Third Notice | | 1/16/2017 | 2/13/2017 | | DONE |
Christina Prado
|
|
|
Mailed 2/13/17, with letter
|
Third Notice | | 12/18/2016 | 1/11/2017 | | DONE |
|
|
|
sent with a letter
|
Third Notice | | 11/26/2016 | 12/13/2016 | | DONE |
|
|
|
|
Third Notice | | 10/15/2016 | 11/21/2016 | | DONE |
|
|
|
|
Second Notice | | 9/23/2016 | 10/10/2016 | | DONE |
|
|
|
mailed 10-11-16
|
First Notice | | 8/29/2016 | 9/13/2016 | | DONE |
Candy A. Nichols
|
|
|
|
Permanent Occupancy | | | 8/19/2016 | | DONE |
|
|
|
|
BLD-Final | 8/18/2016 | 8/18/2016 | 8/18/2016 | P | PASS |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
Zoning Approval | 8/18/2016 | 8/18/2016 | 8/18/2016 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 8/16/2016 | 8/17/2016 | 8/17/2016 | A | NR |
Jim Sly
|
|
|
Dave Phone #: ###-#### Need Zoning Final.
|
FIRE-Final Inspection | 8/15/2016 | 8/16/2016 | 8/16/2016 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Aging Inspection | 8/5/2016 | 8/5/2016 | 8/8/2016 | | PEND |
Jim Sly
|
|
|
WIP
|
BLD-Foundation | 3/24/2016 | 3/24/2016 | 3/24/2016 | P | PASS |
Jim Sly
|
|
|
rebar; Dave Phone #: ###-####
|
BLD-Wall Bracing | 2/11/2016 | 2/12/2016 | 2/12/2016 | P | PASS |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
BLD-Framing/Rough-in | 2/11/2016 | 2/12/2016 | 2/12/2016 | P | PASS |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/11/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/11/2016 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 12/11/2015 | 12/11/2015 | 2/10/2016 | | PASS |
Carl Westfall
|
|
|
(1st done) SOCKEYE (Jan 21 - 30 days) (Dec 31 - 15 days)
|
Routing Off Site - STRUCTURAL | 2/3/2016 | | 2/10/2016 | | PASS |
Carl Westfall
|
|
|
(2-3-16) Routed response to Chris Merrill via Email.
(2-10-16) Structural approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/10/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/10/2016 | | DONE |
|
|
|
***ALL REQUIREMENTS MET 2-11-16 /CEV
need GC and rev cert of val-please remind customer that they will need to call the inspections for P&Z and PW
|
Print Occupancy Form | | | 2/10/2016 | | DONE |
|
|
|
|
Telephone call | | | 2/10/2016 | | DONE |
|
|
|
Spoke with Bill informing him the permit is ready and we would need a GC Form and Revised Cert of Value filled out by the GC for issuance.
|
Routing - PLAN CHECK | 2/2/2016 | | 2/4/2016 | | PASS |
Carl Westfall
|
|
|
(2-4-16) Completed the IBC plan review. Waiting for the Consultant Structural Engineer to finish his 3rd review.
(2-10-16) Consultant Structural Engineer approved drawings.
|
Plan resubmittals received | | | 2/2/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/29/2016 | | 2/2/2016 | | PEND |
Carl Westfall
|
|
|
|
Routing - PUBLIC WORKS | 1/22/2016 | | 1/29/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Sewer Rating | 1/22/2016 | | 1/29/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PUBLIC WORKS | 1/28/2016 | | 1/29/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 1/25/2016 | | 1/28/2016 | | PASS |
Jason C. Taylor
|
|
|
No review required as all draiange has been accounted for with previous construction approved under ODI 3050. Jason Taylor ###-####
|
Routing Off Site - STRUCTURAL | 1/15/2016 | | 1/27/2016 | | FAIL |
Carl Westfall
|
|
|
Chris Merrill with Stapley
|
Plan resubmittals requested | | | 1/27/2016 | | DONE |
|
|
|
Consultant Structural Engineer's review sent to Bill Matter
|
Plan resubmittals received | | | 1/26/2016 | | DONE |
|
|
|
Three copies of sheets SD1, A1.0, A2.0, and A3.0 taken to Carl W
|
Routing - PLAN CHECK | 1/15/2016 | | 1/22/2016 | | FAIL |
Carl Westfall
|
|
|
Did not resolve the issues noted in the 1st review. Called and talked to the Architect. He said he would revise and resubmit.
|
Telephone call | | | 1/15/2016 | | DONE |
|
|
|
called Network Global- they're picking up plans Tuesday for outside engineering to go to Stapleys per Carl Westfall
|
Routing - PLAN CHECK | 1/11/2016 | | 1/15/2016 | | DONE |
Carl Westfall
|
|
|
Waiting for resubmittals
|
Plan resubmittals received | | | 1/15/2016 | | DONE |
Christina Prado
|
|
|
Received three copies of Structural response letter, revised structural calcs and four sets of plan sheets marked SD1 & A1.0; Plans stamped and taken back to CJW for further review
|
Route to Impact Fee Review | 1/11/2016 | 1/14/2016 | 1/12/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 1/7/2016 | | 1/11/2016 | | PASS |
Scott Arellano
|
|
|
Comments attached to plans
|
1st review completed | | | 1/11/2016 | | FAIL |
|
|
|
Failed Plan Check, Structural and Public Works/Sewer.
|
Routing - PLAN CHECK | 12/21/2015 | | 1/7/2016 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required. Plan review report Emailed to Architect.
|
Routing Off Site - STRUCTURAL | 12/11/2015 | | 12/29/2015 | | FAIL |
Carl Westfall
|
|
|
Stapley - Chris Merrill
Copy of Consultant Structural Engineer's Plan Review Report was forwarded to Bill Matter on December 30, 2015.
|
Routing PW Environmental | 12/15/2015 | | 12/23/2015 | | PASS |
Rick Christenson
|
|
|
Valve in tank area approved for diversion from storm water to sanitary sewer.
|
Routing - Erosion and Sediment | 12/18/2015 | | 12/21/2015 | | PASS |
Evan Jenkins
|
|
|
Sockeye Brewery boiler room
Reference ESC14-00678 for Coverage
|
Routing - PLUMBING | | | 12/21/2015 | | PASS |
Daryl Spivey
|
|
|
additional cross connection protection may be required
|
Routing - MECHANICAL | 12/21/2015 | | 12/21/2015 | | PASS |
Troy James
|
|
|
Field verify equipment installed per manufacturer
|
Routing - PLANNING | 12/16/2015 | | 12/17/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing - Design Review | 12/16/2015 | | 12/17/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing PW Sewer Rating | 12/15/2015 | | 12/16/2015 | | FAIL |
Beverly Mountain
|
|
|
Contacting owner for new brewing consumptions
|
Routing - PUBLIC WORKS | 12/15/2015 | | 12/16/2015 | | FAIL |
Jennifer Bruner
|
|
|
Please see Sewer Rating.
|
Routing - Addressing | 12/11/2015 | | 12/14/2015 | | PASS |
Laura Hunter
|
|
|
|
Routing - PLANNING Land Div | 12/14/2015 | | 12/14/2015 | | PASS |
Dave Abo
|
|
|
Parcel C of ROS 9994
|
Intake Approval | | | 12/11/2015 | | PASS |
Javier Guzman
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/11/2015 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/11/2015 | | DONE |
|
|
|
|
Application received | | 12/11/2015 | | | |
|
|
|
|