Permit Information
Permit NumberBLD15-04468
StatusFinaled
Name ESI
Site Address 850 W FRONT ST
Project NameBoise Centre Walkway
Customer Number 
ePlanReviewYes
Description
**Project Management-Ron Hill** (BOISE CENTRE LOBBY EXPANSION, TERRACE, PEDESTRIAN WALKWAY, AND CONCOURSE) (DRH15-00462) (1-13-17 PLAN MODIFICATION TO INCORPORATE INTO THE APPROVED DRAWINGS VARIOUS STRUCTURAL SKETCHES THAT HAVE BEEN ISSUED DURING CONSTRUCTION AS A RESULT OF REQUESTS FOR INFORMATION [RFI].) Fire sprinkler systems used for high-rise and for occupancy. To expand a portion of the existing Boise Centre Convention building by constructing a 2nd story to create a vertical circulation route to a new elevated pedestrian walkway and enclosed elevated concourse that will connect the Boise Centre Convention building to the City Center Plaza building (3,603 square feet total). The floor of the new elevated circulation route will be located about 24 feet above grade, at the perimeter of The Grove. The concourse will be part of the Century Link Arena building. A terrace will also be constructed at the Boise Centre Convention building adjacent to The Grove. Work is to include an elevator, an escalator, two egress stairways, exterior walls, interior doors, and finishes. Structural work includes micro piles, helical piers, concrete footings, concrete foundations, steel columns, steel beams, a moment frame, a horizontal truss, steel pan deck and concrete floors, masonry walls, etc. Special Inspection is required for fabricators, steel, welding, concrete, masonry, soils, cast-in-place deep foundations (micro piles), helical piers, epoxy anchors, other post installed concrete anchors, seismic resistance, bolting, and spray-applied fire resistant materials. Post tensioned concrete slabs are required to be scanned to locate rebar, including tendons, before any holes are drilled. No rebar, including tendons, are allowed to be cut. Structural observations by the Structural Engineer of Record will be provided as noted on the drawings. The stairway design is a deferred submittal item. Property easements are required to allow construction within CCDC property. The work is required to comply with the approved drawings, with the plan review report, with the structural design, with the approved code alternates, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/8/201711/8/201711/8/2017PPASS
DetailsDave Hannah
Corey Phone #: ###-####
FIRE-Final Inspection11/8/201711/8/201711/8/2017APASS
DetailsJim Page
Fire alarm panel integration complete for link, final life fire safety inspection passed/complete.
Zoning Approval11/8/201711/8/201711/8/2017 DONE
DetailsAndrea Tuning
Permanent Occupancy  11/8/2017 DONE
Telephone call  11/6/2017 DONE
called Robin to let know the Temp C of O expires on 11/11/17-left message on her extension-also emailed Joe Jackson
BLD-Aging Inspection9/25/20179/25/201710/2/2017 PEND
DetailsDave Hannah
Temporary Occupancy8/18/201711/16/20178/18/2017 DONE
DetailsCandy A. Nichols
Jason Blais ok'd extension of the temp c of o for 90 days from 8/13/17
Telephone call  8/15/2017 DONE
called Robin to let know temp c of o was expired-she will get GC to either call in final or request an extension today
Telephone call  8/7/2017 DONE
called Robin-left message that the temp c of o will expire on 8/13/17-gave her Jason B email info for the request to extend if it's needed
Temporary Occupancy7/17/201710/15/20177/17/2017 DONE
DetailsCandy A. Nichols
Jason B ok'd ext good for 45 days from 6-29-17
BLD-Final7/6/20177/10/20177/11/2017PPART
DetailsDave Hannah
Adam Phone #: ###-#### ok for perm after all other work and trades are finaled
FIRE-Final Inspection7/6/20177/10/20177/10/2017APART
DetailsJim Page
Life fire safety inspection complete with exception to the communication between fire panels with the link, TCO extension approved for 30 days in regards to life fire safey per conversation with Scott Arellano.
