DOC - Permit Finaled | | | 7/26/2018 | | DONE |
|
|
|
Scope of work completed under BLD16-01059
|
Zoning Approval | 6/28/2018 | 6/28/2018 | 6/28/2018 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Ceiling Grid Inspection | 11/21/2017 | 11/21/2017 | 11/21/2017 | P | PART |
Brandon Shaw
|
|
|
levels 2 and 3 corridor ceilings.
|
BLD-Concrete | 4/25/2017 | 4/25/2017 | 4/25/2017 | P | PEND |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Michael West WIP.
|
BLD-Framing/Rough-in | 2/28/2017 | 2/28/2017 | 2/28/2017 | A | CANC |
Jim Sly
|
|
|
Pre-rock at bathtubs for units 501-510 and 401-410. Phone #: ###-#### Inspection requested via web by Michael West Canc. by Contr.
|
BLD-Foundation | 1/26/2017 | 1/27/2017 | 1/27/2017 | A | PEND |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Michael West. Non load bearing masonry screen wall, ok pending special inspection. Work in progress.
|
BLD-Concrete | 10/4/2016 | 10/4/2016 | 10/4/2016 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Concrete | 9/15/2016 | 9/16/2016 | 9/16/2016 | P | PASS |
Phil Shearer
|
|
|
PT Deck Phone #: ###-#### Inspection requested via web by Michael West. 1st half
|
BLD-Concrete | 8/2/2016 | 8/3/2016 | 8/3/2016 | P | PEND |
Phil Shearer
|
|
|
Building SOG and concrete walls Phone #: ###-#### Inspection requested via web by Michael West. Pending MTI inspection
|
BLD-Concrete | 7/28/2016 | 7/29/2016 | 7/29/2016 | A | PEND |
Phil Shearer
|
|
|
building slab on grade Phone #: ###-#### Inspection requested via web by Michael West. Pending MTI inspection
|
BLD-Foundation | 7/18/2016 | 7/19/2016 | 7/19/2016 | P | PASS |
Phil Shearer
|
|
|
columns and foundation walls Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Foundation | 7/13/2016 | 7/15/2016 | 7/15/2016 | A | PEND |
Phil Shearer
|
|
|
foundation walls and columns. Concrete is scheduled for 9:45 am. Phone #: ###-#### Inspection requested via web by Michael West. Pending MTI inspection
|
BLD-Foundation | 7/8/2016 | 7/11/2016 | 7/11/2016 | A | PASS |
Phil Shearer
|
|
|
Columns and walls Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Foundation | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | CANC |
Phil Shearer
|
|
|
Columns Special inspection is scheduled for 10:00 am. Inspection requested via web by Michael West
|
BLD-Foundation | 7/6/2016 | 7/6/2016 | 7/6/2016 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Footing | 6/29/2016 | 6/30/2016 | 6/30/2016 | P | PASS |
Phil Shearer
|
|
|
Balance of building footings Phone #: ###-#### Inspection requested via web by Michael West
|
BLD-Footing | 6/22/2016 | 6/24/2016 | 6/24/2016 | P | PEND |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Michael West. Pending MTI inspection
|
BLD-Conference | 6/22/2016 | 6/23/2016 | 6/23/2016 | A | DONE |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Michael West
|
Issue PAID IN FULL permit | | | 5/23/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/23/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/11/2016 | | DONE |
Christina Prado
|
|
|
All requirements met 5/18/16
Still need ACHD & RP as of 5/10/16 ///C_P
need ACHD, RP, GC & rev cert of val
|
Routing Off Site - STRUCTURAL | 3/21/2016 | | 4/1/2016 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/1/2016 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 1/8/2016 | | 4/1/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 3/21/2016 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/9/2016 | | 3/11/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Flood Plain | 3/9/2016 | | 3/11/2016 | | PASS |
Jim Wyllie
|
|
|
Approved in E-Plan Review. TLW
|
Routing - PLAN CHECK | 3/9/2016 | | 3/11/2016 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 3/9/2016 | | 3/10/2016 | | PASS |
Daryl Spivey
|
|
|
Approved in E-Plan. TLW
|
Routing PW Drainage | 3/9/2016 | | 3/10/2016 | | PASS |
Jim Wyllie
|
|
|
Approved in E-Plan Review. TLW
|
Plan resubmittals received | | | 3/9/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Route to Impact Fee Review | 2/9/2016 | 2/12/2016 | 2/10/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PUBLIC WORKS | 1/8/2016 | | 2/9/2016 | | PASS |
Jennifer Bruner
|
|
|
Approved in E-Plan Review. TLW
|
Routing - Erosion and Sediment | 1/8/2016 | | 2/9/2016 | | PASS |
Evan Jenkins
|
|
|
Approved in E-Plan Review. TLW
|
Routing Off Site - STRUCTURAL | 1/8/2016 | | 2/9/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing PW Drainage | 1/11/2016 | | 2/9/2016 | | FAIL |
Jim Wyllie
|
|
|
|
Routing PW Solid Waste | 1/11/2016 | | 2/9/2016 | | PASS |
Megan Durrell
|
|
|
Approved in E-Plan Review. TLW
|
Routing PW Environmental | 1/11/2016 | | 2/9/2016 | | PASS |
Rick Christenson
|
|
|
Approved in E-Plan Review. TLW
|
Routing PW Flood Plain | 1/11/2016 | | 2/9/2016 | | FAIL |
Jim Wyllie
|
|
|
|
1st review completed | | | 2/9/2016 | | DONE |
|
|
|
|
Routing - Design Review | 1/8/2016 | | 2/9/2016 | | PASS |
Josh Wilson
|
|
|
Approved in E-Plan Review. TLW DRH15-00490
|
Routing - PLAN CHECK | 1/8/2016 | | 2/9/2016 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 1/8/2016 | | 2/9/2016 | | FAIL |
Daryl Spivey
|
|
|
|
Routing - PLANNING Land Div | 1/8/2016 | | 2/9/2016 | | PASS |
Tim L. Woodard
|
|
|
Approved in E-Plan Review. TLW
|
Routing - Addressing | 1/8/2016 | | 1/14/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - FIRE | 1/8/2016 | 1/8/2016 | 1/12/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Pending Assignment by TLW | 1/8/2016 | | 1/8/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 1/5/2016 | | PASS |
|
|
|
|
Intake Approval | | | 12/22/2015 | | FAIL |
Javier Guzman
|
|
|
Please provide the following, Incomplete submittals will not be accepted:
• Shallow Injection Well Inventory form Drainage plans with seepage beds must submit a “Shallow Injection Well Inventory” form from the Idaho Department of Water Resources available at: http://www.idwr.idaho.gov/RulesStatutesForms/WellConstruction/WellFormsRules.htm#Inj
• Site Drainage Report stamped and signed by an Idaho licensed design professional including descriptive narrative and calculations
• Planning & Zoning letter(s) of approval – i.e. Conditional Use Permit (CUP), Design Review Permit (DRH) and/or other approval documents
• Verification of Legal Lot or Parcel form signed and approved by PDS Subdivision Staff
• Code Analysis/Building Data on front sheet of plans which includes: Code year, occupancy group(s), construction type(s), floor areas for all floors & building total floor area, building height, fire suppression system (specify NFPA code applicable), fire alarm or smoke control system.
|
Application received | | 12/22/2015 | | | |
|
|
|
|