BLD-Final | 7/15/2016 | 7/18/2016 | 7/18/2016 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Mike McHargue
|
Letter of compliance/Occupancy | | | 7/18/2016 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 7/18/2016 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 7/18/2016 | | DONE |
|
|
|
|
BLD-Final | 7/14/2016 | 7/15/2016 | 7/15/2016 | P | NR |
Phil Shearer
|
|
|
TI Final Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Ceiling Grid Inspection | 7/14/2016 | 7/15/2016 | 7/15/2016 | P | PASS |
Phil Shearer
|
|
|
TI Final Phone #: ###-#### Inspection requested via web by Mike McHargue
|
FIRE-Final Inspection | 7/14/2016 | 7/15/2016 | 7/15/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Hardware to the east room to be changed so that people are not directed to a locked door.
|
Zoning Approval | 7/15/2016 | 7/15/2016 | 7/15/2016 | | PASS |
Josh Wilson
|
|
|
|
BLD-Energy code compliance | 5/24/2016 | 5/24/2016 | 5/24/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 5/19/2016 | 5/20/2016 | 5/20/2016 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 5/19/2016 | 5/19/2016 | 5/19/2016 | P | DEFR |
Mike Jordan
|
|
|
Shell Framing Inspection Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Wall Bracing | 4/27/2016 | 4/27/2016 | 4/27/2016 | P | PASS |
Mike Jordan
|
|
|
Exterior Wall Shear Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Wall Bracing | 4/21/2016 | 4/21/2016 | 4/21/2016 | P | PASS |
Mike Jordan
|
|
|
Roof Sheer and Straps Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Wall Bracing | 4/19/2016 | 4/20/2016 | 4/20/2016 | A | FAIL |
Mike Jordan
|
|
|
Flat roof sheer nailing, hold downs, column anchor nuts Phone #: ###-#### Inspection requested via web by Mike McHargue. Roof nailing for diaphragm. Needs to renail, fasteners over spaced.
|
BLD-Concrete | 3/10/2016 | 3/11/2016 | 3/11/2016 | P | PASS |
Mike Jordan
|
|
|
Interior slab thick-end footings Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Energy code compliance | 3/3/2016 | 3/3/2016 | 3/3/2016 | P | PASS |
Mike Jordan
|
|
|
Foundation Insulation Early PM if possible Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Energy code compliance | 3/2/2016 | 3/3/2016 | 3/3/2016 | A | NR |
Mike Jordan
|
|
|
Foundation insulation inspection mid to late morning if possible Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Foundation | 2/29/2016 | 2/29/2016 | 2/29/2016 | P | PASS |
Mike Jordan
|
|
|
Stemwall rebar, late PM if possible Phone #: ###-#### Inspection requested via web by Mike McHargue. Perimeter stemwall and interior column pad footings ok.
|
BLD-Footing | 2/26/2016 | 2/26/2016 | 2/26/2016 | P | PASS |
Mike Jordan
|
|
|
Footing rebar inspection, ready at 2PM Phone #: ###-#### Inspection requested via web by Mike McHargue. Permiter footings ok.
|
BLD-Conference | 2/25/2016 | 2/26/2016 | 2/26/2016 | A | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Mike McHargue
|
Issue PAID IN FULL permit | | | 2/18/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/18/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 2/17/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 12/24/2015 | 12/24/2015 | 2/17/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st reivew completed New building
|
Routing - PLUMBING | 2/16/2016 | | 2/17/2016 | | PASS |
Bill VanDegrift
|
|
|
redlined plan,
1) install rain water piping to service drain to the east
|
Routing - PLAN CHECK | 2/16/2016 | | 2/17/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/17/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/17/2016 | | DONE |
Christina Prado
|
|
|
Need ACHD, RP, GC Form & Revised Certificate of value for issuance
|
Routing - PLAN CHECK | 2/1/2016 | | 2/10/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 2/1/2016 | | 2/10/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Design | 2/1/2016 | | 2/10/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - MECHANICAL | 2/3/2016 | | 2/3/2016 | | PASS |
Troy James
|
|
|
No mechanical plans for shell and core. Mechanical design will be with the T.I. permit.
|
Routing - MECHANICAL | 2/1/2016 | | 2/2/2016 | | FAIL |
Troy James
|
|
|
previous review comment has not been addressed. Sent an email to applicant.
|
Routing - PLUMBING | 2/1/2016 | | 2/2/2016 | | FAIL |
Daryl Spivey
|
|
|
Mark up not addressed on C 1 and does not meet cross sectional venting requirements on P 1.
|
Route to Impact Fee Review | 1/21/2016 | 1/24/2016 | 1/21/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 1/21/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 12/24/2015 | | 1/21/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 12/24/2015 | | 1/20/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Design | 12/28/2015 | | 1/13/2016 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Clarify which sewer service is intended to serve the building. You may want to verfiy that the location of the waste existing the building works with using an existing sewer service.
|
Routing PW Solid Waste | 12/28/2015 | | 1/5/2016 | | PASS |
|
|
|
|
Routing - MECHANICAL | 12/24/2015 | | 12/31/2015 | | FAIL |
Troy James
|
|
|
|
Routing - Design Review | 12/24/2015 | | 12/30/2015 | | PASS |
Josh Wilson
|
|
|
|
Routing PW Sewer Rating | 12/28/2015 | | 12/29/2015 | | PASS |
Rachael Beierle
|
|
|
|
Routing - FIRE | 12/24/2015 | 12/24/2015 | 12/28/2015 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing PW Drainage | 12/28/2015 | | 12/28/2015 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLUMBING | 12/24/2015 | | 12/28/2015 | | FAIL |
Daryl Spivey
|
|
|
12.56 inches of venting required
civil plan does not show a system on the east side of the building
|
Routing - PLANNING Land Div | 12/24/2015 | | 12/28/2015 | | PASS |
Dave Abo
|
|
|
Parcel A of ROS #10045
|
Routing - Addressing | 12/24/2015 | | 12/28/2015 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 12/24/2015 | | 12/28/2015 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 12/24/2015 | | 12/28/2015 | | PASS |
Andy J. Long
|
|
|
ESC site plan and narrative submitted and approved. Valid RP. Site has active construction already in progress. Site prep/pre-construction conference required, call ###-####
|
Intake Approval | | | 12/24/2015 | | PASS |
|
|
|
|
Pending Assignment by TLW | 12/24/2015 | | 12/24/2015 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 12/23/2015 | | FAIL |
Javier Guzman
|
|
|
Please provide the following: Incomplete submittals will not be accepted.
• Owners signature on form #304
• Checklist Clarification of Specification Books or incorporated within building plans
• Verification of Legal Lot or Parcel form signed and approved by PDS Subdivision Staff
|
Application received | | | 12/22/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 22 2015 11:14AM
|