Telephone call  7/10/2017 DONE
Called Robing about the Temp C of O that's expired-left message on her phone
Telephone call  7/6/2017 DONE
called Robin to let know the temp c opf o is expired but they still have time to request an extension if needed-left message on her phone
BLD-Aging Inspection6/19/20176/19/20176/20/2017 PEND
DetailsDave Hannah
BLD-Final3/30/20173/30/20173/31/2017APART
DetailsDave Hannah
Final walk am attempt. Call Adam. Phone #: ###-#### Inspection requested via web by Adam Johnson ok for T.C.O.
Temporary Occupancy3/31/20176/29/20173/31/2017 DONE
DetailsCarlos Velazquez
Zoning Approval Temp3/31/20173/31/20173/31/2017 DONE
DetailsAndrea Tuning
FIRE-Final Inspection3/29/20173/30/20173/30/2017APART
DetailsJim Page
Partial life fire safety inspection complete for TCO requested area's (GBAD link, Century Link, Boise Center, escalator lobby levels 1 and 2, elevated concourse between Boise Center and west stairwell) Fire sprinklers are complete for TCO area, fire alarms are complete for TCO area, fire extinguishers are in place with current inspection tags.
BLD-Final3/27/20173/29/20173/29/2017PCANC
DetailsDave Hannah
PM walk to review status. Call Adam before heading to site. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
FIRE-Final Inspection3/27/20173/29/20173/29/2017PCANC
DetailsJim Page
Scheduled for 8AM on 30MAR2017
BLD-Conference3/27/20173/28/20173/29/2017PPASS
DetailsDave Hannah
PM walk to review status. Call Adam before heading to site. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/27/20173/27/20173/27/2017PCANC
DetailsMike Jordan
PM walk to review status. Call Adam before heading to site. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/20/20173/24/20173/27/2017PPART
DetailsDave Hannah
Conference walk to review any items. Call in advance. Thanks AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson ext fire walls above fir doors
Print Occupancy Form  3/27/2017 DONE
FIRE-Conference3/23/20173/23/20173/23/2017PDONE
DetailsJim Page
Fire conference complete
FIRE-Conference3/22/20173/23/20173/23/2017ACANC
DetailsJim Page
BLD-Conference3/20/20173/22/20173/23/2017PPASS
DetailsDave Hannah
Conference walk to review any items. Call in advance. Thanks AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
FIRE-Conference3/22/20173/22/20173/22/2017PCANC
DetailsJim Page
Conference rescheduled for 23MAR2017
BLD-Ceiling Grid Inspection3/20/20173/21/20173/21/2017PCANC
DetailsDave Hannah
Ceiling grid inspection after MEP sign offs. Call when on site.. Thanks AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/20/20173/20/20173/20/2017PPASS
DetailsDave Hannah
Conference walk to review any items. Call in advance. Thanks AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/16/20173/17/20173/17/2017PPASS
DetailsDave Hannah
Friday walk to review status. Call Adam When on site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/16/20173/16/20173/16/2017PPASS
DetailsDave Hannah
Meet to discuss 1 side cover at Boise Centre West. Call Adam When on site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson ok to one side rads wall ground level
BLD-Conference3/14/20173/14/20173/15/2017PPASS
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference3/10/20173/10/20173/11/2017ADONE
DetailsDave Hannah
Walk with Adam call when on site Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in3/3/20173/3/20173/6/2017PPASS
DetailsDave Hannah
Stair 2 rated assemblies. Call Adam. thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in2/28/20173/1/20173/2/2017APASS
DetailsDave Hannah
Framing Inspection for cover of Stairs 1 and 2, concourse. Call Adam when on site. Thanks. akj. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Ceiling Grid Inspection2/23/20172/24/20172/24/2017PDONE
DetailsDave Hannah
Request inspection of Above Grid work at escalator ceiling. Need to flood tiles in this area before the work platform is removed. Please call Adam when on site. AKJ ###-#### Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Ceiling Grid Inspection2/23/20172/24/20172/24/2017APASS
DetailsDave Hannah
Request inspection of Above Grid work at escalator ceiling. Need to flood tiles in this area before the work platform is removed. Please call Adam when on site. AKJ ###-#### Phone #: ###-#### Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference2/19/20172/21/20172/21/2017APASS
DetailsMike Jordan
Inspection of framing at concourse. Call Adam when on site. Thx akj Phone #: ###-#### Inspection requested via web by Adam Johnson. Remaining framing at concourse ok to cover. Also verified insulation at "diving board".
