Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-04486
StatusFinaled
Name PENTALON CONSTRUCTION
Site Address 2972 E PARKCENTER BLVD
Project NameArboretum at Barber Station B2
Customer NumberBLD15-04472 EPLAN
ePlanReview 
Description
(ARBORETUM - Building #2 – Foundation and Podium Permit) This permit is to construct the structural foundation and podium for the first floor of a new 25,021 square foot IA building being constructed in compliance with section 510.2 of the 2012 IBC. Scope of work includes: site work, footings, foundations, and structural concrete up to and including the post-tension concrete podium slab. This building will be fully fire sprinklered in order to fully comply with requirements of section 510.2. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  7/26/2018 DONE
Scope of work completed under BLD16-01059
Zoning Approval6/28/20186/28/20186/28/2018 DONE
DetailsAndrea Tuning
BLD-Ceiling Grid Inspection11/21/201711/21/201711/21/2017PPART
DetailsBrandon Shaw
levels 2 and 3 corridor ceilings.
BLD-Concrete4/25/20174/25/20174/25/2017PPEND
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Michael West
WIP.
BLD-Framing/Rough-in2/28/20172/28/20172/28/2017ACANC
DetailsJim Sly
Pre-rock at bathtubs for units 501-510 and 401-410. Phone #: ###-#### Inspection requested via web by Michael West
Canc. by Contr.
BLD-Foundation1/26/20171/27/20171/27/2017APEND
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Michael West. Non load bearing masonry screen wall, ok pending special inspection. Work in progress.
BLD-Concrete10/4/201610/4/201610/4/2016PPASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Michael West
BLD-Concrete9/15/20169/16/20169/16/2016PPASS
DetailsPhil Shearer
PT Deck Phone #: ###-#### Inspection requested via web by Michael West. 1st half
BLD-Concrete8/2/20168/3/20168/3/2016PPEND
DetailsPhil Shearer
Building SOG and concrete walls Phone #: ###-#### Inspection requested via web by Michael West. Pending MTI inspection
BLD-Concrete7/28/20167/29/20167/29/2016APEND
DetailsPhil Shearer
building slab on grade Phone #: ###-#### Inspection requested via web by Michael West. Pending MTI inspection
BLD-Foundation7/18/20167/19/20167/19/2016PPASS
DetailsPhil Shearer
columns and foundation walls Phone #: ###-#### Inspection requested via web by Michael West
BLD-Foundation7/13/20167/15/20167/15/2016APEND
DetailsPhil Shearer
foundation walls and columns. Concrete is scheduled for 9:45 am. Phone #: ###-#### Inspection requested via web by Michael West. Pending MTI inspection
BLD-Foundation7/8/20167/11/20167/11/2016APASS
DetailsPhil Shearer
Columns and walls Phone #: ###-#### Inspection requested via web by Michael West
BLD-Foundation7/7/20167/8/20167/8/2016ACANC
DetailsPhil Shearer
Columns Special inspection is scheduled for 10:00 am. Inspection requested via web by Michael West
BLD-Foundation7/6/20167/6/20167/6/2016PPASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Michael West
BLD-Footing6/29/20166/30/20166/30/2016PPASS
DetailsPhil Shearer
Balance of building footings Phone #: ###-#### Inspection requested via web by Michael West
BLD-Footing6/22/20166/24/20166/24/2016PPEND
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Michael West. Pending MTI inspection
BLD-Conference6/22/20166/23/20166/23/2016ADONE
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Michael West
