Second Notice | | 8/21/2016 | 8/16/2016 | | DONE |
|
|
|
This permit finaled on the web by Kevin Slazas
|
First Notice | | 7/23/2016 | 8/11/2016 | | DONE |
|
|
|
Mailed 8-11-16
|
BLD-Final | 7/12/2016 | 7/13/2016 | 7/13/2016 | A | PASS |
Dave Hannah
|
|
|
Larry Phone #: ###-####
|
FIRE-Final Inspection | 7/12/2016 | 7/13/2016 | 7/13/2016 | A | PASS |
Jim Page
|
|
|
Previously noted issue with fire sprinklers repaired, fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers in common area's with current inspection tags. Final life fire safety inspection passed/complete.
|
Print Occupancy Form | | | 7/13/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/13/2016 | | DONE |
|
|
|
|
BLD-Final | 7/5/2016 | 7/7/2016 | 7/8/2016 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### ok for temp occ
|
FIRE-Final Inspection | 7/6/2016 | 7/7/2016 | 7/7/2016 | A | PART |
Jim Page
|
|
|
Fire sprinkler inspection is complete (Cabinet that was installed after the sprinkler inspection is to close to the fire sprinkler, cabinet will need to be altered to clear 18 inches below deflector or fire sprinkler head will need to be relocated), fire alarm inspection is complete, fire extinguishers are in place with current inspection tags. Partial life fire safety inspection complete excluding the fire sprinkler head above cabinet which will be inspected when complete
|
BLD-Ceiling Grid Inspection | 6/7/2016 | 6/7/2016 | 6/7/2016 | P | PASS |
Dave Hannah
|
|
|
Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 5/19/2016 | 5/20/2016 | 5/20/2016 | A | PASS |
Bob Archibald
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Landvatter. Interior nonbearing walls at west entrance approved for cover.
|
BLD-Framing/Rough-in | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | PASS |
Dave Hannah
|
|
|
construction door by Utility Billing entrance. lock code is 1512. Phone #: ###-#### Inspection requested via web by Todd Landvatter walls only
|
Plan assigned to (AJS) | 3/23/2016 | 3/23/2016 | 3/24/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
review completed plan mod
|
Routing - PLAN CHECK | 3/24/2016 | | 3/24/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 3/24/2016 | | 3/24/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/24/2016 | | DONE |
|
|
|
all requirments met
|
CHANGE STATUS TO (ISS) | | | 3/24/2016 | | DONE |
|
|
|
as per Adele Schaffeld-Griffin; no fees due for plan mod
|
Plan Modification Accepted | | | 3/23/2016 | | DONE |
Christina Prado
|
|
|
Plan Mod requested to modifiy the west side floor plan to add conference type rooms with multiple access points
|
Issue & PRINT to be Invoiced | | | 2/12/2016 | | |
|
|
|
|
Print Occupancy Form | | | 2/12/2016 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 12/24/2015 | 12/24/2015 | 12/29/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Level 2 TI - ePlanReview - Boise City Hall Utility Billing 1st Floor
|
Routing - PLAN CHECK | 12/24/2015 | | 12/29/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 12/29/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/29/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/29/2015 | | DONE |
Christina Prado
|
|
|
Need GC form & Revised certificate of value for issuance
|
Routing - FIRE | 12/24/2015 | 12/24/2015 | 12/24/2015 | | PASS |
Scott Arellano
|
|
|
Comments attached to case.
|
Intake Approval | | | 12/24/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Javier Guzman and plan review fees paid.
|
Pending Assignment by JCB | 12/24/2015 | | 12/24/2015 | | DONE |
Jason Blais
|
|
|
|
Application received | | | 12/21/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 21 2015 12:47PM
|