Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-04479
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 150 N CAPITOL BLVD
Project NameBoise City Hall
Customer Number 
ePlanReviewYes
Description
(BOISE CITY HALL)(UTILITY BILLING)(BLDG 2 - FIRST FLOOR)PLAN MODIFICATION TO ADD 2 OFFICES ADD SQUARE FOOTAGE (NOW 2744 SQ FT) AND 28 OCCUPANTS. **3/24/16 AJS** Tenant Improvement at portion of 1st floor (2,471 sq ft) changing from assembly conference room to a new open office space including removal of existing walls, doors, ceiling, and lighting and the addition of new doors, windows, and minor nonbearing walls. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 8/21/20168/16/2016 DONE
This permit finaled on the web by Kevin Slazas
First Notice 7/23/20168/11/2016 DONE
Mailed 8-11-16
BLD-Final7/12/20167/13/20167/13/2016APASS
DetailsDave Hannah
Larry Phone #: ###-####
FIRE-Final Inspection7/12/20167/13/20167/13/2016APASS
DetailsJim Page
Previously noted issue with fire sprinklers repaired, fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers in common area's with current inspection tags. Final life fire safety inspection passed/complete.
Print Occupancy Form  7/13/2016 DONE
Permanent Occupancy  7/13/2016 DONE
BLD-Final7/5/20167/7/20167/8/2016PPART
DetailsDave Hannah
Phone #: ###-#### ok for temp occ
FIRE-Final Inspection7/6/20167/7/20167/7/2016APART
DetailsJim Page
Fire sprinkler inspection is complete (Cabinet that was installed after the sprinkler inspection is to close to the fire sprinkler, cabinet will need to be altered to clear 18 inches below deflector or fire sprinkler head will need to be relocated), fire alarm inspection is complete, fire extinguishers are in place with current inspection tags. Partial life fire safety inspection complete excluding the fire sprinkler head above cabinet which will be inspected when complete
BLD-Ceiling Grid Inspection6/7/20166/7/20166/7/2016PPASS
DetailsDave Hannah
Kevin Phone #: ###-####
BLD-Framing/Rough-in5/19/20165/20/20165/20/2016APASS
DetailsBob Archibald
Phone #: ###-#### Inspection requested via web by Todd Landvatter. Interior nonbearing walls at west entrance approved for cover.
BLD-Framing/Rough-in3/29/20163/30/20163/30/2016APASS
DetailsDave Hannah
construction door by Utility Billing entrance. lock code is 1512. Phone #: ###-#### Inspection requested via web by Todd Landvatter walls only
Plan assigned to (AJS)3/23/20163/23/20163/24/2016 PASS
DetailsAdele J Schaffeld-Griffin
review completed plan mod
Routing - PLAN CHECK3/24/2016 3/24/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK3/24/2016 3/24/2016 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  3/24/2016 DONE
Permit Ready to Issue  3/24/2016 DONE
all requirments met
CHANGE STATUS TO (ISS)  3/24/2016 DONE
as per Adele Schaffeld-Griffin; no fees due for plan mod
Plan Modification Accepted  3/23/2016 DONE
DetailsChristina Prado
Plan Mod requested to modifiy the west side floor plan to add conference type rooms with multiple access points
Issue & PRINT to be Invoiced  2/12/2016  
Print Occupancy Form  2/12/2016 DONE
Plan assigned to (AJS)12/24/201512/24/201512/29/2015 PASS
DetailsAdele J Schaffeld-Griffin
Level 2 TI - ePlanReview - Boise City Hall Utility Billing 1st Floor
Routing - PLAN CHECK12/24/2015 12/29/2015 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  12/29/2015 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  12/29/2015 DONE
Permit Ready to Issue  12/29/2015 DONE
DetailsChristina Prado
Need GC form & Revised certificate of value for issuance
Routing - FIRE12/24/201512/24/201512/24/2015 PASS
DetailsScott Arellano
Comments attached to case.
Intake Approval  12/24/2015 PASS
DetailsJason Blais
Prescreen approved by Javier Guzman and plan review fees paid.
Pending Assignment by JCB12/24/2015 12/24/2015 DONE
DetailsJason Blais
Application received  12/21/2015 DONE
Application submitted via PDS Online on Dec 21 2015 12:47PM