Issue PAID IN FULL permit  5/23/2016 DONE
Inspection Record Card- Bld  5/23/2016 DONE
Permit Ready to Issue  4/11/2016 DONE
DetailsChristina Prado
All requirements met 5/18/16

Still need ACHD & RP as of 5/10/16 ///C_P

need ACHD, RP, GC & rev cert of val
Routing Off Site - STRUCTURAL3/21/2016 4/1/2016 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  4/1/2016 DONE
Plan assigned to (TLW)1/8/2016 4/1/2016 PASS
DetailsTim L. Woodard
Plan resubmittals received  3/21/2016 DONE
Routing Off Site - STRUCTURAL3/9/2016 3/11/2016 FAIL
DetailsTim L. Woodard
Routing PW Flood Plain3/9/2016 3/11/2016 PASS
DetailsJim Wyllie
Approved in E-Plan Review. TLW
Routing - PLAN CHECK3/9/2016 3/11/2016 PASS
DetailsTim L. Woodard
Routing - PLUMBING3/9/2016 3/10/2016 PASS
DetailsDaryl Spivey
Approved in E-Plan. TLW
Routing PW Drainage3/9/2016 3/10/2016 PASS
DetailsJim Wyllie
Approved in E-Plan Review. TLW
Plan resubmittals received  3/9/2016 DONE
DetailsTim L. Woodard
Route to Impact Fee Review2/9/20162/12/20162/10/2016 PASS
DetailsCindy M. Gould
Routing - PUBLIC WORKS1/8/2016 2/9/2016 PASS
DetailsJennifer Bruner
Approved in E-Plan Review. TLW
Routing - Erosion and Sediment1/8/2016 2/9/2016 PASS
DetailsEvan Jenkins
Approved in E-Plan Review. TLW
Routing Off Site - STRUCTURAL1/8/2016 2/9/2016 FAIL
DetailsTim L. Woodard
Routing PW Drainage1/11/2016 2/9/2016 FAIL
DetailsJim Wyllie
Routing PW Solid Waste1/11/2016 2/9/2016 PASS
DetailsMegan Durrell
Approved in E-Plan Review. TLW
Routing PW Environmental1/11/2016 2/9/2016 PASS
DetailsRick Christenson
Approved in E-Plan Review. TLW
Routing PW Flood Plain1/11/2016 2/9/2016 FAIL
DetailsJim Wyllie
1st review completed  2/9/2016 DONE
Routing - Design Review1/8/2016 2/9/2016 PASS
DetailsJosh Wilson
Approved in E-Plan Review. TLW DRH15-00490
Routing - PLAN CHECK1/8/2016 2/9/2016 FAIL
DetailsTim L. Woodard
Routing - PLUMBING1/8/2016 2/9/2016 FAIL
DetailsDaryl Spivey
Routing - PLANNING Land Div1/8/2016 2/9/2016 PASS
DetailsTim L. Woodard
Approved in E-Plan Review. TLW
Routing - Addressing1/8/2016 1/14/2016 PASS
DetailsLaura Hunter
Routing - FIRE1/8/20161/8/20161/12/2016 PASS
DetailsKatie Marron
Comments attached to case.
Pending Assignment by TLW1/8/2016 1/8/2016 DONE
DetailsTim L. Woodard
Intake Approval  1/5/2016 PASS
Intake Approval  12/22/2015 FAIL
DetailsJavier Guzman
Please provide the following, Incomplete submittals will not be accepted:
• Shallow Injection Well Inventory form Drainage plans with seepage beds must submit a “Shallow Injection Well Inventory” form from the Idaho Department of Water Resources available at: http://www.idwr.idaho.gov/RulesStatutesForms/WellConstruction/WellFormsRules.htm#Inj
• Site Drainage Report stamped and signed by an Idaho licensed design professional including descriptive narrative and calculations
• Planning & Zoning letter(s) of approval – i.e. Conditional Use Permit (CUP), Design Review Permit (DRH) and/or other approval documents
• Verification of Legal Lot or Parcel form signed and approved by PDS Subdivision Staff
• Code Analysis/Building Data on front sheet of plans which includes: Code year, occupancy group(s), construction type(s), floor areas for all floors & building total floor area, building height, fire suppression system (specify NFPA code applicable), fire alarm or smoke control system.
Application received 12/22/2015