BLD-Aging Inspection | 11/4/2016 | 11/4/2016 | 11/4/2016 | | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 11/4/2016 | 11/4/2016 | 11/4/2016 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 6/21/2016 | 6/21/2016 | 6/23/2016 | P | PASS |
Phil Shearer
|
|
|
Joe Phone #: ###-####
|
FIRE-Final Inspection | 6/21/2016 | 6/21/2016 | 6/21/2016 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguisher is in place with current inspection tag. Final life fire safety inspection passed/complete.
|
CHANGE STATUS TO (ISS) | | | 6/21/2016 | | |
|
|
|
|
(F) Reprint permit | | | 6/21/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 3/24/2016 | | |
|
|
|
|
Plan assigned to (TLW) | 2/26/2016 | | 3/24/2016 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/24/2016 | | DONE |
|
|
|
PLEASE DO NOT RE ISSUE
|
Routing - PLAN CHECK | | | 3/11/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 3/11/2016 | | 3/11/2016 | | PASS |
Daryl Spivey
|
|
|
per plans and ISPC
|
Routing - PUBLIC WORKS | 3/11/2016 | | 3/11/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Plan Modification Accepted | | | 2/26/2016 | | DONE |
|
|
|
Modification to change from two pump / filter system down to a single pump / filter system. TLW
|
BLD-Foundation | 2/16/2016 | 2/17/2016 | 2/17/2016 | A | PASS |
Phil Shearer
|
|
|
Rebar // Joe Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/9/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/9/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 1/6/2016 | | |
|
|
|
|
Routing PW Drainage | 12/17/2015 | | 1/6/2016 | | PASS |
Brian Murphy
|
|
|
OK PER JASON TAYLOR PART OF SUB
|
1st review completed | | | 1/6/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/6/2016 | | DONE |
Christina Prado
|
|
|
Need RP, GC Form & Revised certificate of value for issuance
|
Plan assigned to (TLW) | 12/17/2015 | | 1/6/2016 | | PASS |
Tim L. Woodard
|
|
|
Level 3 TI - ePlanReview - Barber Valley Swimming Pool
|
Routing - Design Review | 12/17/2015 | | 12/22/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLAN CHECK | 12/17/2015 | | 12/18/2015 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 12/17/2015 | | 12/18/2015 | | PASS |
Bill VanDegrift
|
|
|
|
Plan assigned to (AJS) | 12/17/2015 | 12/17/2015 | 12/17/2015 | | DEFR |
Adele J Schaffeld-Griffin
|
|
|
Reassigned to Tim Woodard. Level 3 TI - ePlanReview - Barber Valley Swimming Pool
|
Routing - FIRE | 12/17/2015 | 12/17/2015 | 12/17/2015 | | PASS |
Scott Arellano
|
|
|
Pool House/Club House reviewed under BLD15-02358. Plans reviewed for HMIS. Pool chemicals to be stored on site are 4 gallons each of Chlorine and Muriatic acid; well below limits allowed in IFC 5003.1.1. No report attached.
|
Pending Assignment by JCB | 12/17/2015 | | 12/17/2015 | | DONE |
Jason Blais
|
|
|
|
Routing - Addressing | 12/17/2015 | | 12/17/2015 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/17/2015 | | 12/17/2015 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 12/17/2015 | | 12/17/2015 | | PASS |
Evan Jenkins
|
|
|
(BARBER VALLEY SWIMMING POOL) This is a limited use in-ground shotcrete swimming pool for the use by the Barber Valley Townhome residences. Work to include... Clubhouse being done under separate permit of BLD15-02358.
|
Intake Approval | | | 12/15/2015 | | PASS |
Jason Blais
|
|
|
|
Application received | | | 12/10/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 10 2015 4:48PM
|
First Notice | 11/4/2016 | 11/4/2016 | | | |
Phil Shearer
|
|
|
|