BLD-Blower Door Test Results | 10/18/2016 | 10/19/2016 | 10/19/2016 | A | PASS |
Tony Young
|
|
|
Justin Phone #: ###-####,, 5.06
|
BLD-Final | 10/17/2016 | 10/18/2016 | 10/18/2016 | P | PASS |
Tony Young
|
|
|
Justin Phone #: ###-####,, c of o issued
|
DOC - Permit Finaled | 10/18/2016 | 10/18/2016 | 10/18/2016 | P | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 8/12/2016 | 8/12/2016 | 8/15/2016 | | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | PASS |
Tony Young
|
|
|
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 3/28/2016 | 3/29/2016 | 3/29/2016 | P | PASS |
Tony Young
|
|
|
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 3/21/2016 | 3/23/2016 | 3/23/2016 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by SHANE JAYO
|
BLD-Framing/Rough-in | 3/16/2016 | 3/22/2016 | 3/21/2016 | P | CANC |
Tony Young
|
|
|
Shayne - ###-#### (office) Phone #: ###-#### Inspection cancelled from web by: SHANE JAYO
|
BLD-Wall cover | 3/7/2016 | 3/7/2016 | 3/7/2016 | P | PASS |
Tony Young
|
|
|
Shear // Justin or office ###-#### Phone #: ###-####
|
BLD-Foundation | 1/22/2016 | 1/25/2016 | 1/25/2016 | P | DONE |
Tony Young
|
|
|
Bill-wall Phone #: ###-####
|
BLD-Footing | 1/22/2016 | 1/25/2016 | 1/25/2016 | A | PASS |
Tony Young
|
|
|
Bill-wall Phone #: ###-####
|
PubWorks Subgrade Approval | 1/25/2016 | 1/25/2016 | 1/25/2016 | | DONE |
Jason C. Taylor
|
|
|
Subgrade Reinspection required due to soft material under foundation elements.
A second letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 1/22/2016 | 1/22/2016 | 1/22/2016 | P | NR |
Tony Young
|
|
|
Bill-wall Phone #: ###-####
|
BLD-Footing | 1/21/2016 | 1/22/2016 | 1/22/2016 | A | NR |
Tony Young
|
|
|
Bill Phone #: ###-####,, need soils pass
|
BLD-Footing | 1/20/2016 | 1/21/2016 | 1/21/2016 | P | NR |
Tony Young
|
|
|
Bill Phone #: ###-####,, need soils 1st
|
Issue PAID IN FULL permit | | | 1/19/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 1/13/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 12/10/2015 | 12/10/2015 | 1/13/2016 | | DONE |
Brian McGowan
|
|
|
due 12/29 L2 hillside. Failed, needed to update a building section showing it would have room for insulation.
|
Plan resubmittals received | | | 1/13/2016 | | DONE |
|
|
|
received 3 copies of sheet 10- gave to Brian
|
Routing - PLAN CHECK | 1/13/2016 | | 1/13/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 1/13/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/13/2016 | | DONE |
|
|
|
All Met
|
Inspection Record Card- Bld | | | 1/13/2016 | | DONE |
|
|
|
|
Telephone call | | | 1/13/2016 | | DONE |
|
|
|
called Justin- left message with secretary that permit is ready and fees due
|
Routing - PLAN CHECK | 12/16/2015 | | 12/29/2015 | | FAIL |
Brian McGowan
|
|
|
Changes to section required. Plans are being delivered.
|
1st review completed | | | 12/29/2015 | | FAIL |
Brian McGowan
|
|
|
Changes to section required. Plans are being delivered.
|
Routing - FIRE | 12/15/2015 | | 12/16/2015 | | PASS |
Scott Arellano
|
|
|
No comments.
|
Routing - Erosion and Sediment | 12/15/2015 | | 12/15/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required prior to Earth Disturbance)
Permit for the construction of a new 2,420 sq. ft., two story (first floor 1,593 sq. ft., second floor 827 sq. ft.) single family dwelling with 3 bedrooms, 2 and a half bathrooms, approximately @#$! sq. ft. of covered patio/porch and a 624 sq. ft. attached garage
|
Routing - MECHANICAL | 12/11/2015 | | 12/15/2015 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 12/9/2015 | | 12/11/2015 | | PASS |
Jason C. Taylor
|
|
|
**NO HILLSIDE REQUIREMENTS ***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing - PLANNING | 12/11/2015 | | 12/11/2015 | | PASS |
Susan Riggs
|
|
|
|
Routing - PUBLIC WORKS | 12/11/2015 | | 12/11/2015 | | PASS |
Rachael Beierle
|
|
|
|
Plan assigned to (LEG) Tisha | 12/8/2015 | | 12/10/2015 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - Addressing | 12/8/2015 | | 12/9/2015 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/8/2015 | | 12/9/2015 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/8/2015 | | DONE |
|
|
|
|
Intake Approval | | | 12/8/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/8/2015 | | DONE |
|
|
|
|
Application received | | 12/8/2015 | | | |
|
|
|
|