BLD-Conference2/17/20172/17/20172/17/2017PCANC
DetailsJim Sly
Adam Phone #: ###-####
Contr. cancelled.
BLD-Conference2/16/20172/16/20172/16/2017PPART
DetailsDave Hannah
Meet to walk with Mike and Adam. Call when on site. ###-####. thanks akj Phone #: ###-#### Inspection requested via web by Adam Johnson ok to cover cieling ground level
BLD-Conference2/13/20172/13/20172/14/2017PPASS
DetailsDave Hannah
Walk with Hannah and look fireproofing above escalators. Call Adam when on site. ###-####. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in2/8/20172/9/20172/9/2017PPART
DetailsDave Hannah
Review framing. Walk with Adam and Koci. Call when on site, ###-####. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson . Part framing on second floor top of escalator soffits ok but need to spray fire proofing
BLD-Framing/Rough-in1/27/20171/27/20171/27/2017APASS
DetailsDave Hannah
Ongoing Framing inspection walk, weeks recap. Call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
CHANGE STATUS TO (ISS)  1/24/2017 DONE
DetailsChristina Prado
BLD-Framing/Rough-in1/17/20171/18/20171/20/2017APART
DetailsDave Hannah
Adam Phone #: ###-#### roof and soffit on elevated walk way west end ok
BLD-Framing/Rough-in1/13/20171/13/20171/13/2017PFAIL
DetailsDave Hannah
Adam Phone #: ###-#### soffit framing not per plan
OVERRIDE  1/13/2017  
Plan assigned to (CJW)1/9/20171/9/20171/13/2017 PASS
DetailsCarl Westfall
plan mod
Routing - PLAN CHECK1/11/2017 1/13/2017 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  1/13/2017 DONE
Permit Ready to Issue  1/13/2017 DONE
DetailsChristina Prado
DO NOT RE-ISSUE - All requirements met for Plan Mod

Must pay all fees prior to changing status to ISS
Routing Off Site - STRUCTURAL1/11/2017 1/11/2017 PASS
DetailsCarl Westfall
Plan Modification Accepted  1/9/2017 DONE
DetailsChristina Prado
Plan Mod for various structural updates as part of RFI responses
BLD-Framing/Rough-in12/21/201612/22/201612/28/2016PPASS
DetailsDave Hannah
PM walk with Hannah to review SS Framing at Boise Centre. Please call Adam prior to site visit to coordinate location, etc. Thanks. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Footing9/12/20169/13/20169/27/2016PPASS
DetailsDave Hannah
Footing inspection, multiple areas. Contact Ron when on site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson also using mti for spec inspection and conc testing
Plan Reviewer's activity  8/9/2016 DONE
--Fire Protection Note:--

I told Tom Easton at Shilo Automatic Sprinkler, Inc. it was ok to demo the piping in what will be the new lobby area of the existing convention center after I receive a quick permit. However, the existing piping adjoining the new lobby is to be reconnected temporarily to the existing fire protection. This will keep as much of the existing fire protection system in service as possible. I told him I was not necessarily interested in maintaining or verifying the existing pipe size for the temorarily reconnected branch line piping.

____________

I also advised Tom that the doors on each side of the pedestrian walkway is required to be wetted on both sides per IBC. We discussed window sprinklers or a water curtain.
Issue PAID IN FULL permit  7/27/2016 DONE
Print Occupancy Form  7/27/2016 DONE
OVERRIDE  7/26/2016  
Plan assigned to (CJW)12/31/201512/31/20157/26/2016 PASS
DetailsCarl Westfall
(1st done) BOISE CENTRE LOBBY EXPANSION, WALKWAY, ETC. (Feb 9 - 30 days) Level 3 TI - ePlanReview
Telephone call  7/26/2016 DONE
Sent an email, see documents, to Jamie, informing him that this permit is 40 days past its expiration date, looks like review took a bit longer, and recommended that he send in a request for an extension if the GC isn't ready to pick the permit up.
Routing - PLAN CHECK7/1/2016 7/26/2016 PASS
DetailsCarl Westfall
The issue of electricity being provided to a portion of one building through another building will be resolved by signage.
