Print Statement | | | 9/26/2016 | | DONE |
|
|
|
|
Third Notice | | 6/20/2016 | 7/11/2016 | | DONE |
|
|
|
|
Second Notice | | 5/21/2016 | 6/15/2016 | | DONE |
|
|
|
|
First Notice | | 4/16/2016 | 5/11/2016 | | DONE |
|
|
|
Mailed 5-12-16
|
BLD-Final | 4/5/2016 | 4/5/2016 | 4/6/2016 | P | PASS |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
BLD-Final | 4/5/2016 | 4/6/2016 | 4/6/2016 | P | PASS |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
Permanent Occupancy | | | 4/6/2016 | | DONE |
|
|
|
|
Zoning Approval | 4/5/2016 | 4/5/2016 | 4/5/2016 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 3/31/2016 | 4/1/2016 | 4/1/2016 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarm, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
|
BLD-Ceiling Grid Inspection | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | PASS |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
BLD-Framing/Rough-in | 3/14/2016 | 3/15/2016 | 3/15/2016 | P | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-#### ok after plumbing is finaled
|
BLD-Framing/Rough-in | 3/10/2016 | 3/11/2016 | 3/11/2016 | P | PART |
Dave Hannah
|
|
|
Thade Phone #: ###-#### ext ok to cover
|
BLD-Framing/Rough-in | 3/3/2016 | 3/4/2016 | 3/7/2016 | P | PASS |
Dave Hannah
|
|
|
Exterior partial cover - Brad Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/16/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/16/2016 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/14/2016 | 1/17/2016 | 1/19/2016 | | PASS |
Cindy M. Gould
|
|
|
|
OVERRIDE | | | 1/15/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 1/15/2016 | | DONE |
Christina Prado
|
|
|
****received RP and rev cert of val but still need the GC*****-still need Need RP, GC form & Revised certificate of value for issuance
|
Plan assigned to (CDM) | 12/24/2015 | 12/24/2015 | 1/14/2016 | | PASS |
Carl D Madsen
|
|
|
First review completed Level 3 TI - ePlanReview - Jacksons Store #125 Remodel
|
1st review completed | | | 1/14/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/14/2016 | | DONE |
|
|
|
|
Routing PW Environmental | 12/24/2015 | | 1/13/2016 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Sewer Design | 12/24/2015 | | 1/13/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLAN CHECK | 12/24/2015 | | 1/12/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing PW Drainage | 1/11/2016 | | 1/11/2016 | | PASS |
Brian Murphy
|
|
|
less than 10000 no plan required
|
Routing PW Street Lights | 12/24/2015 | | 1/4/2016 | | PASS |
Mike D Hedge
|
|
|
No new street lighting required.
|
Routing - Design Review | 12/24/2015 | | 12/30/2015 | | PASS |
Josh Wilson
|
|
|
ok per DRH15-00460
|
Routing - FIRE | 12/24/2015 | 12/24/2015 | 12/29/2015 | | PASS |
Scott Arellano
|
|
|
Comments attached to case.
|
Routing - Erosion and Sediment | 12/24/2015 | | 12/28/2015 | | PASS |
Andy J. Long
|
|
|
ESC site map and SWPPP narrative submitted and approved. Site preparation inspection required, call ###-####.
|
Routing PW Drainage | 12/24/2015 | | 12/28/2015 | | FAIL |
Brian Murphy
|
|
|
|
Routing - Addressing | 12/24/2015 | | 12/28/2015 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/24/2015 | | 12/24/2015 | | PASS |
Rachael Beierle
|
|
|
|
Pending Assignment by JCB | 12/24/2015 | | 12/24/2015 | | DONE |
Jason Blais
|
|
|
|
Routing - PLUMBING | 12/24/2015 | | 12/24/2015 | | PASS |
Bill VanDegrift
|
|
|
1) additional cross connection protection may be required
2) asse 1070 mixing valve required at the public lavs
|
Intake Approval | | | 12/23/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Carl Madsen and plan review fees paid.
|
Application received | | | 12/21/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 21 2015 10:04AM
|