BLD-Final | 9/2/2016 | 9/6/2016 | 9/6/2016 | A | PASS |
Phil Shearer
|
|
|
Give me about 30 minutes notice Phil so I can get us in. Phone #: ###-#### Inspection requested via web by bryan murdoch
|
DOC - Permit Finaled | 9/6/2016 | 9/6/2016 | 9/6/2016 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 8/22/2016 | 8/22/2016 | 8/22/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | CANC |
Phil Shearer
|
|
|
I understand we are not passed on hillside Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Energy code compliance | 4/15/2016 | 4/15/2016 | 4/15/2016 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 4/15/2016 | 4/15/2016 | 4/15/2016 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 4/12/2016 | 4/13/2016 | 4/13/2016 | A | PART |
Phil Shearer
|
|
|
Inspection requested via web by bryan murdoch. Truss bracing, Trusses over back patio missing holddown clips.
|
BLD-Framing/Rough-in | 4/12/2016 | 4/12/2016 | 4/12/2016 | P | NR |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch. NO mechanical rough in inspectoin
|
BLD-Wall Bracing | 4/11/2016 | 4/11/2016 | 4/11/2016 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Foundation | 2/9/2016 | 2/10/2016 | 2/10/2016 | P | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
BLD-Footing | 2/1/2016 | 2/2/2016 | 2/2/2016 | P | PEND |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
PubWorks Subgrade Approval | 1/28/2016 | 1/28/2016 | 1/28/2016 | | DONE |
Jason C. Taylor
|
|
|
***entire building foundation***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 1/19/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 1/6/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 12/23/2015 | 12/23/2015 | 1/6/2016 | | DONE |
David Ferguson
|
|
|
due 1/8 L2 hillside -Need 2 structural sheets stamped by engineer and call-outs for columns for covered patio/porch
|
Routing - PLAN CHECK | 12/29/2015 | | 1/6/2016 | | PASS |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 12/21/2015 | | 1/6/2016 | | PASS |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 1/6/2016 | | DONE |
|
|
|
|
Telephone call | | | 1/6/2016 | | DONE |
|
|
|
called Doug- left message that permit is ready for pick up and fees due
|
Case Summary (BLD) | | | 1/6/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/6/2016 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 1/6/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 1/6/2016 | | DONE |
|
|
|
All Met
|
Plan resubmittals received | | | 1/4/2016 | | DONE |
|
|
|
Received (2) sets of; calculations, wall sections, and foundation
|
1st review completed | | | 12/31/2015 | | FAIL |
David Ferguson
|
|
|
Need 2 structural sheets stamped by engineer and call-outs for columns for covered patio/porch
|
Routing - FIRE | 12/28/2015 | 12/18/2015 | 12/29/2015 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing - Erosion and Sediment | 12/28/2015 | | 12/28/2015 | | PASS |
Andy J. Long
|
|
|
ESC plan and SWPPP narrative submitted and approved. Valid PD and RP designated. Site preparation inspection is required, call ###-####
|
Routing - MECHANICAL | 12/21/2015 | | 12/28/2015 | | PASS |
Troy James
|
|
|
|
Plan assigned to (LEG) Tisha | 12/18/2015 | | 12/23/2015 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 12/21/2015 | | 12/21/2015 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Grading-Hillside | 12/18/2015 | | 12/21/2015 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLANNING | | | 12/21/2015 | | PASS |
|
|
|
CFH15-00064
|
Routing - Addressing | 12/18/2015 | | 12/18/2015 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/18/2015 | | DONE |
|
|
|
|
Intake Approval | | | 12/18/2015 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 12/18/2015 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/18/2015 | | DONE |
|
|
|
|
Routing PW Sewer Rating | 12/18/2015 | | 12/18/2015 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | 12/17/2015 | | | |
|
|
|
|