Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD15-04493
StatusFinaled
Name BB ENTERPRISES INC
Site Address 1114 W FRONT ST Unit: 102
Project NameManfred's
Customer Number 
ePlanReviewYes
Description
(MANFRED'S) See Building Official approval for 2015 public restroom access. This building does NOT have a fire sprinkler. Permit to remodel for an existing storage room into a 772sq ft kitchen and pick-up facility within an existing building there is not dining area provided for this tenant. This is an independent space, separate tenant, in the building shared with Woodland Empire Craft Brewing BLD13-02128. Work to include reinforcing the roof structure to support rooftop equipment, new Type I hood, kitchen equipment, concrete landing and ramp in right of way, walk-in cooler, interior finish, interior walls, mechanical work, plumbing work and electrical work. New opening in wall located on property line.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 8/22/20168/31/2016 DONE
This permit finaled on the web by Stephanie Boomgarden
First Notice 8/1/20168/12/2016 DONE
DetailsCarlos Velazquez
Permanent Occupancy  7/22/2016 DONE
BLD-Final7/21/20167/21/20167/21/2016PPASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Final6/21/20166/22/20166/22/2016APART
DetailsDave Hannah
Brandon Phone #: ###-#### ok for temp occ needs mec perm occ and sales cou nter installed
Zoning Approval6/22/20166/22/20166/22/2016 DONE
DetailsAndrea Tuning
FIRE-Final Inspection6/20/20166/21/20166/21/2016PPASS
DetailsJim Page
No fire sprinklers, no fire alarms, commercial hood suppression system inspection complete. Final life fire safety inspection passed/complete.
BLD-Ceiling Grid Inspection6/13/20166/14/20166/14/2016APASS
DetailsDave Hannah
t-bar; Brandon Phone #: ###-####
BLD-Energy code compliance5/11/20165/11/20165/12/2016PPASS
DetailsDave Hannah
Insulation // Brandon Phone #: ###-####
BLD-Framing/Rough-in5/10/20165/10/20165/11/2016PPASS
DetailsDave Hannah
Brandon Phone #: ###-####
Print Occupancy Form  4/15/2016 DONE
Issue PAID IN FULL permit  4/15/2016 DONE
OVERRIDE  4/4/2016  
Plan assigned to (AJS)1/21/20161/21/20164/4/2016 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Level 3 TI - ePlanReview - Manfred's
PLANS/APPL TAKEN TO FRONT DESK  4/4/2016 DONE
Permit Ready to Issue  4/4/2016 DONE
***ALL MET*** Needs; GC Form, Rev Cert of Value, RP
Routing - PLAN CHECK3/31/2016 4/4/2016 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PLUMBING3/31/2016 4/1/2016 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Design Review3/31/2016 3/31/2016 PASS
DetailsJosh Wilson
Ok per revised elevations on file with CZC16-00005
Routing - PLUMBING3/28/2016 3/30/2016 CANC
DetailsBill VanDegrift
plumbing sheets revised
waiting for another revised set from engineer
Routing - PLAN CHECK3/21/2016 3/30/2016 FAIL
DetailsAdele J Schaffeld-Griffin
pending planning approval
Routing - Design Review3/21/2016 3/28/2016 FAIL
DetailsJosh Wilson
Revised elevations do not match those approved with CZC16-00005.
Routing - MECHANICAL3/28/2016 3/28/2016 PASS
DetailsTroy James
redlined plans
Routing PW Environmental1/22/2016 2/12/2016 PASS
DetailsRick Christenson
Grease Trap shown.
1st review completed  2/12/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK1/21/2016 2/12/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - MECHANICAL1/21/2016 1/28/2016 PASS
DetailsTroy James
redlined plans
Routing - PLUMBING1/21/2016 1/26/2016 PASS
DetailsBill VanDegrift
pipe condensate to indirect waste receptor
Routing - Design Review1/21/2016 1/25/2016 PASS
DetailsJosh Wilson
Ok per CZC16-00005
Routing - FIRE1/21/20161/21/20161/22/2016 PASS
DetailsScott Arellano
Comments attached to case.
Routing - Erosion and Sediment1/21/2016 1/22/2016 PASS
DetailsEvan Jenkins
(MANFRED'S) Remodel for a 772sq ft kitchen and pick-up facility within an existing building. This is an independent space in the building shared with Woodland Empire Craft Brewing. Work to include structurally reinforcing the roof structure to support rooftop equipment, new Type I hood, kitchen equipment, concrete landing and ramp, walk-in cooler, interior finish, interior walls, mechanical work, plumbing work and electrical work.
Routing - Addressing1/21/2016 1/22/2016 PASS
DetailsLaura Hunter
Added suite number
Routing - PUBLIC WORKS1/21/2016 1/22/2016 PASS
DetailsRachael Beierle
Intake Approval  1/21/2016 PASS
DetailsJason Blais
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.
Plan Reviewer's activity  1/20/2016 DONE
DetailsAdele J Schaffeld-Griffin
recieved call from Shawn at Trout Architects. The engineer is out of the office this week. Shawn will email me the engineering next week to up load.
Intake Approval  1/13/2016 FAIL
DetailsAdele J Schaffeld-Griffin
Items that are missing are indicated on the submittal check list.
Application received  12/22/2015 DONE
Application submitted via PDS Online on Dec 22 2015 11:30AM
Pending Assignment by JCB1/21/2016    
DetailsJason Blais