BLD-Aging Inspection | 2/1/2019 | 2/1/2019 | 2/8/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 9/19/2018 | 9/19/2018 | 9/20/2018 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 9/18/2018 | 9/18/2018 | 9/20/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 5/4/2018 | 5/4/2018 | 5/7/2018 | P | PASS |
Brandon Shaw
|
|
|
Corner of garage
|
BLD-Footing | 4/5/2018 | 4/6/2018 | 4/6/2018 | P | PASS |
Tony Young
|
|
|
Requests late afternoon, Mark Phone #: ###-####,, front garage cut back area ok
|
BLD-Aging Inspection | 7/8/2016 | 7/8/2016 | 7/8/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 7/7/2016 | 7/7/2016 | 7/8/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 2/24/2016 | 2/24/2016 | 2/24/2016 | P | PART |
Tony Young
|
|
|
Mark Phone #: ###-####,, wall bracing ok
|
BLD-Foundation | 1/19/2016 | 1/21/2016 | 1/21/2016 | A | PART |
Tony Young
|
|
|
John Phone #: ###-####
|
BLD-Footing | 1/19/2016 | 1/19/2016 | 1/19/2016 | P | PASS |
Tony Young
|
|
|
John Phone #: ###-####
|
OVERRIDE | | | 1/8/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 1/8/2016 | 1/8/2016 | 1/8/2016 | A | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 1/8/2016 | | 1/8/2016 | | PASS |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 1/8/2016 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 1/8/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/8/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/8/2016 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 1/5/2016 | 1/5/2016 | 1/5/2016 | P | FAIL |
Tisha Gallop
|
|
|
need structural calculation packet and need roof slope min 1/4:12 or provide documentation product approved for 1/8:12
|
Routing Walk-In (Zoning) | 12/29/2015 | 12/29/2015 | 12/29/2015 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 12/29/2015 | 12/29/2015 | 12/29/2015 | A | FAIL |
Brian McGowan
|
|
|
Need tall wall engineering for proposed garage, more information on proposed roofing, plans for clipping existing garage wall to meet access to back yard, Verification end truss on existing garage will allow a 48" reduction in bearing.
|
Routing - PLAN CHECK | 12/29/2015 | | 12/29/2015 | | FAIL |
Brian McGowan
|
|
|
Need tall wall engineering for proposed garage, more information on proposed roofing, plans for clipping existing garage wall to meet access to back yard, Verification end truss on existing garage will allow a 48" reduction in bearing.
|
Routing Walk-In (Zoning) | 12/11/2015 | 12/11/2015 | 12/17/2015 | A | DONE |
Carlos Velazquez
|
|
|
Over 1000 sq. ft. needs a Zoning Certificate
|
1st review completed | | | 12/10/2015 | | FAIL |
Brian McGowan
|
|
|
Need tall wall engineering for proposed garage, more information on proposed roofing, plans for clipping existing garage wall to meet access to back yard, Verification end truss on existing garage will allow a 48" reduction in bearing.
|
Application received | | 12/10/2015 | | | |
|
|
|
|