BLD-Final | 4/6/2016 | 4/6/2016 | 4/6/2016 | P | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
DOC - Permit Finaled | 4/6/2016 | 4/6/2016 | 4/6/2016 | P | PASS |
Mike Jordan
|
|
|
All issues resolved.
|
BLD-Final | 3/30/2016 | 3/30/2016 | 3/30/2016 | P | FAIL |
Mike Jordan
|
|
|
joe Phone #: ###-####. Provide the required energy cert and post. Provide the blower door test result and post or the 3rd. party airseal inspection report. The step to patio from rear slider exceeds the 7.75 max rise. Correction notice posted.
|
BLD-Energy code compliance | 2/17/2016 | 2/17/2016 | 2/17/2016 | P | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 2/17/2016 | 2/17/2016 | 2/17/2016 | P | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 2/16/2016 | 2/16/2016 | 2/16/2016 | P | FAIL |
Mike Jordan
|
|
|
Joe Phone #: ###-####. iNstll straps for portal frame, interior side at rear slider. Strap or provid rbeam pocket for the double 2x12 in garage. ok to insulate. Correction notice posted.
|
BLD-Framing/Rough-in | 2/11/2016 | 2/12/2016 | 2/12/2016 | P | FAIL |
Phil Shearer
|
|
|
Joe Phone #: ###-####. NO truss bracing Engineering onsite, Need fireplace rough in inspection.
|
BLD-Wall Bracing | 2/1/2016 | 2/1/2016 | 2/1/2016 | P | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Foundation | 1/15/2016 | 1/15/2016 | 1/15/2016 | P | PART |
Mike Jordan
|
|
|
Rob Phone #: ###-####
|
BLD-Footing | 1/13/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/12/2016 | | DONE |
|
|
|
|
Telephone call | | | 1/5/2016 | | DONE |
|
|
|
Spoke with Joe informing him that the permit is ready to be picked up and the fee amount that is due
|
OVERRIDE | | | 1/4/2016 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/4/2016 | | DONE |
|
|
|
|
1st review completed | | | 1/4/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/4/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/4/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/4/2016 | | DONE |
|
|
|
requirements met
|
Plan assigned to (LEG) Tisha | 12/22/2015 | | 1/4/2016 | | DONE |
Tisha Gallop
|
|
|
1/5
|
Routing - PLAN CHECK | 12/31/2015 | | 1/4/2016 | | PASS |
Tisha Gallop
|
|
|
|
Routing - PUBLIC WORKS | 12/22/2015 | | 1/4/2016 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - MECHANICAL | 12/28/2015 | | 12/31/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | | | 12/28/2015 | | PASS |
|
|
|
|
Routing - Addressing | 12/22/2015 | | 12/23/2015 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/22/2015 | | DONE |
|
|
|
|
Intake Approval | | | 12/22/2015 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/22/2015 | | DONE |
|
|
|
|
Application received | | 12/22/2015 | | | |
|
|
|
|