PLANS/APPL TAKEN TO FRONT DESK  7/26/2016 DONE
Permit Ready to Issue  7/26/2016 DONE
***MET 7-27-16**** Need ACHD (NEW BUILDING), GC Form, Revised Cert of Value and RP
Routing - Erosion and Sediment7/19/2016 7/19/2016 PASS
DetailsAndy J. Long
ESC plan waiver approved.
Plan Reviewer's activity  7/12/2016 PEND
Waiting for a determination by Fire and Electrical about supplying electricity to a portion of a building through another building and whether signage will sufficiently mitigate the risk.
Routing Off Site - STRUCTURAL6/28/2016 7/12/2016 PASS
DetailsCarl Westfall
Jared Bauder (CH2MHill)
Routing - Erosion and Sediment7/11/2016 7/11/2016 PASS
DetailsEvan Jenkins
**Project Management-Ron Hill** (BOISE CENTRE LOBBY EXPANSION, TERRACE, PEDESTRIAN WALKWAY, AND CONCOURSE) (DRH15-00462) Fire sprinkler systems used for high-rise and for occupancy. To expand a portion of the existing Boise Centre Convention building by constructing a 2nd story to create a vertical circulation route to a new elevated pedestrian walkway and enclosed elevated concourse that will connect the Boise Centre Convention building to the City Center Plaza building (3,603 square feet total). The floor of the new elevated circulation route will be located about 24 feet above grade, at the perimeter of The Grove. The concourse will be part of the Century Link Arena building. A terrace will also be constructed at the Boise Centre Convention building adjacent to The Grove.
Plan Reviewer's activity  7/8/2016 DONE
Received an Email from Andrew Owens about the electrical to one building being provided through another building. Forwarded the Email to Scott Arellano and Daryl DeGrange asking for their determination.
Routing - Erosion and Sediment6/28/2016 7/6/2016 FAIL
DetailsAndy J. Long
No ESC plan waiver document or ESC plan submitted. Level 3 TI requires ESC plan. See previous review notes.
Routing - PLAN CHECK6/28/2016 7/1/2016 FAIL
DetailsCarl Westfall
The issue of supplying electrical power to a building through another building has not been resolved.
Plan resubmittals received  6/28/2016 DONE
The workflow in ePlanReview broke. Christina Prado started a new workflow and routed the drawings to various agencies. CJW
Route to Impact Fee Review2/9/20162/12/20162/10/2016 PASS
DetailsCindy M. Gould
Plan resubmittals requested  2/9/2016 DONE
1st review completed  2/9/2016 DONE
Routing - PLAN CHECK12/31/2015 2/9/2016 FAIL
DetailsCarl Westfall
1st review completed
Routing Off Site - STRUCTURAL12/31/2015 1/13/2016 FAIL
DetailsCarl Westfall
Jared Bauder (CH2MHill)
Routing - FIRE12/31/201512/31/20151/6/2016 PASS
DetailsKatie Marron
Comments attached to case.
Routing - Erosion and Sediment12/31/2015 1/6/2016 FAIL
DetailsAndy J. Long
ESC plan waiver required due to major TI and associated staging areas for construction. Contractor will need to designate valid RP
Routing PW Drainage12/31/2015 1/5/2016 PASS
DetailsBrian Murphy
Routing - PLANNING Land Div12/31/2015 1/4/2016 PASS
DetailsDave Abo
Elevated walkway goes over several parcels with different owners - will need easements granting construction.
Routing - Addressing12/31/2015 12/31/2015 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS12/31/2015 12/31/2015 PASS
DetailsRachael Beierle
Pending Assignment by JCB12/31/2015 12/31/2015 DONE
DetailsJason Blais
Routing - PLUMBING12/31/2015 12/31/2015 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Design Review12/31/2015 12/31/2015 PASS
DetailsJosh Wilson
ok per DRH15-00462
Intake Approval  12/30/2015 PASS
DetailsJason Blais
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.
Intake Approval  12/22/2015 FAIL
DetailsAdele J Schaffeld-Griffin
Please completed and upload the 502 check list. Please upload all of the additional documents listed on the check list.
Application received  12/18/2015 DONE
Application submitted via PDS Online on Dec 18 2015 12:15PM