
|
Issue PAID IN FULL permit | | | 2/8/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/8/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 1/5/2016 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/5/2016 | | DONE |
|
|
|
|
Telephone call | | | 1/5/2016 | | DONE |
|
|
|
Left a message for Shane informing him the permit is ready to be picked up and the fee amount that is due
|
Plan assigned to (LEG) Tisha | 12/8/2015 | | 1/5/2016 | | DONE |
Tisha Gallop
|
|
|
1st review 12/23; L2 hillside
|
Plan resubmittals received | | | 1/5/2016 | | DONE |
|
|
|
received es report for spray foam via e-mail
|
Routing - PLAN CHECK | 1/5/2016 | | 1/5/2016 | | PASS |
Tisha Gallop
|
|
|
verified with 455 30' defensible space not required for this lot
|
Case Summary (BLD) | | | 1/5/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/5/2016 | | DONE |
|
|
|
requirements met
|
Routing - PLAN CHECK | 12/21/2015 | | 12/23/2015 | | FAIL |
Tisha Gallop
|
|
|
e-mailed Shane Jayo, need details for roof venting
|
1st review completed | | | 12/23/2015 | | FAIL |
Tisha Gallop
|
|
|
pending building
|
Routing - Erosion and Sediment | 12/14/2015 | | 12/21/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 2,349 sq. ft., two story (first floor 1,706 sq. ft., second floor 643 sq. ft.) single family dwelling with 3 bedrooms, 3 and a half bathrooms, approximately @#$! sq. ft. of covered patio/porch and a 745 sq. ft. attached garage
|
Routing - FIRE | 12/18/2015 | | 12/18/2015 | | PASS |
Katie Marron
|
|
|
Plans reviewed for fire department vehicle access and hydrant accessibility. No comments required.
|
Routing - MECHANICAL | 12/11/2015 | | 12/14/2015 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 12/9/2015 | | 12/11/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 12/11/2015 | | 12/11/2015 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | 12/11/2015 | | 12/11/2015 | | PASS |
Susan Riggs
|
|
|
|
Routing - Addressing | 12/8/2015 | | 12/9/2015 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/8/2015 | | 12/9/2015 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/8/2015 | | DONE |
|
|
|
|
Intake Approval | | | 12/8/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/8/2015 | | DONE |
|
|
|
|
Application received | | 12/8/2015 | | | |
|
|
|
|